{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,21]],"date-time":"2026-02-21T18:15:52Z","timestamp":1771697752229,"version":"3.50.1"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2014,1,29]],"date-time":"2014-01-29T00:00:00Z","timestamp":1390953600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2015,10]]},"DOI":"10.1007\/s10845-014-0875-x","type":"journal-article","created":{"date-parts":[[2014,1,27]],"date-time":"2014-01-27T20:25:11Z","timestamp":1390854311000},"page":"845-859","source":"Crossref","is-referenced-by-count":31,"title":["Job-shop cell-scheduling problem with inter-cell moves and automated guided vehicles"],"prefix":"10.1007","volume":"26","author":[{"given":"Chengkuan","family":"Zeng","sequence":"first","affiliation":[]},{"given":"Jiafu","family":"Tang","sequence":"additional","affiliation":[]},{"given":"Chongjun","family":"Yan","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,1,29]]},"reference":[{"issue":"2","key":"875_CR1","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1080\/0020754032000123579","volume":"42","author":"TF Abdelmaguid","year":"2004","unstructured":"Abdelmaguid, T. F., Nassef, A. O., Kamal, B. A., & Hassan, M. F. (2004). A hybrid GA\/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research, 42(2), 267\u2013281.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"875_CR2","doi-asserted-by":"crossref","first-page":"1695","DOI":"10.1007\/s10845-010-0471-7","volume":"23","author":"A Alfieri","year":"2012","unstructured":"Alfieri, A., Cantamessa, M., Monchiero, A., & Montagna, F. (2012). Heuristics for puzzle-based storage systems driven by a limited set of automated guided vehicles. Journal of Intelligent Manufacturing, 23(5), 1695\u20131705.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"875_CR3","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1016\/S0377-2217(99)00486-5","volume":"127","author":"J Blazewicz","year":"2000","unstructured":"Blazewicz, J., Pesch, E., & Sterna, M. (2000). The disjunctive graph machine representation of the job shop scheduling problem. European Journal of Operational Research, 127(2), 317\u2013331.","journal-title":"European Journal of Operational Research"},{"issue":"4\u20135","key":"875_CR4","doi-asserted-by":"crossref","first-page":"453","DOI":"10.1007\/s10845-005-1657-2","volume":"16","author":"T Cakar","year":"2005","unstructured":"Cakar, T., Yildirim, M. B., & Barut, M. (2005). A neuro-genetic approach to design and planning of a manufacturing cell. Journal of Intelligent Manufacturing, 16(4\u20135), 453\u2013462.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"875_CR5","doi-asserted-by":"crossref","first-page":"706","DOI":"10.1016\/j.ejor.2008.03.051","volume":"199","author":"A Caumond","year":"2009","unstructured":"Caumond, A., Lacomme, P., Moukrim, A., & Tchernev, N. (2009). An MILP for scheduling problems in an FMS with one vehicle. European Journal of Operational Research, 199(3), 706\u2013722.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"875_CR6","doi-asserted-by":"crossref","first-page":"1473","DOI":"10.1007\/s11771-011-0863-7","volume":"18","author":"IA Chaudhry","year":"2011","unstructured":"Chaudhry, I. A., Mahmood, S., & Shami, M. (2011). Simultaneous scheduling of machines and automated guided vehicles in flexible manufacturing systems using genetic algorithms. Journal of Central South University of Technology, 18(5), 1473\u20131486.","journal-title":"Journal of Central South University of Technology"},{"issue":"1","key":"875_CR7","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1007\/BF00114139","volume":"7","author":"CJ Chen","year":"1996","unstructured":"Chen, C. J., & Tseng, C. S. (1996). The path and location planning of workpieces by genetic algorithms. Journal of Intelligent Manufacturing, 7(1), 69\u201376.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"8","key":"875_CR8","doi-asserted-by":"crossref","first-page":"2143","DOI":"10.1080\/00207540600818286","volume":"46","author":"L Deroussi","year":"2008","unstructured":"Deroussi, L., Gourgand, M., & Tchernev, N. (2008). A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research, 46(8), 2143\u20132164.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"875_CR9","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1016\/j.cie.2011.03.007","volume":"61","author":"A Elmi","year":"2011","unstructured":"Elmi, A., Solimanpur, M., & Topaloglu, S. (2011). A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Computer & Industrial Engineering, 61(1), 171\u2013178.","journal-title":"Computer & Industrial Engineering"},{"issue":"3","key":"875_CR10","doi-asserted-by":"crossref","first-page":"3056","DOI":"10.1016\/j.asoc.2010.12.006","volume":"11","author":"O Engin","year":"2011","unstructured":"Engin, O., Ceran, G., & Yilmaz, M. K. (2011). An efficient genetic algorithm for hybrid flow shop scheduling with multiprocessor task problems. Applied Soft Computing, 11(3), 3056\u20133065.","journal-title":"Applied Soft Computing"},{"issue":"2","key":"875_CR11","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1016\/j.ijpe.2007.02.031","volume":"111","author":"H Hendizadeh","year":"2008","unstructured":"Hendizadeh, H., Faramarzi, H., Mansouri, S. A., Gupta, J. N. D., & Elmekkawy, T. Y. (2008). Meta-heuristics for scheduling a flowshop manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111(2), 593\u2013605.","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"875_CR12","doi-asserted-by":"crossref","first-page":"977","DOI":"10.1007\/s10845-011-0581-x","volume":"23","author":"KS Hong","year":"2012","unstructured":"Hong, K. S., Yeo, S., Kim, H., Chew, E., & Lee, C. (2012). Integrated inventory and transportation decision for ubiquitous supply chain management. Journal of Intelligent Manufacturing, 23(4), 977\u2013988.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1\u20132","key":"875_CR13","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1016\/S0166-218X(01)00273-6","volume":"119","author":"J Hurink","year":"2002","unstructured":"Hurink, J., & Knust, S. (2002). A tabu search algorithm for scheduling a single robot in a job-shop environment. Discrete Applied Mathematics, 119(1\u20132), 181\u2013203.","journal-title":"Discrete Applied Mathematics"},{"issue":"1","key":"875_CR14","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.ejor.2003.10.034","volume":"162","author":"J Hurink","year":"2005","unstructured":"Hurink, J., & Knust, S. (2005). Tabu search algorithms for job-shop problems with a single transport robot. European Journal of Operational Research, 162(1), 99\u2013111.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"875_CR15","doi-asserted-by":"crossref","first-page":"2055","DOI":"10.1080\/00207540802275889","volume":"47","author":"I Kaku","year":"2009","unstructured":"Kaku, I., Gong, J., Tang, J. F., & Yin, Y. (2009). Modeling and numerical analysis of line-cell conversion problems. International Journal of Production Research, 47(8), 2055\u20132078.","journal-title":"International Journal of Production Research"},{"key":"875_CR16","doi-asserted-by":"crossref","unstructured":"Kaku, I., Gong, J., Tang, J. F., & Yin, Y. (2011). A review: practice and theory in line-cell conversion. Assembly Line-Theory and Practice, 107\u2013130.","DOI":"10.5772\/19895"},{"issue":"4","key":"875_CR17","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1007\/s10845-009-0314-6","volume":"22","author":"N Khilwani","year":"2011","unstructured":"Khilwani, N., Ulutas, B. H., Islier, A. A., & Tiwari, M. K. (2011). A methodology to design virtual cellular manufacturing systems. Journal of Intelligent Manufacturing, 22(4), 533\u2013544.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"875_CR18","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1016\/j.ijpe.2010.07.012","volume":"143","author":"P Lacomme","year":"2013","unstructured":"Lacomme, P., Larabi, M., & Tchernev, N. (2013). Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Economics, 143(1), 24\u201334.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"875_CR19","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1007\/s10845-009-0278-6","volume":"22","author":"SJ Landry","year":"2011","unstructured":"Landry, S. J. (2011). Human centered design in the air traffic control system. Journal of Intelligent Manufacturing, 22(1), 65\u201372.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"5","key":"875_CR20","first-page":"2007","volume":"40","author":"DN Li","year":"2013","unstructured":"Li, D. N., Wang, Y., & Xiao, G. X. (2013). Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes. Computers & Operations Research, 40(5), 2007\u20132023.","journal-title":"Computers & Operations Research"},{"issue":"2","key":"875_CR21","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1016\/j.ijpe.2011.01.004","volume":"130","author":"SW Lin","year":"2011","unstructured":"Lin, S. W., Ying, K. C., Lu, C. C., & Gupta, J. N. D. (2011). Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 130(2), 246\u2013254.","journal-title":"International Journal of Production Economics"},{"issue":"21","key":"875_CR22","doi-asserted-by":"crossref","first-page":"5959","DOI":"10.1080\/00207540802165817","volume":"47","author":"B Naderi","year":"2009","unstructured":"Naderi, B., Zandieh, M., & Fatemi Ghomi, S. M. T. (2009). Scheduling job shop problems with sequence-dependent setup times. International Journal of Production Research, 47(21), 5959\u20135976.","journal-title":"International Journal of Production Research"},{"key":"875_CR23","doi-asserted-by":"crossref","unstructured":"Reddy, B. S. P., & Rao, C. S. P. (2006). A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS. International Journal of Advanced Manufacturing Technology, 31(5\u20136), 602\u2013613.","DOI":"10.1007\/s00170-005-0223-6"},{"key":"875_CR24","doi-asserted-by":"crossref","unstructured":"Ren, Q. D. E. J., & Wang, Y. P. (2012). A new hybrid genetic algorithm for job shop scheduling problem. Computers & Operations Research, 39(10), 2291\u20132299.","DOI":"10.1016\/j.cor.2011.12.005"},{"issue":"1\u20132","key":"875_CR25","doi-asserted-by":"crossref","first-page":"18","DOI":"10.1504\/IJASM.2008.019597","volume":"3","author":"M Saravanan","year":"2008","unstructured":"Saravanan, M., & Haq, A. N. (2008). A scatter search method to minimise make-span of cell scheduling problem. International Journal of Agile Systems and Management, 3(1\u20132), 18\u201336.","journal-title":"International Journal of Agile Systems and Management"},{"issue":"2","key":"875_CR26","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1080\/002075400189419","volume":"38","author":"J Schaller","year":"2000","unstructured":"Schaller, J. (2000). A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell. International Journal of Production Research, 38(2), 287\u2013308.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"875_CR27","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1023\/B:JIMS.0000010078.30713.e9","volume":"15","author":"CR Schrich","year":"2004","unstructured":"Schrich, C. R., Armentano, V. A., & Laguna, M. (2004). Tardiness minimization in a flexible job shop: A tabu search approach. Journal of Intelligent Manufacturing, 15(1), 103\u2013115.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"875_CR28","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0360-8352(97)00147-2","volume":"34","author":"HM Selim","year":"1998","unstructured":"Selim, H. M., Askin, R. G., & Vakharia, A. J. (1998). Cell formation in group technology: Review, evaluation and directions for future research. Computers & Industrial Engineering, 34(1), 3\u201320.","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"875_CR29","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/S0925-5273(03)00196-8","volume":"88","author":"M Solimanpur","year":"2004","unstructured":"Solimanpur, M., Vrat, P., & Shankar, R. (2004). A Heuristic to minimize makespan of cell scheduling problem. International Journal of Production Economics, 88(3), 231\u2013241.","journal-title":"International Journal of Production Economics"},{"issue":"1\u20134","key":"875_CR30","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/0360-8352(92)90068-U","volume":"23","author":"GA Suer","year":"1992","unstructured":"Suer, G. A. (1992). An algorithm to find the number of parallel stations for optimal cell scheduling. Computers & Industrial Engineering, 23(1\u20134), 81\u201384.","journal-title":"Computers & Industrial Engineering"},{"issue":"6","key":"875_CR31","doi-asserted-by":"crossref","first-page":"2137","DOI":"10.1007\/s10845-011-0560-2","volume":"23","author":"Z Taha","year":"2012","unstructured":"Taha, Z., & Rostam, S. (2012). A hybrid fuzzy AHP-PROMETHEE decision support system for machine tool selection in flexible manufacturing cell. Journal of Intelligent Manufacturing, 23(6), 2137\u20132149.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"875_CR32","doi-asserted-by":"crossref","unstructured":"Tang, J. F., Wang, X., Kaku, I., & Yung, K. L. (2010). Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach. Journal of Intelligent Manufacturing, 21(4), 525\u2013537.","DOI":"10.1007\/s10845-008-0236-8"},{"issue":"3","key":"875_CR33","doi-asserted-by":"crossref","first-page":"2661","DOI":"10.1016\/j.eswa.2009.08.012","volume":"37","author":"R Tavakkoli-Moghaddam","year":"2010","unstructured":"Tavakkoli-Moghaddam, R., Javadian, N., Khorrami, A., & Gholipour-Kanani, Y. (2010). Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system. Expert Systems with Applications, 37(3), 2661\u20132669.","journal-title":"Expert Systems with Applications"},{"issue":"4","key":"875_CR34","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/S0305-0548(96)00061-5","volume":"24","author":"G Ulusoy","year":"1997","unstructured":"Ulusoy, G., Sivrikaya-Serifoglus, F., & Bilge, U. (1997). A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Computers & Operations Research, 24(4), 335\u2013351.","journal-title":"Computers & Operations Research"},{"key":"875_CR35","first-page":"1060","volume":"532\u2013533","author":"JJ Yu","year":"2007","unstructured":"Yu, J. J., Sun, S. D., Si, S. B., Yang, H. G., & Wu, X. L. (2007). A study on the aviation manufacture cell scheduling based on adaptive ant colony algorithm. Materials Science Forum, 532\u2013533, 1060\u20131063.","journal-title":"Materials Science Forum"},{"issue":"1","key":"875_CR36","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/j.ijpe.2012.10.024","volume":"145","author":"R Zhang","year":"2013","unstructured":"Zhang, R., Chang, P. C., & Wu, C. (2013). A hybrid genetic algorithm for the job shop scheduling problem with practical considerations for manufacturing costs: Investigations motivated by vehicle production. International Journal of Production Economics, 145(1), 38\u201352.","journal-title":"International Journal of Production Economics"},{"issue":"11","key":"875_CR37","doi-asserted-by":"crossref","first-page":"3229","DOI":"10.1016\/j.cor.2005.12.002","volume":"34","author":"CY Zhang","year":"2007","unstructured":"Zhang, C. Y., Li, P. G., Guan, Z. L., & Rao, Y. Q. (2007). A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem. Computers & Operations Research, 34(11), 3229\u20133242.","journal-title":"Computers & Operations Research"},{"issue":"7","key":"875_CR38","doi-asserted-by":"crossref","first-page":"1713","DOI":"10.1016\/j.cor.2011.10.007","volume":"39","author":"Q Zhang","year":"2012","unstructured":"Zhang, Q., Manier, H., & Manier, M. A. (2012). A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times. Computers & Operations Research, 39(7), 1713\u20131723.","journal-title":"Computers & Operations Research"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0875-x.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0875-x\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0875-x","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:12:01Z","timestamp":1559254321000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0875-x"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,1,29]]},"references-count":38,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2015,10]]}},"alternative-id":["875"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0875-x","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,1,29]]}}}