{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,15]],"date-time":"2026-05-15T23:46:00Z","timestamp":1778888760989,"version":"3.51.4"},"reference-count":63,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2014,2,14]],"date-time":"2014-02-14T00:00:00Z","timestamp":1392336000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,4]]},"DOI":"10.1007\/s10845-014-0880-0","type":"journal-article","created":{"date-parts":[[2014,2,13]],"date-time":"2014-02-13T20:16:56Z","timestamp":1392322616000},"page":"475-486","source":"Crossref","is-referenced-by-count":155,"title":["Identifying and evaluating enterprise architecture risks using FMEA and fuzzy VIKOR"],"prefix":"10.1007","volume":"27","author":[{"given":"Hossein","family":"Safari","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zahra","family":"Faraji","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Setareh","family":"Majidian","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,2,14]]},"reference":[{"key":"880_CR1","unstructured":"Achachlouei, M. A. (2010). The concept of enterprise architecture in academic research. Master\u2019s Degree Project Essay, Lund: Lund University."},{"key":"880_CR2","volume-title":"The maturity of enterprise architecture and challenges to its evolution in the South African private healthcare service industry","author":"V Ad\u00e3o","year":"2007","unstructured":"Ad\u00e3o, V. (2007). The maturity of enterprise architecture and challenges to its evolution in the South African private healthcare service industry. Pretoria: University of Pretoria."},{"issue":"5","key":"880_CR3","doi-asserted-by":"crossref","first-page":"1445","DOI":"10.1007\/s10845-010-0465-5","volume":"23","author":"B Agrad","year":"2012","unstructured":"Agrad, B., & Barajas, M. (2012). The use of fuzzy logic in product family development: Literature review and opportunities. Journal of Intelligent Manufacturing, 23(5), 1445\u20131462.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"880_CR4","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1016\/j.jpba.2012.02.009","volume":"64\u201365","author":"DM Barends","year":"2012","unstructured":"Barends, D. M., Oldenhof, M. T., Vredenbregt, M. J., & Nauta, M. J. (2012). Risk analysis of analytical validations by probabilistic modification of FMEA. Journal of Pharmaceutical and Biomedical Analysis, 64\u201365, 82\u201386.","journal-title":"Journal of Pharmaceutical and Biomedical Analysis"},{"key":"880_CR5","unstructured":"Bernard, S. A. (2012). An introduction to enterprise architecture (3rd ed.). Author House."},{"key":"880_CR6","unstructured":"Bieberstein, N. (2005) Service-oriented architecture (SOA) compass: Business value, planning, and enterprise roadmap. Upper Saddle River, N.J : IBM Press."},{"issue":"2","key":"880_CR7","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/0951-8320(95)00068-D","volume":"50","author":"JB Bowles","year":"1995","unstructured":"Bowles, J. B., & Pel\u00e1ez, C. E. (1995). Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis. Reliability Engineering & System Safety, 50(2), 203\u2013213.","journal-title":"Reliability Engineering & System Safety"},{"issue":"5\u20136","key":"880_CR8","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1016\/j.matcom.2007.11.015","volume":"77","author":"G B\u00fcy\u00fck\u00f6zkan","year":"2008","unstructured":"B\u00fcy\u00fck\u00f6zkan, G., & Ruan, D. (2008). Evaluation of software development projects using a fuzzy multi-criteria decision approach. Mathematics and Computers in Simulation, 77(5\u20136), 464\u2013475.","journal-title":"Mathematics and Computers in Simulation"},{"issue":"4","key":"880_CR9","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1080\/10429247.2004.11415263","volume":"16","author":"TA Carbone","year":"2004","unstructured":"Carbone, T. A., & Tippett, D. D. (2004). Project risk management using the project risk FMEA. Engineering Management Journal, 16(4), 28\u201335.","journal-title":"Engineering Management Journal"},{"key":"880_CR10","doi-asserted-by":"crossref","unstructured":"Chang, K.-H., & Cheng, C.-H. (2010). A risk assessment methodology using intuitionistic fuzzy set in FMEA. International Journal of Systems Science, 41(12), 1457\u20131471.","DOI":"10.1080\/00207720903353633"},{"issue":"2","key":"880_CR11","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1007\/s10845-009-0266-x","volume":"22","author":"K-H Chang","year":"2011","unstructured":"Chang, K.-H., & Cheng, C.-H. (2011). Evaluation the risk of failure using the fuzzy OWA and DEMATEL method. Journal of Intelligent Manufacturing, 22(2), 113\u2013129.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"880_CR12","doi-asserted-by":"crossref","unstructured":"Chen, W. C., & Chang, H. P. (2012) The application of fuzzy FMEA in the development of new product decision-making\u2014a case study of the solar module industry. Advanced Materials Research, 429, 25\u201330.","DOI":"10.4028\/www.scientific.net\/AMR.429.25"},{"key":"880_CR13","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ijpe.2005.03.009","volume":"102","author":"C-T Chen","year":"2006","unstructured":"Chen, C.-T., Lin, C.-T., & Huang, S.-F. (2006). A fuzzy approach for supplier evaluation and selection in supply chain management. International Journal of Production Economics, 102, 289\u2013301.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"880_CR14","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.ijpe.2008.07.022","volume":"120","author":"LY Chen","year":"2009","unstructured":"Chen, L. Y., & Wang, T.-C. (2009). Optimizing partners\u2019 choice in IS\/IT outsourcing projects: The strategic decision of fuzzy VIKOR. International Journal of Production Economics, 120(1), 233\u2013242.","journal-title":"International Journal of Production Economics"},{"key":"880_CR15","doi-asserted-by":"crossref","unstructured":"Chiang, Z. (2009) Developing an online financial decision support module based on fuzzy MCDM method and open source tools. In International conference on information and financial engineering (pp. 22\u201326). Singapore.","DOI":"10.1109\/ICIFE.2009.28"},{"key":"880_CR16","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1016\/j.cca.2009.03.015","volume":"404","author":"ML Chiozza","year":"2009","unstructured":"Chiozza, M. L., & Ponzetti, C. (2009). FMEA: A model for reducing medical errors. Clinica Chimica Acta, 404, 75\u201378.","journal-title":"Clinica Chimica Acta"},{"key":"880_CR17","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0167-8809(00)00272-3","volume":"86","author":"AMG Cornelissen","year":"2001","unstructured":"Cornelissen, A. M. G., van den Berg, J., Koops, W. J., Grossman, M., & Udo, H. M. J. (2001). Assessment of the contribution of sustainability indicators to. Agriculture, Ecosystems and Environment, 86, 173\u2013185.","journal-title":"Agriculture, Ecosystems and Environment"},{"issue":"1","key":"880_CR18","doi-asserted-by":"crossref","first-page":"46","DOI":"10.7763\/IJMLC.2012.V2.88","volume":"2","author":"MR Davoudi","year":"2012","unstructured":"Davoudi, M. R., & Sheikhvand, K. (2012). An approach towards enterprise architecture analysis using AHP and fuzzy AHP. International Journal of Machine Learning and Computing, 2(1), 46\u201351.","journal-title":"International Journal of Machine Learning and Computing"},{"issue":"12","key":"880_CR19","doi-asserted-by":"crossref","first-page":"1353","DOI":"10.1080\/14783363.2011.625188","volume":"22","author":"Alfred Ebenezer","year":"2011","unstructured":"Ebenezer, Alfred, Devadasan, S. R., Sreenivasa, C. G., & Murugesh, R. (2011). Total failure mode and effects analysis in tea industry: A theoretical treatise. Total Quality Management & Business, 22(12), 1353\u20131369.","journal-title":"Total Quality Management & Business"},{"key":"880_CR20","doi-asserted-by":"crossref","first-page":"463","DOI":"10.5267\/j.ijiec.2011.12.001","volume":"3","author":"S Ebrahimnejad","year":"2012","unstructured":"Ebrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., & Heydard, M. (2012). Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy. International Journal of Industrial Engineering Computations, 3, 463\u2013476.","journal-title":"International Journal of Industrial Engineering Computations"},{"issue":"4","key":"880_CR21","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1080\/18756891.2012.718104","volume":"5","author":"M Ekmek\u00e7io\u011flu","year":"2012","unstructured":"Ekmek\u00e7io\u011flu, M., & Can Kutlu, A. (2012). A fuzzy hybrid approach for fuzzy process FMEA: An application to a spindle manufacturing process. International Journal of Computational Intelligence Systems, 5(4), 611\u2013626.","journal-title":"International Journal of Computational Intelligence Systems"},{"key":"880_CR22","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1016\/j.procs.2012.01.031","volume":"8","author":"RE Giachetti","year":"2012","unstructured":"Giachetti, R. E. (2012). A flexible approach to realize an enterprise architecture. Procedia Computer Science, 8, 147\u2013152.","journal-title":"Procedia Computer Science"},{"key":"880_CR23","doi-asserted-by":"crossref","unstructured":"Huang, Y., Yan Y., & Qiu, Z. W. (2009). Research on supply-chain-based logistics service capability by combination weighting method and fuzzy VIKOR algorithm. In International conference on measuring technology and mechatronics automation.","DOI":"10.1109\/ICMTMA.2009.27"},{"key":"880_CR24","unstructured":"Innerhofer-Oberperfler, F., & Breu, R. (2005). Using an enterprise architecture for it risk management. Innsbruck, Austria: Research Group Quality Engineering Institute of Computer Science \u2013 University of Innsbruck Technikerstr."},{"issue":"2","key":"880_CR25","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1007\/s10796-006-7970-2","volume":"8","author":"H Jonkers","year":"2006","unstructured":"Jonkers, H., Lankhorst, M. M., ter Doest, H. W. L., Arbab, F., Bosma, H., & Wieringa, R. J. (2006). Enterprise architecture: Management tool and blueprint for the organisation. Information Systems Frontiers, 8(2), 63\u201366.","journal-title":"Information Systems Frontiers"},{"key":"880_CR26","doi-asserted-by":"crossref","unstructured":"Kumar, P., & Goel, P. (2002). Product quality optimization using fuzzy set concepts: A case study. Quality Engineering, 15(1), 1\u20138.","DOI":"10.1081\/QEN-120006706"},{"issue":"1","key":"880_CR27","doi-asserted-by":"crossref","first-page":"721","DOI":"10.1016\/j.asoc.2012.08.007","volume":"13","author":"M Kumru","year":"2013","unstructured":"Kumru, M., & Kumru, Y. (2013). Fuzzy FMEA application to improve purchasing process in a public hospital. Applied Soft Computing, 13(1), 721\u2013733.","journal-title":"Applied Soft Computing"},{"key":"880_CR28","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.eswa.2011.06.044","volume":"39","author":"AC Kutlu","year":"2012","unstructured":"Kutlu, A. C., & Ekmek\u00e7io\u011flu, M. (2012). Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP. Expert Systems with Applications, 39, 61\u201367.","journal-title":"Expert Systems with Applications"},{"key":"880_CR29","doi-asserted-by":"crossref","unstructured":"L\u00ea, L.-S., & Wegmann, A. (2012). Hierarchy-oriented modeling of enterprise architecture using reference-model of open distributed processing. Computer Standards & Interfaces, 35(3), 277\u2013293.","DOI":"10.1016\/j.csi.2012.01.008"},{"key":"880_CR30","doi-asserted-by":"crossref","first-page":"828","DOI":"10.1016\/j.eswa.2012.08.010","volume":"40","author":"H-C Liu","year":"2013","unstructured":"Liu, H.-C., Liu, L., & Liu, N. (2013). Risk evaluation approaches in failure mode and effects analysis: A literature review. Expert Systems with Applications, 40, 828\u2013838.","journal-title":"Expert Systems with Applications"},{"key":"880_CR31","unstructured":"Moeinzadeh, P., & Hajfathaliha, A. (2010). A combined fuzzy decision making approach to. International Journal of Human and Social Sciences, 5(13), 859\u2013875."},{"key":"880_CR32","first-page":"524","volume":"25","author":"S Narayanagounder","year":"2009","unstructured":"Narayanagounder, S., & Gurusami, K. (2009). A new approach for prioritization of failure. World Academy of Science, Engineering and Technology, 25, 524\u2013531.","journal-title":"World Academy of Science, Engineering and Technology"},{"key":"880_CR33","unstructured":"Niemi, E., & Tanja, Y. (2006). Defining enterprise architecture risks in business. In Proceedings of the EBRF 2007 conference, Research Forum to Understand Business in Knowledge Society, September 25\u201327 (pp. 1\u201315). Jyv\u00e4skyl\u00e4, Finland."},{"key":"880_CR34","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/19488289.2011.650279","volume":"2","author":"OO Oduntan","year":"2012","unstructured":"Oduntan, O. O., & Park, N. (2012). Enterprise viability model: Extending enterprise architecture frameworks for modeling and analyzing viability under turbulence. Journal of Enterprise Transformation, 2, 1\u201325.","journal-title":"Journal of Enterprise Transformation"},{"key":"880_CR35","doi-asserted-by":"crossref","first-page":"592","DOI":"10.1016\/j.jpba.2010.09.024","volume":"54","author":"MT Oldenhof","year":"2011","unstructured":"Oldenhof, M. T., et al. (2011). Consistency of FMEA used in the validation of analytical procedures. Journal of Pharmaceutical and Biomedical Analysis, 54, 592\u2013595.","journal-title":"Journal of Pharmaceutical and Biomedical Analysis"},{"key":"880_CR36","unstructured":"Opricovic, S. (1998). Multicriteria optimization of civil engineering systems. Belgrade, Serbia."},{"key":"880_CR37","doi-asserted-by":"crossref","unstructured":"Opricovic, S., & Tzeng, G.-H. (2002). Multicriteria planning of post-earthquake sustainable reconstruction. Computer-Aided Civil and Infrastructure Engineering, 17(3), 211\u2013220.","DOI":"10.1111\/1467-8667.00269"},{"issue":"2","key":"880_CR38","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1016\/S0377-2217(03)00020-1","volume":"156","author":"S Opricovic","year":"2004","unstructured":"Opricovic, S., & Tzeng, G.-H. (2004). Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research, 156(2), 445\u2013455.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"880_CR39","doi-asserted-by":"crossref","first-page":"514","DOI":"10.1016\/j.ejor.2006.01.020","volume":"178","author":"S Opricovic","year":"2007","unstructured":"Opricovic, S., & Tzeng, G.-H. (2007). Extended VIKOR method in comparison with outranking methods. European Journal of Operational Research, 178(2), 514\u2013529.","journal-title":"European Journal of Operational Research"},{"key":"880_CR40","doi-asserted-by":"crossref","first-page":"12983","DOI":"10.1016\/j.eswa.2011.04.097","volume":"38","author":"S Opricovic","year":"2011","unstructured":"Opricovic, S. (2011). Fuzzy VIKOR with an application to water resources planning. Expert Systems with Applications, 38, 12983\u201312990.","journal-title":"Expert Systems with Applications"},{"key":"880_CR41","unstructured":"Oraee, K., Yazdani-Chamzini, A., Basiri, M. H. (2011). Evaluating underground mining hazards by fuzzy FMEA. In SME annual meeting & exhibit and CMA 113th national western mining conference \u201cshaping a strong future through mining. Colorado: Denver."},{"key":"880_CR42","doi-asserted-by":"crossref","unstructured":"Ou Yang, Y.-P., Shieh, H.-M., & Tzeng, G.-H. (2013). A VIKOR technique based on DEMATEL and ANP for information security risk control assessment. Information Sciences, 232(20), 482\u2013 500.","DOI":"10.1016\/j.ins.2011.09.012"},{"key":"880_CR43","doi-asserted-by":"crossref","unstructured":"Pal, S., & Gauri, S. K. (2010). Multi-response optimization using multiple regression-based weighted signalto-noise ratio (MRWSN). Quality Engineering, 22(4), 336\u2013350.","DOI":"10.1080\/08982112.2010.495368"},{"issue":"1","key":"880_CR44","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/s10845-011-0551-3","volume":"24","author":"B Pang","year":"2013","unstructured":"Pang, B., & Bai, S. (2013). An integrated fuzzy synthetic evaluation approach for supplier selection based on analytic network process. Journal of Intelligent Manufacturing, 24(1), 163\u2013174.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"880_CR45","first-page":"134","volume":"40","author":"E Ravasizadeh","year":"2011","unstructured":"Ravasizadeh, E., & Kabaranzad, M. R. (2011). Identifying and evaluate e-supply chain. American Journal of Scientific Research, 40, 134\u2013159.","journal-title":"American Journal of Scientific Research"},{"issue":"1","key":"880_CR46","first-page":"206","volume":"6","author":"H Safari","year":"2012","unstructured":"Safari, H., Faghih, A., & Fathi, M. R. (2012). Fuzzy multi-criteria decision making method for facility location selection. African Journal of Business Management, 6(1), 206\u2013212.","journal-title":"African Journal of Business Management"},{"key":"880_CR47","doi-asserted-by":"crossref","first-page":"25","DOI":"10.7494\/dmms.2012.6.1.25","volume":"6","author":"C Samantra","year":"2012","unstructured":"Samantra, C., Datta, S., & Mahapatra, S. S. (2012). Application of fuzzy based VIKOR approach for multi-attribute group decision making (MAGDM): A case study in supplier selection. Decision Making in Manufacturing and Services, 6, 25\u201339.","journal-title":"Decision Making in Manufacturing and Services"},{"key":"880_CR48","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1016\/j.eswa.2009.04.063","volume":"37","author":"A Sanayei","year":"2010","unstructured":"Sanayei, A., Farid Mousavi, S., & Yazdankhah, A. (2010). Group decision making process for supplier selection with VIKOR under fuzzy environment. Expert Systems with Applications, 37, 24\u201330.","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"880_CR49","first-page":"89","volume":"6","author":"RNC Santos","year":"2012","unstructured":"Santos, R. N. C., Laura, M. M. S. C., & Serra, J. P. B. (2012). FMEA of a tailings dam. Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards, 6(2), 89\u2013104.","journal-title":"Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards"},{"issue":"8","key":"880_CR50","doi-asserted-by":"crossref","first-page":"872","DOI":"10.1016\/j.ress.2005.09.005","volume":"91","author":"SM Seyed-Hosseini","year":"2006","unstructured":"Seyed-Hosseini, S. M., Safaei, N., & Asgharpour, M. J. (2006). Reprioritization of failures in a system failure mode and effects analysis by decision making trial and evaluation laboratory technique. Reliability Engineering & System Safety, 91(8), 872\u2013881.","journal-title":"Reliability Engineering & System Safety"},{"issue":"10","key":"880_CR51","doi-asserted-by":"crossref","first-page":"12160","DOI":"10.1016\/j.eswa.2011.03.027","volume":"38","author":"A Shemshadi","year":"2011","unstructured":"Shemshadi, A., Shirazi, H., Toreihi, M., & Tarokh, M. J. (2011). A fuzzy VIKOR method for supplier selection based on entropy measure for objective weighting. Expert Systems with Applications, 38(10), 12160\u201312167.","journal-title":"Expert Systems with Applications"},{"key":"880_CR52","doi-asserted-by":"crossref","first-page":"29","DOI":"10.17705\/1CAIS.01402","volume":"14","author":"SA Sherer","year":"2004","unstructured":"Sherer, S. A., & Alter, S. (2004). Information system risks and risk factors: Are they mostly about information systems? Communications of the Association for Information Systems, 14, 29\u201364.","journal-title":"Communications of the Association for Information Systems"},{"key":"880_CR53","unstructured":"Shuja, A. K. (2002). Critical literature review & analysis enterprise architecture: What is it and why should we care?"},{"key":"880_CR54","unstructured":"Tse, E. (2009). Risk management on enterprise architecture and system integration. White Paper Collection, www.projectperfect.com.au Page."},{"issue":"1","key":"880_CR55","doi-asserted-by":"crossref","first-page":"29","DOI":"10.2991\/jracr.2011.1.1.3","volume":"1","author":"S U\u011furlu","year":"2011","unstructured":"U\u011furlu, S., & Kahraman, C. (2011). Fuzzy multicriteria risk assessment for hazardous waste management: The case of Istanbul. Journal of Risk Analysis and Crisis Response, 1(1), 29\u201341.","journal-title":"Journal of Risk Analysis and Crisis Response"},{"key":"880_CR56","unstructured":"Urbaczewski, L., & Mrdalj, S. (2006). A comparison of enterprise architecture frameworks. Issues in Information Systems, 7(2), 18\u2013 23."},{"key":"880_CR57","doi-asserted-by":"crossref","unstructured":"Wang, T.-C. (2006). Multi-criteria decision analysis by using fuzzy VIKOR. In International conference on service systems and service management (pp. 901\u2013906). Troyes.","DOI":"10.1109\/ICSSSM.2006.320751"},{"key":"880_CR58","unstructured":"Wang, T.-C., & Chang, T.-H. (2005). Fuzzy VIKOR as an aid for multiple criteria decision making. Taiwan: Institute of Information Management I-Shou University."},{"key":"880_CR59","doi-asserted-by":"crossref","unstructured":"Wang, Y.-M., Chin, K.-S., Poon, G. K. K., & Yang, J.-B. (2009). Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean. Expert Systems with Applications, 36, 1195\u20131207.","DOI":"10.1016\/j.eswa.2007.11.028"},{"key":"880_CR60","doi-asserted-by":"crossref","unstructured":"Yadav, O. P., Singh, N., Goel, P. S., & Itabashi-Campbell, R. (2003). A framework for reliability prediction during product development process incorporating engineering judgments. Quality Engineering, 15(4), 649\u2013662.","DOI":"10.1081\/QEN-120018396"},{"key":"880_CR61","doi-asserted-by":"crossref","unstructured":"Zachman, J. A. (1999). A framework for information systems architecture. IBM Systems Journal, 38(2\u20133), 454\u2013470.","DOI":"10.1147\/sj.382.0454"},{"key":"880_CR62","doi-asserted-by":"crossref","unstructured":"Zadeh, L. A. (1975). The concept of a linguistic variable and its application to approximate reasoning-I. Information Sciences, 8, 199\u2013249.","DOI":"10.1016\/0020-0255(75)90036-5"},{"key":"880_CR63","doi-asserted-by":"crossref","DOI":"10.1007\/978-94-010-0646-0","volume-title":"Fuzzy set theory and its applications","author":"H-J Zimmermann","year":"2001","unstructured":"Zimmermann, H.-J. (2001). Fuzzy set theory and its applications. MA: Kluwer."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0880-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0880-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0880-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,7]],"date-time":"2019-08-07T16:21:47Z","timestamp":1565194907000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0880-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,2,14]]},"references-count":63,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,4]]}},"alternative-id":["880"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0880-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,2,14]]}}}