{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,11,3]],"date-time":"2023-11-03T17:21:49Z","timestamp":1699032109381},"reference-count":34,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2014,4,22]],"date-time":"2014-04-22T00:00:00Z","timestamp":1398124800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,8]]},"DOI":"10.1007\/s10845-014-0912-9","type":"journal-article","created":{"date-parts":[[2014,4,21]],"date-time":"2014-04-21T04:23:14Z","timestamp":1398054194000},"page":"765-779","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["A generalized-exponential decomposition method for the analysis of inhomogeneous assembly\/disassembly systems with unreliable machines and finite buffers"],"prefix":"10.1007","volume":"27","author":[{"given":"Beixin","family":"Xia","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Binghai","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ci","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lifeng","family":"Xi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,4,22]]},"reference":[{"key":"912_CR1","unstructured":"Bonvik, A. M. (1996). Performance analysis of manufacturing systems under hybrid control policies. Thesis (PhD), Massachusetts Institute of Technology."},{"key":"912_CR2","unstructured":"Burman, M. H. (1995). New results in flow line analysis. Thesis (PhD), Massachusetts Institute of Technology."},{"issue":"3","key":"912_CR3","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1080\/00207546708929751","volume":"5","author":"JA Buzacott","year":"1967","unstructured":"Buzacott, J. A. (1967). Automatic transfer lines with buffer stocks. International Journal of Production Research, 5(3), 183\u2013200.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"912_CR4","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1007\/s10845-008-0190-5","volume":"21","author":"Y-S Chen","year":"2010","unstructured":"Chen, Y.-S., Cheng, C.-H., & Lai, C.-J. (2010). A hybrid procedure for extracting rules of production performance in the automobile parts industry. Journal of Intelligent Manufacturing, 21(4), 423\u2013437.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"912_CR5","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1080\/07408178708975381","volume":"19","author":"YF Choong","year":"1987","unstructured":"Choong, Y. F., & Gershwin, S. B. (1987). A decomposition method for the approximate evaluation of capacitated transfer lines with unreliable machines and random processing times. IIE Transactions, 19(2), 150\u2013159.","journal-title":"IIE Transactions"},{"issue":"2","key":"912_CR6","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1023\/A:1008942917166","volume":"11","author":"P Ciprut","year":"2000","unstructured":"Ciprut, P., Hongler, M.-O., & Salama, Y. (2000). Fluctuations of the production output of transfer lines. Journal of Intelligent Manufacturing, 11(2), 183\u2013189.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"912_CR7","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1007\/BF01189237","volume":"15","author":"Y Dallery","year":"1994","unstructured":"Dallery, Y. (1994). On modeling failure and repair times in stochastic models of manufacturing systems using generalized exponential distributions. Queueing Systems, 15(1), 199\u2013209.","journal-title":"Queueing Systems"},{"issue":"1","key":"912_CR8","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/BF01158636","volume":"12","author":"Y Dallery","year":"1992","unstructured":"Dallery, Y., & Gershwin, S. B. (1992). Manufacturing flow line systems: A review of models and analytical results. Queueing Systems, 12(1), 3\u201394.","journal-title":"Queueing Systems"},{"issue":"5","key":"912_CR9","doi-asserted-by":"crossref","first-page":"1093","DOI":"10.1080\/002075499191427","volume":"37","author":"Y Dallery","year":"1999","unstructured":"Dallery, Y., & Le Bihan, H. (1999). An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. International Journal of Production Research, 37(5), 1093\u20131117.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"912_CR10","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1080\/07408178808966181","volume":"20","author":"Y Dallery","year":"1988","unstructured":"Dallery, Y., David, R., & Xie, X. L. (1988). An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20(3), 280\u2013283.","journal-title":"IIE Transactions"},{"issue":"9","key":"912_CR11","doi-asserted-by":"crossref","first-page":"943","DOI":"10.1109\/9.35807","volume":"34","author":"Y Dallery","year":"1989","unstructured":"Dallery, Y., David, R., & Xie, X. L. (1989). Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34(9), 943\u2013953.","journal-title":"IEEE Transactions on Automatic Control"},{"key":"912_CR12","unstructured":"Demir, L., Tunali, S., & Eliiyi, D. T. (2012). The state of the art on buffer allocation problem: A comprehensive survey. Journal of Intelligent Manufacturing, 1\u201322."},{"issue":"3","key":"912_CR13","doi-asserted-by":"publisher","first-page":"411","DOI":"10.1007\/s10845-007-0030-z","volume":"18","author":"A Dolgui","year":"2007","unstructured":"Dolgui, A., Eremeev, A. V., & Sigaev, V. S. (2007). HBBA: Hybrid algorithm for buffer allocation in tandem production lines. Journal of Intelligent Manufacturing, 18(3), 411\u2013420. doi: 10.1007\/s10845-007-0030-z .","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"912_CR14","doi-asserted-by":"crossref","first-page":"1403","DOI":"10.1080\/00207549408957007","volume":"32","author":"I Duenyas","year":"1994","unstructured":"Duenyas, I. (1994). Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32(6), 1403\u20131419.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"912_CR15","doi-asserted-by":"crossref","first-page":"291","DOI":"10.1287\/opre.35.2.291","volume":"35","author":"SB Gershwin","year":"1987","unstructured":"Gershwin, S. B. (1987). An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35(2), 291\u2013305.","journal-title":"Operations Research"},{"issue":"4","key":"912_CR16","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1080\/07408179108963865","volume":"23","author":"SB Gershwin","year":"1991","unstructured":"Gershwin, S. B. (1991). Assembly\/disassembly systems: An efficient decomposition algorithm for tree-structured networks. IIE Transactions, 23(4), 302\u2013314.","journal-title":"IIE Transactions"},{"key":"912_CR17","volume-title":"Manufacturing systems engineering","author":"SB Gershwin","year":"1994","unstructured":"Gershwin, S. B. (1994). Manufacturing systems engineering. Engelwood Cliffs, NJ: Prentice Hall."},{"issue":"1\u20134","key":"912_CR18","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1023\/A:1018940310682","volume":"93","author":"SB Gershwin","year":"2000","unstructured":"Gershwin, S. B., & Burman, M. H. (2000). A decomposition method for analyzing inhomogeneous assembly\/disassembly systems. Annals of Operations Research, 93(1\u20134), 91\u2013115.","journal-title":"Annals of Operations Research"},{"key":"912_CR19","volume-title":"Continuous model of an unreliable two-stage material flow system with a finite interstagebuffer","author":"SB Gershwin","year":"1980","unstructured":"Gershwin, S. B., & Schick, I. C. (1980). Continuous model of an unreliable two-stage material flow system with a finite interstagebuffer. Cambridge, Massachusetts: Massachusetts Institute of Technology."},{"issue":"14","key":"912_CR20","doi-asserted-by":"crossref","first-page":"3085","DOI":"10.1080\/00207540500385980","volume":"45","author":"SB Gershwin","year":"2007","unstructured":"Gershwin, S. B., & Werner, L. M. (2007). An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers. International Journal of Production Research, 45(14), 3085\u20133111.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"912_CR21","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1080\/00207549308956742","volume":"31","author":"CR Glassey","year":"1993","unstructured":"Glassey, C. R., & Hong, Y. (1993). Analysis of behaviour of an unreliable n-stage transfer line with (n $$-$$ - 1) inter-stage storage buffers. International Journal of Production Research, 31(3), 519\u2013530.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"912_CR22","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1016\/S0377-2217(97)00166-5","volume":"109","author":"S Helber","year":"1998","unstructured":"Helber, S. (1998). Decomposition of unreliable assembly\/disassembly networks with limited buffer capacity and random processing times. European Journal of Operational Research, 109(1), 24\u201342.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"912_CR23","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1287\/opre.15.2.286","volume":"15","author":"FS Hillier","year":"1967","unstructured":"Hillier, F. S., & Boling, R. W. (1967). Finite queues in series with exponential or Erlang service times-a numerical approach. Operations Research, 15(2), 286\u2013303.","journal-title":"Operations Research"},{"issue":"5","key":"912_CR24","doi-asserted-by":"crossref","first-page":"435","DOI":"10.1023\/A:1018514401057","volume":"8","author":"M-O Hongler","year":"1997","unstructured":"Hongler, M.-O. (1997). Analytical results for the performance and the control of stochastic flow systems. Journal of Intelligent Manufacturing, 8(5), 435\u2013447.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2\u20134","key":"912_CR25","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1016\/S0166-5316(02)00098-6","volume":"51","author":"R Levantesi","year":"2003","unstructured":"Levantesi, R., Matta, A., & Tolio, T. (2003). Performance evaluation of continuous production lines with machines having different processing times and multiple failure modes. Performance Evaluation, 51(2\u20134), 247\u2013268.","journal-title":"Performance Evaluation"},{"issue":"1","key":"912_CR26","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1023\/A:1018996428429","volume":"93","author":"H Bihan Le","year":"2000","unstructured":"Le Bihan, H., & Dallery, Y. (2000). A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93(1), 265\u2013297.","journal-title":"Annals of Operations Research"},{"issue":"14","key":"912_CR27","doi-asserted-by":"crossref","first-page":"3823","DOI":"10.1080\/00207540701829752","volume":"47","author":"J Li","year":"2009","unstructured":"Li, J., Blumenfeld, D. E., Huang, N., & Alden, J. M. (2009). Throughput analysis of production systems: Recent advances and future topics. International Journal of Production Research, 47(14), 3823\u2013 3851.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"912_CR28","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1080\/07408179108963866","volume":"23","author":"MD Mascolo","year":"1991","unstructured":"Mascolo, M. D., David, R., & Dallery, Y. (1991). Modeling and analysis of assembly systems with unreliable machines and finite buffers. IIE Transactions, 23(4), 315\u2013330.","journal-title":"IIE Transactions"},{"issue":"5","key":"912_CR29","doi-asserted-by":"crossref","first-page":"1603","DOI":"10.1007\/s10845-010-0463-7","volume":"23","author":"Y Massim","year":"2012","unstructured":"Massim, Y., Yalaoui, F., Chatelet, E., Yalaoui, A., & Zeblah, A. (2012). Efficient immune algorithm for optimal allocations in series-parallel continuous manufacturing systems. Journal of Intelligent Manufacturing, 23(5), 1603\u20131619.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"912_CR30","doi-asserted-by":"crossref","first-page":"587","DOI":"10.1007\/s10845-010-0397-0","volume":"23","author":"A Matta","year":"2012","unstructured":"Matta, A., Pezzoni, M., & Semeraro, Q. (2012). A Kriging-based algorithm to optimize production systems approximated by analytical models. Journal of Intelligent Manufacturing, 23(3), 587\u2013 597.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"912_CR31","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0377-2217(95)00378-9","volume":"92","author":"HT Papadopoulos","year":"1996","unstructured":"Papadopoulos, H. T., & Heavey, C. (1996). Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92(1), 1\u201327.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"912_CR32","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1137\/1107040","volume":"7","author":"BA Sevast\u2019yanov","year":"1962","unstructured":"Sevast\u2019yanov, B. A. (1962). Influence of storage bin capacity on the average standstill time of a production line. Theory of Probability and its Applications, 7(4), 429.","journal-title":"Theory of Probability and its Applications"},{"key":"912_CR33","doi-asserted-by":"crossref","unstructured":"Xia, B., Xi, L., & Zhou, B. (2012). An improved decomposition method for evaluating the performance of transfer lines with unreliable machines and finite buffers. International Journal of Production Research, 50(15), 4009\u20134024.","DOI":"10.1080\/00207543.2011.587842"},{"issue":"1","key":"912_CR34","first-page":"85","volume":"4","author":"B Zimmern","year":"1956","unstructured":"Zimmern, B. (1956). \u00c8tudes de la propagation des arr\u00easts al\u00e9atoires dans les chaines de production. Revue de Statistique Appliqu\u00e9e, 4(1), 85\u2013104.","journal-title":"Revue de Statistique Appliqu\u00e9e"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0912-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0912-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0912-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:01Z","timestamp":1559268721000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0912-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,4,22]]},"references-count":34,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2016,8]]}},"alternative-id":["912"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0912-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,4,22]]}}}