{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,6]],"date-time":"2026-01-06T05:07:49Z","timestamp":1767676069066},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2014,8,13]],"date-time":"2014-08-13T00:00:00Z","timestamp":1407888000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,12]]},"DOI":"10.1007\/s10845-014-0951-2","type":"journal-article","created":{"date-parts":[[2014,8,11]],"date-time":"2014-08-11T22:37:22Z","timestamp":1407796642000},"page":"1287-1297","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["A method for aligning serial batching decisions in a two-level organization of factory and distributed workstations"],"prefix":"10.1007","volume":"27","author":[{"given":"Yon-Chun","family":"Chou","sequence":"first","affiliation":[]},{"given":"Yue-Lan","family":"Lin","sequence":"additional","affiliation":[]},{"given":"King-Fai","family":"Chun","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,8,13]]},"reference":[{"issue":"6","key":"951_CR1","doi-asserted-by":"crossref","first-page":"608","DOI":"10.1016\/j.rcim.2007.02.006","volume":"23","author":"E Alvarez","year":"2007","unstructured":"Alvarez, E. (2007). Multi-plant production scheduling in SMEs. Robotics and Computer-Integrated Manufacturing, 23(6), 608\u2013613.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"951_CR2","doi-asserted-by":"publisher","unstructured":"Archimede, B., Letouzey, A., Memon, M. A., & Xu, J. (2013). Towards a distributed multi-agent framework for shared resources scheduling. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0748-8 .","DOI":"10.1007\/s10845-013-0748-8"},{"key":"951_CR3","doi-asserted-by":"publisher","unstructured":"Borangiu, T., Raileanu, S., Trentesaux, D., Berger, T., & Iacob, I. (2013). Distributed manufacturing control with extended CNP interaction of intelligent products. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0740-3 .","DOI":"10.1007\/s10845-013-0740-3"},{"issue":"11","key":"951_CR4","doi-asserted-by":"crossref","first-page":"3207","DOI":"10.1080\/00207540902791793","volume":"48","author":"JC Chen","year":"2010","unstructured":"Chen, J. C., & Chen, C. W. (2010). Capacity planning of serial and batch machines with capability constraints for wafer fabrication plants. International Journal of Production Research, 48(11), 3207\u20133223.","journal-title":"International Journal of Production Research"},{"key":"951_CR5","doi-asserted-by":"crossref","unstructured":"Fowler, J. W., Phojanamongkolkij, N., Cochran, J. K., & Montgomery, D. C. (2002). Optimal batching in a wafer fabrication facility using a multiproduct G\/G\/c model with batch processing. International Journal of Production Research, 40, 275\u2013292.","DOI":"10.1080\/00207540110081489"},{"key":"951_CR6","doi-asserted-by":"crossref","unstructured":"Govind, N., Bullock, E. W., He, L., Iyer, B., Krishna, M., & Lockwood, C.S. (2007). Integrated targeting, near real-time scheduling, and dispatching with automated execution in semiconductor manufacturing. In Proceedings of advanced semiconductor manufacturing conference, Stresa, Italy, June 11\u201312, pp. 87\u201392.","DOI":"10.1109\/ASMC.2007.4595689"},{"key":"951_CR7","volume-title":"Factory physics: Foundations of manufacturing management","author":"W Hopp","year":"2008","unstructured":"Hopp, W., & Spearman, M. (2008). Factory physics: Foundations of manufacturing management (3rd ed.). New York: McGraw-Hill.","edition":"3"},{"key":"951_CR8","doi-asserted-by":"crossref","first-page":"566","DOI":"10.1109\/TRA.2003.814512","volume":"19","author":"T-K Hwang","year":"2003","unstructured":"Hwang, T.-K., & Chang, S.-C. (2003). Design of a Lagrangian relaxation-based hierarchical production scheduling environment for semiconductor wafer fabrication. IEEE Transactions on Robotics and Automation, 19, 566\u2013578.","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"951_CR9","doi-asserted-by":"crossref","unstructured":"Inoue, T., Ishii, Y., Igarashi, K., Muneta, T., & Imaoka, K. (2005). Study of cycle time caused by lot arrival distribution in a semiconductor manufacturing line. In Proceedings of IEEE international symposium on semiconductor manufacturing, San Jose, CA, USA, September 13\u201315, pp. 115\u2013118.","DOI":"10.1109\/ISSM.2005.1513311"},{"issue":"7","key":"951_CR10","doi-asserted-by":"crossref","first-page":"979","DOI":"10.1016\/j.engappai.2008.09.005","volume":"22","author":"P Leit\u00e3o","year":"2009","unstructured":"Leit\u00e3o, P. (2009). Agent-based distributed manufacturing control: A state-of-the-art survey. Engineering Applications of Artificial Intelligence, 22(7), 979\u2013991.","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"2","key":"951_CR11","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1016\/j.ijpe.2006.08.011","volume":"107","author":"N Li","year":"2007","unstructured":"Li, N., Zhang, M. T., Deng, S., Lee, Z.-H., Zhang, L., & Zheng, L. (2007). Single-station performance evaluation and improvement in semiconductor manufacturing: A graphical approach. International Journal of Production Economics, 107(2), 397\u2013403.","journal-title":"International Journal of Production Economics"},{"key":"951_CR12","volume-title":"High-mix low-volume manufacturing","author":"RM Mahoney","year":"1997","unstructured":"Mahoney, R. M. (1997). High-mix low-volume manufacturing. New Jersey: Prentice Hall PTR."},{"key":"951_CR13","doi-asserted-by":"crossref","first-page":"990","DOI":"10.1007\/s00170-005-2585-1","volume":"29","author":"M Mathirajan","year":"2006","unstructured":"Mathirajan, M., & Sivakumar, A. I. (2006). A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. International Journal of Advanced Manufacturing Technology, 29, 990\u20131001.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"951_CR14","doi-asserted-by":"crossref","first-page":"644","DOI":"10.1016\/j.ejor.2004.07.013","volume":"167","author":"G Miragliotta","year":"2005","unstructured":"Miragliotta, G., & Perona, M. (2005). Decentralised, multi-objective, driven scheduling for reentrant shops: A conceptual development and a test case. European Journal Operational Research, 167, 644\u2013662.","journal-title":"European Journal Operational Research"},{"issue":"1","key":"951_CR15","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1007\/s10845-009-0288-4","volume":"23","author":"F Ounnar","year":"2012","unstructured":"Ounnar, F., & Pujo, P. (2012). Pull control for job shop: Holonic manufacturing system approach using multicriteria decision-making. Journal of Intelligent Manufacturing, 23(1), 141\u2013153.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"951_CR16","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1111\/j.1937-5956.2003.tb00199.x","volume":"12","author":"K Ramdas","year":"2003","unstructured":"Ramdas, K. (2003). Managing product variety: An integrative review and research directions. Production and Operations Management, 12, 79\u2013101.","journal-title":"Production and Operations Management"},{"issue":"4","key":"951_CR17","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1109\/TASE.2007.906348","volume":"4","author":"JG Shantikumar","year":"2007","unstructured":"Shantikumar, J. G., Ding, S., & Zhang, M. T. (2007). Queueing theory for semiconductor manufacturing systems: A survey and open problems. IEEE Transactions on Automation Science and Engineering, 4(4), 513\u2013522.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"2","key":"951_CR18","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ijpe.2004.04.014","volume":"105","author":"JJ Yuan","year":"2007","unstructured":"Yuan, J. J., Lin, Y. X., Cheng, T. C. E., & Ng, C. T. (2007). Single machine serial-batching scheduling problem with a common batch size to minimize total weighted completion time. International Journal of Production Economics, 105(2), 402\u2013406.","journal-title":"International Journal of Production Economics"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0951-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0951-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0951-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0951-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:03Z","timestamp":1559268723000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0951-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,8,13]]},"references-count":18,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2016,12]]}},"alternative-id":["951"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0951-2","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,8,13]]}}}