{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T19:34:09Z","timestamp":1771011249288,"version":"3.50.1"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2014,8,31]],"date-time":"2014-08-31T00:00:00Z","timestamp":1409443200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2016,12]]},"DOI":"10.1007\/s10845-014-0954-z","type":"journal-article","created":{"date-parts":[[2014,8,30]],"date-time":"2014-08-30T12:29:09Z","timestamp":1409401749000},"page":"1323-1333","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":19,"title":["An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy"],"prefix":"10.1007","volume":"27","author":[{"given":"Da","family":"Wen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pan","family":"Ershun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wang","family":"Ying","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liao","family":"Wenzhu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,8,31]]},"reference":[{"issue":"2","key":"954_CR1","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1108\/13552510810877665","volume":"14","author":"C Anis","year":"2008","unstructured":"Anis, C., Nidhal, R., & Mehdi, R. (2008). Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system. Journal of Quality in Maintenance Engineering, 14(2), 161\u2013176.","journal-title":"Journal of Quality in Maintenance Engineering"},{"issue":"3","key":"954_CR2","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(01)00168-2","volume":"76","author":"M Ben-Daya","year":"2002","unstructured":"Ben-Daya, M. (2002). The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics, 76(3), 257\u2013264.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"954_CR3","doi-asserted-by":"crossref","first-page":"68","DOI":"10.1108\/13552510610654547","volume":"12","author":"M Ben-Daya","year":"2006","unstructured":"Ben-Daya, M., & Noman, S. A. (2006). Lot sizing, preventive maintenance, and warranty decisions for imperfect production systems. Journal of Quality in Maintenance Engineering, 12(1), 68\u201380.","journal-title":"Journal of Quality in Maintenance Engineering"},{"key":"954_CR4","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.ijpe.2006.09.008","volume":"107","author":"M Ben-Daya","year":"2007","unstructured":"Ben-Daya, M., & Darwish, M. A. (2007). Effect of inspection errors and preventive maintenance on a two-stage production inventory system. International Journal of Production Economics, 107, 301\u2013313.","journal-title":"International Journal of Production Economics"},{"issue":"6","key":"954_CR5","doi-asserted-by":"crossref","first-page":"1537","DOI":"10.1016\/j.scient.2011.09.008","volume":"18","author":"SW Chiu","year":"2011","unstructured":"Chiu, S. W., Lin, H.-D., Wu, M.-F., & Yang, J-Ch. (2011). Determining replenishment lot size and shipment policy for an extended EPW model with delivery and quality assurance issues. Scientia Iranica E, 18(6), 1537\u20131544.","journal-title":"Scientia Iranica E"},{"issue":"1\u20133","key":"954_CR6","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1016\/S0925-5273(01)00121-9","volume":"74","author":"T Dohi","year":"2001","unstructured":"Dohi, T., Okamura, H., & Osaki, S. (2001). Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment. International Journal of Production Economics, 74(1\u20133), 147\u2013155.","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"954_CR7","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1016\/j.ejor.2007.01.035","volume":"186","author":"S El-Ferik","year":"2008","unstructured":"El-Ferik, S. (2008). Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy. European Journal of Operational Research, 186(1), 150\u2013163.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"954_CR8","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1109\/TASE.2007.910302","volume":"5","author":"NZ Gebraeel","year":"2008","unstructured":"Gebraeel, N. Z., & Lawley, M. A. (2008). A neural network degradation model for computing and updating residual life distributions. IEEE Transactions on Automation Science and Engineering, 5(1), 154\u2013163.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"4","key":"954_CR9","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1002\/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO;2-7","volume":"45","author":"M Hariga","year":"1998","unstructured":"Hariga, M., & Ben-Daya, M. (1998). Note: The economic manufacturing lot-sizing problem with imperfect production process: Bounds and optimal solutions. Naval Research Logistics, 45(4), 423\u2013433.","journal-title":"Naval Research Logistics"},{"issue":"1","key":"954_CR10","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/j.ymssp.2005.11.008","volume":"21","author":"R Huang","year":"2007","unstructured":"Huang, R., Xi, L., Liu, C., Qiu, H., & Lee, J. (2007). Residual life predictions for ball bearings based on self-organizing map and back propagation neural network methods. Mechanical Systems and Signal Processing, 21(1), 193\u2013207.","journal-title":"Mechanical Systems and Signal Processing"},{"key":"954_CR11","doi-asserted-by":"crossref","unstructured":"Kiamars, F. H., Changiz, V., & Alireza, K. (2012). Retracted: Using genetic algorithm approach to solve a multi-product EPQ model with defective items, rework, and constrained space. Journal of Industrial Engineering, 8(1), 27.","DOI":"10.1186\/2251-712X-8-27"},{"issue":"6","key":"954_CR12","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1016\/j.compind.2006.02.014","volume":"57","author":"J Lee","year":"2006","unstructured":"Lee, J., Jun, N., Dragan, D., Qiu, H., & Liao, H. (2006). Intelligent prognostics tools and e-maintenance. Computers in Industry, 57(6), 476\u2013489.","journal-title":"Computers in Industry"},{"issue":"4","key":"954_CR13","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1080\/07408178908966243","volume":"21","author":"HL Lee","year":"1989","unstructured":"Lee, H. L., & Rosenblatt, M. J. (1989). A production and maintenance planning model with restoration cost dependent on detection delay. IIE Transactions, 21(4), 368\u2013375.","journal-title":"IIE Transactions"},{"key":"954_CR14","doi-asserted-by":"crossref","unstructured":"Lee, H. -S., & Srinivasan, M. M. (2001). A production\/inventory policy for an unreliable machine. In M. A. Rahim & M. Ben-Daya (Eds.), Integrated models in production planning, inventory, quality, and maintenance (pp. 79\u201394). Norwell, MA: Kluwer Academic Publishers.","DOI":"10.1007\/978-1-4615-1635-4_4"},{"key":"954_CR15","doi-asserted-by":"crossref","first-page":"875","DOI":"10.1007\/s10845-009-0264-z","volume":"21","author":"WZ Liao","year":"2010","unstructured":"Liao, W. Z., Pan, E. S., & Xi, L. F. (2010). Preventive maintenance scheduling for repairable system with deterioration. Journal of Intelligent Manufacturing, 21, 875\u2013884.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"954_CR16","doi-asserted-by":"crossref","first-page":"558","DOI":"10.1016\/j.compind.2006.12.004","volume":"58","author":"J Liu","year":"2007","unstructured":"Liu, J., Dragan, D., Ni, J., Casoetto, N., & Lee, J. (2007). Similarity based method for manufacturing process performance prediction and diagnosis. Computers in Industry, 58(6), 558\u2013566.","journal-title":"Computers in Industry"},{"issue":"4","key":"954_CR17","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1109\/24.983393","volume":"50","author":"H Lu","year":"2001","unstructured":"Lu, H., Kolarik, W. J., & Lu, S. S. (2001). Real-time performance reliability prediction. IEEE Transactions on Reliability, 50(4), 353\u2013357.","journal-title":"IEEE Transactions on Reliability"},{"key":"954_CR18","doi-asserted-by":"crossref","unstructured":"Lu, S., Tu, Y., & Lu, H. (2007). Predictive condition-based maintenance for continuously deteriorating systems. Quality and Reliability Engineering International, 23(1), 71\u201381.","DOI":"10.1002\/qre.823"},{"issue":"2","key":"954_CR19","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1007\/s10845-008-0198-x","volume":"21","author":"R Mehdi","year":"2010","unstructured":"Mehdi, R., Nidhal, R., & Anis, C. (2010). Joint quality control and preventive maintenance strategy for imperfect production processes. Journal of Intelligent Manufacturing, 21(2), 205\u2013212.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"954_CR20","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(96)00099-9","volume":"94","author":"H Pham","year":"1996","unstructured":"Pham, H., & Wang, H. (1996). Imperfect maintenance. European Journal of Operational Research, 94(3), 425\u2013438.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"954_CR21","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34(1), 137\u2013144.","journal-title":"Operations Research"},{"issue":"1","key":"954_CR22","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt, M. J., & Lee, H. L. (1986). Economic Production Cycles With Imperfect Production Process. IIE Transactions, 18(1), 48\u201355.","journal-title":"IIE Transactions"},{"key":"954_CR23","volume-title":"Applied probability models with optimization applications","author":"SM Ross","year":"1970","unstructured":"Ross, S. M. (1970). Applied probability models with optimization applications. Mineola: Courier Dover Publications."},{"issue":"3","key":"954_CR24","doi-asserted-by":"crossref","first-page":"481","DOI":"10.1007\/s10845-010-0387-2","volume":"23","author":"N Ruschin-Rimini","year":"2009","unstructured":"Ruschin-Rimini, N., Maimon, O., & Romano, R. (2009). Visual analysis of quality-related manufacturing data using fractal geometry. Journal of Intelligent Manufacturing, 23(3), 481\u2013495.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"954_CR25","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1080\/00207720310001657090","volume":"35","author":"SH Sheu","year":"2004","unstructured":"Sheu, S. H., & Chen, J. (2004). Optimal lot-sizing problem with imperfect maintenance and imperfect production. International Journal of Systems Science, 35(1), 69\u201377.","journal-title":"International Journal of Systems Science"},{"key":"954_CR26","volume-title":"Time series analysis and its applications with R examples","author":"RH Shumway","year":"2006","unstructured":"Shumway, R. H., & Stoffer, D. S. (2006). Time series analysis and its applications with R examples (2nd ed.). New York: Springer Texts in Statistics.","edition":"2"},{"issue":"3","key":"954_CR27","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1007\/BF03167589","volume":"21","author":"WC Singa","year":"2004","unstructured":"Singa, W. C., Dah-Chuan, G., & Hui-Ming, W. (2004). Effects of random defective rate and imperfect rework process on economic production quantity model. Japan Journal of Industrial and Applied Mathematics, 21(3), 375\u2013389.","journal-title":"Japan Journal of Industrial and Applied Mathematics"},{"key":"954_CR28","first-page":"1410","volume":"101","author":"EW Taft","year":"1918","unstructured":"Taft, E. W. (1918). The most economical production lot. Iron Age, 101, 1410\u20131412.","journal-title":"Iron Age"},{"issue":"12","key":"954_CR29","doi-asserted-by":"crossref","first-page":"2021","DOI":"10.1016\/S0305-0548(03)00161-8","volume":"31","author":"CH Wang","year":"2004","unstructured":"Wang, C. H. (2004). The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Computers & Operations Research, 31(12), 2021\u20132035.","journal-title":"Computers & Operations Research"},{"issue":"1","key":"954_CR30","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/S0377-2217(02)00429-0","volume":"149","author":"CH Wang","year":"2003","unstructured":"Wang, C. H., & Sheu, S. H. (2003). Optimal lot sizing for products sold under free-repair warranty. European Journal of Operational Research, 149(1), 131\u2013141.","journal-title":"European Journal of Operational Research"},{"key":"954_CR31","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.jmsy.2012.07.010","volume":"32","author":"Chen Yan-Chun","year":"2013","unstructured":"Yan-Chun, Chen. (2013). An optimal production and inspection strategy with preventive maintenance error and rework. Journal of Manufacturing Systems, 32, 99\u2013106.","journal-title":"Journal of Manufacturing Systems"},{"key":"954_CR32","volume-title":"Time series analysis in engineering","author":"S Yang","year":"1991","unstructured":"Yang, S. (1991). Time series analysis in engineering. Wuhan: Huazhong University of Technology Press."},{"issue":"3","key":"954_CR33","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1109\/TR.2003.816402","volume":"52","author":"SK Yang","year":"2003","unstructured":"Yang, S. K. (2003). A condition-based failure-prediction and processing-scheme for preventive maintenance. IEEE Transactions on Reliability, 52(3), 373\u2013383.","journal-title":"IEEE Transactions on Reliability"},{"issue":"1","key":"954_CR34","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-007-0047-3","volume":"19","author":"Z Yang","year":"2008","unstructured":"Yang, Z., Djurdjanovic, D., & Ni, J. (2008). Maintenance scheduling in manufacturing systems based on predicted machine degradation. Journal of Intelligent Manufacturing, 19(1), 87\u201398.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"954_CR35","doi-asserted-by":"crossref","first-page":"766","DOI":"10.1016\/j.ejor.2005.02.049","volume":"174","author":"RH Yeh","year":"2006","unstructured":"Yeh, R. H., & Chen, T. H. (2006). Optimal lot size and inspection policy for products sold with warranty. European Journal of Operational Research, 174(2), 766\u2013776.","journal-title":"European Journal of Operational Research"},{"key":"954_CR36","doi-asserted-by":"crossref","first-page":"1245","DOI":"10.1007\/s10845-010-0423-2","volume":"23","author":"Y Yesser","year":"2012","unstructured":"Yesser, Y., Anis, C., & Nidhal, R. (2012). Quasi-optimal integrated production, inventory and maintenance policies for a single-vendor single-buyer system with imperfect production process. Journal of Intelligent Manufacturing, 23, 1245\u20131256.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"954_CR37","doi-asserted-by":"publisher","unstructured":"Xia, T. B., Jin, X. N., Xi, L. F., Zhang, Y. J., & Ni, J. (2013) Operating load based real-time rolling grey forecasting for machine health prognosis in dynamic maintenance schedule. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0780-8 .","DOI":"10.1007\/s10845-013-0780-8"},{"issue":"3","key":"954_CR38","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1109\/TR.2009.2026785","volume":"58","author":"Z Xu","year":"2009","unstructured":"Xu, Z., Ji, Y., & Zhou, D. (2009). A new real-time reliability prediction method for dynamic systems based on on-line fault prediction. IEEE Transactions on Reliability, 58(3), 523\u2013538.","journal-title":"IEEE Transactions on Reliability"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0954-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0954-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0954-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0954-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:03Z","timestamp":1559268723000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0954-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,8,31]]},"references-count":38,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2016,12]]}},"alternative-id":["954"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0954-z","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,8,31]]}}}