{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,20]],"date-time":"2026-05-20T15:44:40Z","timestamp":1779291880353,"version":"3.51.4"},"reference-count":44,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2014,9,5]],"date-time":"2014-09-05T00:00:00Z","timestamp":1409875200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2017,1]]},"DOI":"10.1007\/s10845-014-0959-7","type":"journal-article","created":{"date-parts":[[2014,9,5]],"date-time":"2014-09-05T03:14:36Z","timestamp":1409886876000},"page":"23-36","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":120,"title":["A modified particle swarm optimization algorithm to mixed-model two-sided assembly line balancing"],"prefix":"10.1007","volume":"28","author":[{"given":"Y\u0131lmaz","family":"Delice","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Emel","family":"K\u0131z\u0131lkaya Aydo\u011fan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"U\u011fur","family":"\u00d6zcan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mehmet S\u0131tk\u0131","family":"\u0130lkay","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,9,5]]},"reference":[{"key":"959_CR1","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/j.ijpe.2004.03.008","volume":"96","author":"K A\u011fpak","year":"2005","unstructured":"A\u011fpak, K., & G\u00f6k\u00e7en, H. (2005). Assembly line balancing: Two resource constrained cases. International Journal Production Economics, 96, 129\u2013140.","journal-title":"International Journal Production Economics"},{"key":"959_CR2","doi-asserted-by":"publisher","unstructured":"AitZai, A., Benmedjdoub, B., & Boudhar, M. (2014). Branch-and-bound and PSO algorithms for no-wait job shop scheduling. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-014-0906-7 .","DOI":"10.1007\/s10845-014-0906-7"},{"key":"959_CR3","doi-asserted-by":"crossref","first-page":"755","DOI":"10.1080\/00207548308942409","volume":"21","author":"F Akagi","year":"1983","unstructured":"Akagi, F., Osaki, H., & Kikuchi, S. (1983). A method for assembly line balancing with more than one worker in each station. International Journal of Production Research, 21, 755\u2013770.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"959_CR4","doi-asserted-by":"crossref","first-page":"1212","DOI":"10.1016\/j.ejor.2006.07.044","volume":"187","author":"C Andr\u00e9s","year":"2008","unstructured":"Andr\u00e9s, C., Miralles, C., & Pastor, R. (2008). Balancing and scheduling tasks in assembly lines with sequence-dependent setup times. European Journal of Operational Research, 187(3), 1212\u20131223.","journal-title":"European Journal of Operational Research"},{"key":"959_CR5","doi-asserted-by":"crossref","first-page":"2447","DOI":"10.1080\/00207549308956868","volume":"31","author":"JJ Bartholdi","year":"1993","unstructured":"Bartholdi, J. J. (1993). Balancing two-sided assembly lines: A case study. International Journal of Production Research, 31, 2447\u20132461.","journal-title":"International Journal of Production Research"},{"key":"959_CR6","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1016\/j.ijpe.2012.10.020","volume":"142","author":"O Battaia","year":"2013","unstructured":"Battaia, O., & Dolgui, A. (2013). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142, 259\u2013277.","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"959_CR7","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1016\/j.ejor.2004.07.023","volume":"168","author":"C Becker","year":"2006","unstructured":"Becker, C., & Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694\u2013715.","journal-title":"European Journal of Operational Research"},{"key":"959_CR8","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1016\/j.ejor.2008.11.051","volume":"199","author":"C Becker","year":"2009","unstructured":"Becker, C., & Scholl, A. (2009). Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure. European Journal of Operational Research, 199, 359\u2013374.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"959_CR9","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1007\/s10845-012-0627-8","volume":"24","author":"F Belmecheri","year":"2013","unstructured":"Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775\u2013789.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"959_CR10","doi-asserted-by":"crossref","first-page":"674","DOI":"10.1016\/j.ejor.2006.10.010","volume":"183","author":"N Boysen","year":"2007","unstructured":"Boysen, N., Fliedner, M., & Scholl, A. (2007). A classification of assembly line balancing problems. European Journal of Operational Research, 183, 674\u2013693.","journal-title":"European Journal of Operational Research"},{"key":"959_CR11","doi-asserted-by":"crossref","first-page":"1010","DOI":"10.1287\/mnsc.20.6.1010","volume":"20","author":"GM Buxey","year":"1974","unstructured":"Buxey, G. M. (1974). Assembly line balancing with multiple statitons. Management Science, 20, 1010\u20131021.","journal-title":"Management Science"},{"key":"959_CR12","doi-asserted-by":"crossref","first-page":"186","DOI":"10.1080\/07408178808966168","volume":"20","author":"AK Chakravarty","year":"1988","unstructured":"Chakravarty, A. K. (1988). Line balancing with task learning effects. IIE Transactions, 20, 186\u2013193.","journal-title":"IIE Transactions"},{"issue":"1","key":"959_CR13","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1007\/s10845-011-0552-2","volume":"24","author":"GV Chakaravarthy","year":"2013","unstructured":"Chakaravarthy, G. V., Marimuthu, S., & Sait, A. N. (2013). Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Intelligent Manufacturing, 24(1), 175\u2013191.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"959_CR14","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.cie.2011.08.015","volume":"62","author":"P Chutima","year":"2012","unstructured":"Chutima, P., & Chimklai, P. (2012). Multi-objective two-sided mixed-model assembly line balancing using particle swarm optimisation with negative knowledge. Computers and Industrial Engineering, 62, 39\u201355.","journal-title":"Computers and Industrial Engineering"},{"key":"959_CR15","doi-asserted-by":"crossref","unstructured":"Chutima, P., & Naruemitwong, W. (2014). A Pareto biogeography-based optimisation for multi-objective two-sided assembly line sequencing problems with a learning effect. Computers and Industrial Engineering, 69, 89\u2013104.","DOI":"10.1016\/j.cie.2014.01.001"},{"key":"959_CR16","doi-asserted-by":"crossref","unstructured":"Eberhart, R. C., & Shi, Y. (2001). Particle swarm optimization: developments, applications and resources. In Proceedings of the 2001 Congress on Evolutionary Computation, 2001 (Vol. 1, pp. 81\u201386). IEEE.","DOI":"10.1109\/CEC.2001.934374"},{"key":"959_CR17","doi-asserted-by":"crossref","first-page":"600","DOI":"10.1016\/j.ijpe.2005.12.001","volume":"103","author":"H G\u00f6k\u00e7en","year":"2006","unstructured":"G\u00f6k\u00e7en, H., A\u011fpak, K., & Benzer, R. (2006). Balancing of parallel assembly lines. International Journal of Production Economics, 103, 600\u2013609.","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"959_CR18","doi-asserted-by":"crossref","first-page":"308","DOI":"10.1287\/mnsc.11.2.308","volume":"11","author":"AL Gutjahr","year":"1964","unstructured":"Gutjahr, A. L., & Nemhauser, G. L. (1964). An algorithm for the line balancing problem. Management Science, 11(2), 308\u2013315.","journal-title":"Management Science"},{"key":"959_CR19","doi-asserted-by":"crossref","unstructured":"Kennedy, J., & Eberhart, R. C. (1995). Particle swarm optimization. In Proceedings of the IEEE international joint conference on neural networks (pp. 1942\u20131948). IEEE Press.","DOI":"10.1109\/ICNN.1995.488968"},{"key":"959_CR20","unstructured":"Kennedy, J., & Eberhart, R. C. (1997). A discrete binary version of the particle swarm optimization. In Proceedings of the conference on systems, man, and cybernetics SMC97 (pp. 4104\u20134108)."},{"key":"959_CR21","volume-title":"Swarm intelligence","author":"J Kennedy","year":"2001","unstructured":"Kennedy, J., Eberhart, R. C., & Shi, Y. (2001). Swarm intelligence. San Francisco, CA: Morgan Kaufmann."},{"issue":"1","key":"959_CR22","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/095372800232478","volume":"11","author":"YK Kim","year":"2000","unstructured":"Kim, Y. K., Kim, Y., & Kim, Y. J. (2000). Two-sided assembly line balancing: A genetic algorithm approach. Production Planning and Control, 11(1), 44\u201353.","journal-title":"Production Planning and Control"},{"key":"959_CR23","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1016\/S0360-8352(01)00029-8","volume":"40","author":"TO Lee","year":"2001","unstructured":"Lee, T. O., Kim, Y., & Kim, Y. K. (2001). Two-sided assembly line balancing to maximize work relatedness and slackness. Computers and Industrial Engineering, 40, 273\u2013292.","journal-title":"Computers and Industrial Engineering"},{"issue":"5","key":"959_CR24","doi-asserted-by":"crossref","first-page":"1261","DOI":"10.1016\/j.chaos.2004.11.095","volume":"25","author":"B Liu","year":"2005","unstructured":"Liu, B., Wang, L., Jin, Y. H., Tang, F., & Huang, D. X. (2005). Improved particle swarm optimization combined with chaos. Chaos, Solitons & Fractals, 25(5), 1261\u20131271.","journal-title":"Chaos, Solitons & Fractals"},{"key":"959_CR25","doi-asserted-by":"publisher","unstructured":"Ma, W., Wang, M., & Zhu, X. (2013). Hybrid particle swarm optimization and differential evolution algorithm for bi-level programming problem and its application to pricing and lot-sizing decisions. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0803-5 .","DOI":"10.1007\/s10845-013-0803-5"},{"key":"959_CR26","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1287\/mnsc.19.4.423","volume":"19","author":"JLC Macaskill","year":"1972","unstructured":"Macaskill, J. L. C. (1972). Production-line balances for mixed model lines. Management Science, 19, 423\u2013434.","journal-title":"Management Science"},{"key":"959_CR27","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(97)00169-0","volume":"109","author":"J Miltenburg","year":"1998","unstructured":"Miltenburg, J. (1998). Balancing U-lines in a multiple U-line facility. European Journal of Operational Research, 109, 1\u201323.","journal-title":"European Journal of Operational Research"},{"key":"959_CR28","doi-asserted-by":"crossref","first-page":"1378","DOI":"10.1287\/mnsc.40.10.1378","volume":"40","author":"J Miltenburg","year":"1994","unstructured":"Miltenburg, J., & Wijngaard, J. (1994). The U-line line balancing problem. Management Science, 40, 1378\u20131388.","journal-title":"Management Science"},{"issue":"4","key":"959_CR29","doi-asserted-by":"crossref","first-page":"1643","DOI":"10.1016\/j.asoc.2008.01.002","volume":"8","author":"AW Mohemmed","year":"2008","unstructured":"Mohemmed, A. W., Sahoo, N. C., & Geok, T. K. (2008). Solving shortest path problem using particle swarm optimization. Applied Soft Computing, 8(4), 1643\u20131653.","journal-title":"Applied Soft Computing"},{"key":"959_CR30","unstructured":"Moodie, C. L., & Young, H. H. (1965). A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering, 16, 23\u201329."},{"issue":"1","key":"959_CR31","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.cie.2008.11.012","volume":"57","author":"U \u00d6zcan","year":"2009","unstructured":"\u00d6zcan, U., & Toklu, B. (2009). Balancing of mixed-model two-sided assembly lines. Computers and Industrial Engineering, 57(1), 217\u2013227.","journal-title":"Computers and Industrial Engineering"},{"key":"959_CR32","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1080\/00207547508942985","volume":"13","author":"PA Pinto","year":"1975","unstructured":"Pinto, P. A., Dannenbring, D. G., & Khumawala, B. M. (1975). A branch and bound algorithm for assembly line balancing with paralleling. International Journal of Production Research, 13, 183\u2013196.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"959_CR33","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1007\/s10845-012-0701-2","volume":"25","author":"X Qiu","year":"2014","unstructured":"Qiu, X., & Lau, H. Y. K. (2014). An AIS-based hybrid algorithm for static job shop scheduling problem. Journal of Intelligent Manufacturing, 25(3), 489\u2013503.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"959_CR34","doi-asserted-by":"crossref","unstructured":"Ratnaweera, A., Halgamuge, S., & Watson, H. C. (2004). Self-organizing hierarchical particle swarm optimizer with time-varying acceleration coefficients. IEEE Transactions on Evolutionary Computation, 8(3), 240\u2013255.","DOI":"10.1109\/TEVC.2004.826071"},{"key":"959_CR35","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1016\/S0141-9331(02)00053-4","volume":"26","author":"A Salman","year":"2003","unstructured":"Salman, A., Ahmad, I., & Al-Madani, S. (2003). Particle swarm optimization for task assignment problem. Microprocessors and Microsystems, 26, 363\u2013371.","journal-title":"Microprocessors and Microsystems"},{"issue":"3","key":"959_CR36","doi-asserted-by":"crossref","first-page":"579","DOI":"10.1007\/s00291-006-0070-3","volume":"30","author":"A Scholl","year":"2008","unstructured":"Scholl, A., Boysen, N., & Fliedner, M. (2008). The sequence-dependent assembly line balancing problem. OR Spectrum, 30(3), 579\u2013609.","journal-title":"OR Spectrum"},{"key":"959_CR37","doi-asserted-by":"crossref","unstructured":"Shi, Y., & Eberhart, R. C. (1998). A modified particle swarm optimizer. In Proceedings of the IEEE Congress on Evolutionary Computation, USA (pp. 69\u201373).","DOI":"10.1109\/ICEC.1998.699146"},{"key":"959_CR38","doi-asserted-by":"crossref","unstructured":"Shi, Y., & Eberhart, R. C. (1999). Empirical study of particle swarm optimization. In Proceedings of the IEEE Congress on Evolutionary Computation (pp. 1945\u20131950). IEEE Press.","DOI":"10.1109\/CEC.1999.785511"},{"key":"959_CR39","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1080\/00207548408942450","volume":"22","author":"A Shtub","year":"1984","unstructured":"Shtub, A. (1984). The effect of incompletion cost on line balancing with multiple manning of work stations. International Journal of Production Research, 22, 235\u2013245.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"959_CR40","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1016\/j.cie.2007.10.007","volume":"56","author":"AS Simaria","year":"2009","unstructured":"Simaria, A. S., & Vilarinho, P. M. (2009). 2-ANTBAL: An ant colony optimisation algorithm for balancing two-sided assembly lines. Computers and Industrial Engineering, 56(2), 489\u2013506.","journal-title":"Computers and Industrial Engineering"},{"key":"959_CR41","doi-asserted-by":"crossref","unstructured":"Sun, J., Xu, W., & Feng, B. (2004). A global search strategy of quantum-behaved particle swarm optimization. In Proceedings of the 2004 IEEE conference on cybernetics and intelligent systems (Vol. 1, pp. 111\u2013116).","DOI":"10.1109\/ICCIS.2004.1460396"},{"key":"959_CR42","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1287\/mnsc.16.9.593","volume":"16","author":"NT Thomopoulos","year":"1970","unstructured":"Thomopoulos, N. T. (1970). Mixed model line balancing with smoothed station assignments. Management Science, 16, 593\u2013603.","journal-title":"Management Science"},{"issue":"5","key":"959_CR43","doi-asserted-by":"crossref","first-page":"866","DOI":"10.1016\/j.engappai.2011.02.009","volume":"24","author":"SK Tyagi","year":"2011","unstructured":"Tyagi, S. K., Yang, K., Tyagi, A., & Dwivedi, S. N. (2011). Development of a fuzzy goal programming model for optimization of lead time and cost in an overlapped product development project using a Gaussian adaptive particle swarm optimization-based approach. Engineering Applications of Artificial Intelligence, 24(5), 866\u2013879.","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"6","key":"959_CR44","doi-asserted-by":"crossref","first-page":"1362","DOI":"10.1109\/TSMCB.2009.2015956","volume":"39","author":"ZH Zhan","year":"2009","unstructured":"Zhan, Z. H., Zhang, J., Li, Y., & Chung, H. H. (2009). Adaptive particle swarm optimization. IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics, 39(6), 1362\u20131381.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0959-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-0959-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0959-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-0959-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:03Z","timestamp":1559268723000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-0959-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,5]]},"references-count":44,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,1]]}},"alternative-id":["959"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-0959-7","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,5]]}}}