{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,15]],"date-time":"2026-01-15T21:19:08Z","timestamp":1768511948596,"version":"3.49.0"},"reference-count":33,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2014,11,21]],"date-time":"2014-11-21T00:00:00Z","timestamp":1416528000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2017,4]]},"DOI":"10.1007\/s10845-014-1001-9","type":"journal-article","created":{"date-parts":[[2014,11,21]],"date-time":"2014-11-21T11:20:10Z","timestamp":1416568810000},"page":"857-867","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":30,"title":["Coordinative production and maintenance scheduling problem with flexible maintenance time intervals"],"prefix":"10.1007","volume":"28","author":[{"given":"Mostafa","family":"Khatami","sequence":"first","affiliation":[]},{"given":"Seyed Hessameddin","family":"Zegordi","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,11,21]]},"reference":[{"key":"1001_CR1","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1007\/s10845-011-0536-2","volume":"24","author":"J-P Arnaout","year":"2013","unstructured":"Arnaout, J.-P. (2013). Ant colony optimization algorithm for the Euclidean location-allocation problem with unknown number of facilities. Journal of Intelligent Manufacturing, 24, 45\u201354.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1001_CR2","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1007\/s10845-012-0672-3","volume":"25","author":"J-P Arnaout","year":"2014","unstructured":"Arnaout, J.-P., Musa, R., & Rabadi, G. (2014). A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines-part II: Enhancements and experimentations. Journal of Intelligent Manufacturing, 25, 43\u201353.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1001_CR3","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/s10845-008-0113-5","volume":"20","author":"A Berrichi","year":"2009","unstructured":"Berrichi, A., Amodeo, L., Yalaoui, F., Chatelet, E., & Mezghiche, M. (2009). Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem. Journal of Intelligent Manufacturing, 20, 389\u2013400.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1001_CR4","doi-asserted-by":"crossref","first-page":"1584","DOI":"10.1016\/j.cor.2009.11.017","volume":"37","author":"A Berrichi","year":"2010","unstructured":"Berrichi, A., Yalaoui, F., Amodeo, L., & Mezghiche, M. (2010). Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Computers & Operations Research, 37, 1584\u20131596.","journal-title":"Computers & Operations Research"},{"key":"1001_CR5","doi-asserted-by":"crossref","first-page":"2295","DOI":"10.1007\/s00170-013-4841-0","volume":"68","author":"A Berrichi","year":"2013","unstructured":"Berrichi, A., & Yalaoui, F. (2013). Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem. International Journal of Advanced Manufacturing Technology, 68, 2295\u20132310.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"1001_CR6","doi-asserted-by":"crossref","first-page":"B630","DOI":"10.1287\/mnsc.16.10.B630","volume":"16","author":"HG Campbell","year":"1970","unstructured":"Campbell, H. G., Dudek, R. A., & Smith, M. L. (1970). A heuristic algorithm for the n job, m machine sequencing problem. Management Science, 16, B630\u2013B637.","journal-title":"Management Science"},{"key":"1001_CR7","unstructured":"Dorigo, M. (1992). Optimization, learning and natural algorithm. Thesis (Ph.D.), DEI, Politecnico di Milano."},{"key":"1001_CR8","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1109\/4235.585892","volume":"1","author":"M Dorigo","year":"1997","unstructured":"Dorigo, M., & Gambardella, L. M. (1997). Ant colony system: A cooperative learning approach to the traveling salesman problem. IEEE Transactions on Evolutionary Computation, 1, 53\u201366.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"1001_CR9","volume-title":"An introduction to reliability and maintainability engineering","author":"CE Ebeling","year":"1997","unstructured":"Ebeling, C. E. (1997). An introduction to reliability and maintainability engineering. USA: McGraw-Hill."},{"key":"1001_CR10","doi-asserted-by":"crossref","first-page":"204","DOI":"10.1109\/TEVC.2003.810752","volume":"7","author":"H Ishibuchi","year":"2003","unstructured":"Ishibuchi, H., Yoshida, T., & Murata, T. (2003). Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling. IEEE Transactions on Evolutionary Computation, 7, 204\u2013223.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"1001_CR11","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0167-6377(96)00041-7","volume":"20","author":"CY Lee","year":"1997","unstructured":"Lee, C. Y. (1997). Minimizing the makespan in the two machine flowshop scheduling problem with an availability constraint. Operations Research Letters, 20, 129\u2013139.","journal-title":"Operations Research Letters"},{"key":"1001_CR12","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.cie.2009.04.014","volume":"58","author":"Y Ma","year":"2010","unstructured":"Ma, Y., Chu, C., & Zuo, C. (2010). A survey of scheduling with deterministic machine availability constraints. Computers & Industrial Engineering, 58, 199\u2013211.","journal-title":"Computers & Industrial Engineering"},{"key":"1001_CR13","doi-asserted-by":"crossref","first-page":"5906","DOI":"10.1080\/00207543.2011.637092","volume":"50","author":"H Mokhtari","year":"2012","unstructured":"Mokhtari, H., Mozdgir, A., & Nakhai Kamal Abadi, I. (2012). A reliability\/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services. International Journal of Production Research, 50, 5906\u20135925.","journal-title":"International Journal of Production Research"},{"key":"1001_CR14","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1007\/s10878-005-4922-6","volume":"10","author":"R Montemanni","year":"2005","unstructured":"Montemanni, R., Gambardella, L. M., Rizzoli, A. E., & Donati, A. V. (2005). Ant colony system for a dynamic vehicle routing problem. Journal of Combinatorial Optimization, 10, 327\u2013343.","journal-title":"Journal of Combinatorial Optimization"},{"key":"1001_CR15","doi-asserted-by":"crossref","first-page":"829","DOI":"10.1007\/s00170-010-2666-7","volume":"51","author":"E Moradi","year":"2010","unstructured":"Moradi, E., & Zandieh, M. (2010). Minimizing the makespan and the system unavailability in parallel machine scheduling problem: A similarity-based genetic algorithm. International Journal of Advanced Manufacturing Technology, 51, 829\u2013840.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"1001_CR16","doi-asserted-by":"crossref","unstructured":"Moradi, E., Fatemi Ghomi, S. M. T., & Zandieh, M. (2011). Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Systems with Applications, 38, 7169\u20137178.","DOI":"10.1016\/j.eswa.2010.12.043"},{"key":"1001_CR17","doi-asserted-by":"crossref","unstructured":"Nawaz, M., Enscore, E. E, Jr., & Ham, I. (1983). A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA, 11, 91\u201395.","DOI":"10.1016\/0305-0483(83)90088-9"},{"key":"1001_CR18","doi-asserted-by":"publisher","unstructured":"Rossi, A., & Lanzetta, M. (2013). Native metaheuristics for non-permutation flowshop scheduling. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-012-0724-8 .","DOI":"10.1007\/s10845-012-0724-8"},{"key":"1001_CR19","doi-asserted-by":"crossref","first-page":"479","DOI":"10.1016\/j.ejor.2004.04.017","volume":"165","author":"R Ruiz","year":"2005","unstructured":"Ruiz, R., & Maroto, C. (2005). A comprehensive review and evaluation of permutation flowshop heuristics. European Journal of Operational Research, 165, 479\u201394.","journal-title":"European Journal of Operational Research"},{"key":"1001_CR20","doi-asserted-by":"crossref","first-page":"3314","DOI":"10.1016\/j.cor.2005.12.007","volume":"34","author":"R Ruiz","year":"2007","unstructured":"Ruiz, R., Garcia-Diaz, J. C., & Maroto, C. (2007). Considering scheduling and preventive maintenance in the flow shop sequencing problem. Computers & Operations Research, 34, 3314\u20133330.","journal-title":"Computers & Operations Research"},{"key":"1001_CR21","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","volume":"121","author":"G Schmidt","year":"2000","unstructured":"Schmidt, G. (2000). Scheduling with limited machine availability. European Journal of Operational Research, 121, 1\u201315.","journal-title":"European Journal of Operational Research"},{"key":"1001_CR22","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","volume":"64","author":"E Taillard","year":"1993","unstructured":"Taillard, E. (1993). Benchmarks for basic scheduling problems. European Journal of Operational Research, 64, 278\u201385.","journal-title":"European Journal of Operational Research"},{"key":"1001_CR23","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1109\/TEVC.2012.2185702","volume":"17","author":"L Tang","year":"2013","unstructured":"Tang, L., & Wang, X. (2013). A hybrid multiobjective evolutionary algorithm for multiobjective optimization problems. IEEE Transactions on Evolutionary Computation, 17, 20\u201345.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"1001_CR24","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1109\/TEVC.2013.2250977","volume":"18","author":"L Tang","year":"2014","unstructured":"Tang, L., Zhao, Y., & Liu, J. (2014). An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continuous casting production. IEEE Transactions on Evolutionary Computation, 18, 209\u2013225.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"key":"1001_CR25","doi-asserted-by":"crossref","first-page":"772","DOI":"10.1287\/opre.2014.1278","volume":"62","author":"L Tang","year":"2014","unstructured":"Tang, L., Wang, G., & Chen, Z.-L. (2014). Integrated charge batching and casting width selection at baosteel. Operations Research, 62, 772\u2013787.","journal-title":"Operations Research"},{"key":"1001_CR26","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1016\/j.engappai.2012.03.011","volume":"26","author":"RF Tavares Neto","year":"2013","unstructured":"Tavares Neto, R. F., & Godinho Filho, M. (2013). Literature review regarding ant colony optimization applied to scheduling problems: Guidelines for implementation and directions for future research. Engineering Applications of Artificial Intelligence, 26, 150\u2013161.","journal-title":"Engineering Applications of Artificial Intelligence"},{"key":"1001_CR27","doi-asserted-by":"publisher","unstructured":"Tavares Neto, R. F., Godinho Filho, M., & Molina da Silva, F. (2013). An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0811-5 .","DOI":"10.1007\/s10845-013-0811-5"},{"key":"1001_CR28","doi-asserted-by":"crossref","unstructured":"Tseng, F. T., Stafford, E. F, Jr., & Gupta, J. N. D. (2004). An empirical analysis of integer programming formulations for the permutation flowshop. Omega, 32, 285\u2013293.","DOI":"10.1016\/j.omega.2003.12.001"},{"key":"1001_CR29","volume-title":"Reliability, availability, maintainability and safety assessment","author":"A Villemeur","year":"1991","unstructured":"Villemeur, A. (1991). Reliability, availability, maintainability and safety assessment. USA: Wiley."},{"key":"1001_CR30","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1057\/jors.1989.58","volume":"40","author":"JM Wilson","year":"1989","unstructured":"Wilson, J. M. (1989). Alternative formulations of a flow-shop scheduling problem. Journal of the Operational Research Society, 40, 395\u20139.","journal-title":"Journal of the Operational Research Society"},{"key":"1001_CR31","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/j.cie.2007.08.003","volume":"54","author":"B Yagmahan","year":"2008","unstructured":"Yagmahan, B., & Yenisey, M. M. (2008). Ant colony optimization for multi-objective flow shop scheduling problem. Computers & Industrial Engineering, 54, 411\u2013420.","journal-title":"Computers & Industrial Engineering"},{"key":"1001_CR32","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.jmsy.2010.12.002","volume":"29","author":"J Yao","year":"2010","unstructured":"Yao, J. (2010). Decision optimization analysis on supply chain resource integration in fourth party logistics. Journal of Manufacturing Systems., 29, 121\u2013129.","journal-title":"Journal of Manufacturing Systems."},{"key":"1001_CR33","unstructured":"Zitzler, E. (1999). Evolutionary algorithms for multi-objective optimization: Methods and applications. Thesis (Ph.D.), Swiss Federal Institute of Technology."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-1001-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-1001-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-1001-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-1001-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:04Z","timestamp":1559268724000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-1001-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,11,21]]},"references-count":33,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2017,4]]}},"alternative-id":["1001"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-1001-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,11,21]]}}}