{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,25]],"date-time":"2026-02-25T08:13:04Z","timestamp":1772007184697,"version":"3.50.1"},"reference-count":50,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,12,20]],"date-time":"2014-12-20T00:00:00Z","timestamp":1419033600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2018,3]]},"DOI":"10.1007\/s10845-014-1023-3","type":"journal-article","created":{"date-parts":[[2014,12,19]],"date-time":"2014-12-19T20:29:43Z","timestamp":1419020983000},"page":"585-601","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":82,"title":["Integrated process planning and scheduling: an enhanced ant colony optimization heuristic with parameter tuning"],"prefix":"10.1007","volume":"29","author":[{"given":"S.","family":"Zhang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"T. N.","family":"Wong","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2014,12,20]]},"reference":[{"issue":"1","key":"1023_CR1","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1007\/s10845-012-0672-3","volume":"25","author":"JP Arnaout","year":"2014","unstructured":"Arnaout, J. P., Musa, R., & Rabadi, G. (2014). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines\u2014part ii: Enhancements and experimentations. Journal of Intelligent Manufacturing, 25(1), 43\u201353.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1023_CR2","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1007\/s10845-009-0246-1","volume":"21","author":"JP Arnaout","year":"2010","unstructured":"Arnaout, J. P., Rabadi, G., & Musa, R. (2010). A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times. Journal of Intelligent Manufacturing, 21(6), 693\u2013701.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"02n03","key":"1023_CR3","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1142\/S0218843096000075","volume":"05","author":"S Balasubramanian","year":"1996","unstructured":"Balasubramanian, S., Maturana, F. P., & Norrie, D. H. (1996). Multi-agent planning and coordination for distributed concurrent engineering. International Journal of Cooperative Information Systems, 05(02n03), 153\u2013179.","journal-title":"International Journal of Cooperative Information Systems"},{"issue":"4","key":"1023_CR4","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1016\/j.plrev.2005.10.001","volume":"2","author":"C Blum","year":"2005","unstructured":"Blum, C. (2005). Ant colony optimization: Introduction and recent trends. Physics of Life Reviews, 2(4), 353\u2013373.","journal-title":"Physics of Life Reviews"},{"issue":"4\u20135","key":"1023_CR5","first-page":"345","volume":"19","author":"CW Chiang","year":"2008","unstructured":"Chiang, C. W., Huang, Y. Q., & Wang, W. Y. (2008). Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling. Journal of Intelligent and Fuzzy Systems, 19(4\u20135), 345\u2013358.","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"key":"1023_CR6","volume-title":"Optimization, Learning and Natural Algorithms","author":"M Dorigo","year":"1992","unstructured":"Dorigo, M. (1992). Optimization, Learning and Natural Algorithms. Italy: Politecnico di Milano."},{"key":"1023_CR7","volume-title":"A study of some properties of ant-Q parallel problem solving from nature-PPSN IV","author":"M Dorigo","year":"1996","unstructured":"Dorigo, M., & Gambardella, L. M. (1996). A study of some properties of ant-Q parallel problem solving from nature-PPSN IV. Berlin: Springer."},{"key":"1023_CR8","unstructured":"Dorigo, M., Maniezzo, V., & Colorni, A. (1991). The ant system: An autocatalytic optimizing process. Technical report."},{"issue":"2","key":"1023_CR9","doi-asserted-by":"crossref","first-page":"477","DOI":"10.1016\/S0360-8352(96)00056-3","volume":"32","author":"P Gu","year":"1997","unstructured":"Gu, P., Balasubramanian, S., & Norrie, D. H. (1997). Bidding-based process planning and scheduling in a multi-agent system. Computers and Industrial Engineering, 32(2), 477\u2013496.","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"1023_CR10","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1016\/j.rcim.2007.12.002","volume":"25","author":"YW Guo","year":"2009","unstructured":"Guo, Y. W., Li, W. D., Mileham, A. R., & Owen, G. W. (2009). Applications of particle swarm optimisation in integrated process planning and scheduling. Robotics and Computer-Integrated Manufacturing, 25(2), 280\u2013288.","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"10","key":"1023_CR11","doi-asserted-by":"crossref","first-page":"2901","DOI":"10.1080\/00207549608905065","volume":"34","author":"YC Ho","year":"1996","unstructured":"Ho, Y. C., & Moodie, C. L. (1996). Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. International Journal of Production Research, 34(10), 2901\u20132923.","journal-title":"International Journal of Production Research"},{"key":"1023_CR12","first-page":"447","volume":"27","author":"K Iwata","year":"1978","unstructured":"Iwata, K., Murotsu, Y., & Oba, F. (1978). Optimization of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems. Annals of the CIRP, 27, 447\u2013451.","journal-title":"Annals of the CIRP"},{"issue":"3","key":"1023_CR13","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1007\/BF01471363","volume":"2","author":"B Khoshnevis","year":"1991","unstructured":"Khoshnevis, B., & Chen, Q. M. (1991). Integration of process planning and scheduling functions. Journal of Intelligent Manufacturing, 2(3), 165\u2013175.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1023_CR14","doi-asserted-by":"crossref","first-page":"631","DOI":"10.1007\/s10845-007-0037-5","volume":"18","author":"YK Kim","year":"2007","unstructured":"Kim, Y. K., Kim, J. Y., & Shin, K. S. (2007). An asymmetric multileveled symbiotic evolutionary algorithm for integrated FMS scheduling. Journal of Intelligent Manufacturing, 18(6), 631\u2013645.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"8","key":"1023_CR15","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1016\/S0305-0548(02)00063-1","volume":"30","author":"YK Kim","year":"2003","unstructured":"Kim, Y. K., Park, K., & Ko, J. (2003). A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30(8), 1151\u20131171.","journal-title":"Computers and Operations Research"},{"issue":"2","key":"1023_CR16","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1016\/S0377-2217(02)00828-7","volume":"151","author":"T Kis","year":"2003","unstructured":"Kis, T. (2003). Job-shop scheduling with processing alternatives. European Journal of Operational Research, 151(2), 307\u2013332.","journal-title":"European Journal of Operational Research"},{"issue":"17","key":"1023_CR17","doi-asserted-by":"crossref","first-page":"3959","DOI":"10.1080\/00207540110072263","volume":"39","author":"CS Ko","year":"2001","unstructured":"Ko, C. S., Kim, T., & Hwang, H. (2001). External partner selection using tabu search heuristics in distributed manufacturing. International Journal of Production Research, 39(17), 3959\u20133974.","journal-title":"International Journal of Production Research"},{"issue":"1\u20134","key":"1023_CR18","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/s00170-013-4769-4","volume":"67","author":"P Korytkowski","year":"2013","unstructured":"Korytkowski, P., Rymaszewski, S., & Wisniewski, T. (2013). Ant colony optimization for job shop scheduling using multi-attribute dispatching rules. International Journal of Advanced Manufacturing Technology, 67(1\u20134), 231\u2013241.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1\u20133","key":"1023_CR19","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0924-0136(03)00088-8","volume":"138","author":"M Kumar","year":"2003","unstructured":"Kumar, M., & Rajotia, S. (2003). Integration of scheduling with computer aided process planning. Journal of Materials Processing Technology, 138(1\u20133), 297\u2013300.","journal-title":"Journal of Materials Processing Technology"},{"issue":"10","key":"1023_CR20","doi-asserted-by":"crossref","first-page":"1443","DOI":"10.1243\/095440503322617216","volume":"217","author":"R Kumar","year":"2003","unstructured":"Kumar, R., Tiwari, M. K., & Shankar, R. (2003). Scheduling of flexible manufacturing systems: An ant colony optimization approach. Proceedings of the Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture, 217(10), 1443\u20131453.","journal-title":"Proceedings of the Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture"},{"issue":"4","key":"1023_CR21","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1057\/palgrave.jors.2602423","volume":"59","author":"A Lawrynowicz","year":"2008","unstructured":"Lawrynowicz, A. (2008). Integration of production planning and scheduling using an expert system and a genetic algorithm. Journal of the Operational Research Society, 59(4), 455\u2013463.","journal-title":"Journal of the Operational Research Society"},{"issue":"8","key":"1023_CR22","doi-asserted-by":"crossref","first-page":"586","DOI":"10.1007\/s001700170035","volume":"18","author":"H Lee","year":"2001","unstructured":"Lee, H., & Kim, S.-S. (2001). Integration of process planning and scheduling using simulation based genetic algorithms. The International Journal of Advanced Manufacturing Technology, 18(8), 586\u2013590.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"1023_CR23","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1016\/j.cie.2009.09.003","volume":"59","author":"CW Leung","year":"2010","unstructured":"Leung, C. W., Wong, T. N., Mak, K. L., & Fung, R. Y. K. (2010). Integrated process planning and scheduling by an agent-based ant colony optimization. Computers and Industrial Engineering, 59(1), 166\u2013180.","journal-title":"Computers and Industrial Engineering"},{"issue":"1","key":"1023_CR24","doi-asserted-by":"crossref","first-page":"288","DOI":"10.1016\/j.eswa.2011.07.019","volume":"39","author":"X Li","year":"2012","unstructured":"Li, X., Gao, L., & Li, W. (2012). Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling. Expert Systems with Applications, 39(1), 288\u2013297.","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"1023_CR25","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ijpe.2010.04.001","volume":"126","author":"X Li","year":"2010","unstructured":"Li, X., Shao, X., Gao, L., & Qian, W. (2010). An effective hybrid algorithm for integrated process planning and scheduling. International Journal of Production Economics, 126(2), 289\u2013298.","journal-title":"International Journal of Production Economics"},{"issue":"1\u20134","key":"1023_CR26","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1007\/s00170-013-4766-7","volume":"67","author":"CW Lin","year":"2013","unstructured":"Lin, C. W., Lin, Y. K., & Hsieh, H. T. (2013). Ant colony optimization for unrelated parallel machine scheduling. International Journal of Advanced Manufacturing Technology, 67(1\u20134), 35\u201345.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"1023_CR27","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s10845-010-0407-2","volume":"24","author":"X-J Liu","year":"2013","unstructured":"Liu, X.-J., Yi, H., & Ni, Z.-H. (2013). Application of ant colony optimization algorithm in process planning optimization. Journal of Intelligent Manufacturing, 24(1), 1\u201313.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"1023_CR28","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1109\/TEVC.2002.802450","volume":"6","author":"D Merkle","year":"2002","unstructured":"Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE Transactions on Evolutionary Computation, 6(4), 333\u2013346.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"issue":"2","key":"1023_CR29","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1023\/A:1008976720878","volume":"10","author":"N Morad","year":"1999","unstructured":"Morad, N., & Zalzala, A. (1999). Genetic algorithms in integrated process planning and scheduling. Journal of Intelligent Manufacturing, 10(2), 169\u2013179.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"9","key":"1023_CR30","doi-asserted-by":"crossref","first-page":"1595","DOI":"10.1080\/00207549008942818","volume":"28","author":"N Nasr","year":"1990","unstructured":"Nasr, N., & Elsayed, E. A. (1990). Job shop scheduling with alternative machines. International Journal of Production Research, 28(9), 1595\u20131609.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1023_CR31","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/BF00118077","volume":"7","author":"GJ Palmer","year":"1996","unstructured":"Palmer, G. J. (1996). A simulated annealing approach to integrated production scheduling. Journal of Intelligent Manufacturing, 7(3), 163\u2013176.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"5\u20138","key":"1023_CR32","first-page":"727","volume":"58","author":"LH Qiao","year":"2012","unstructured":"Qiao, L. H., & Lv, S. P. (2012). An improved genetic algorithm for integrated process planning and scheduling. International Journal of Advanced Manufacturing Technology, 58(5\u20138), 727\u2013740.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"9","key":"1023_CR33","doi-asserted-by":"crossref","first-page":"2639","DOI":"10.1080\/00207549608905049","volume":"34","author":"Y Seo","year":"1996","unstructured":"Seo, Y., & Egbelu, P. J. (1996). Process plan selection based on product mix and production volume. International Journal of Production Research, 34(9), 2639\u20132655.","journal-title":"International Journal of Production Research"},{"issue":"6","key":"1023_CR34","doi-asserted-by":"crossref","first-page":"2082","DOI":"10.1016\/j.cor.2008.07.006","volume":"36","author":"XY Shao","year":"2009","unstructured":"Shao, X. Y., Li, X. Y., Gao, L., & Zhang, C. Y. (2009). Integration of process planning and scheduling\u2014A modified genetic algorithm-based approach. Computers and Operations Research, 36(6), 2082\u20132096.","journal-title":"Computers and Operations Research"},{"key":"1023_CR35","unstructured":"St\u00fctzle, T. (1997). MAX\u2013MIN ant system for quadratic assignment problems: Technical report AIDA-97-4. FB Infomatik, TU Darmstadt, Germany: FG Intellektik."},{"key":"1023_CR36","unstructured":"St\u00fctzle, T., L\u00f3pez-Ib\u00e1nez, M., Pellegrini, P., Maur, M., de Oca, M. M., Birattari, M., et al. (2012). Parameter adaptation in ant colony optimization. In Autonomous search (pp. 191\u2013215). Springer."},{"key":"1023_CR37","doi-asserted-by":"publisher","unstructured":"Tavares Neto, R., Godinho Filho, M., & da Silva, F. (2013). An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-013-0811-5 .","DOI":"10.1007\/s10845-013-0811-5"},{"issue":"4","key":"1023_CR38","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1007\/s10845-008-0206-1","volume":"21","author":"H Tehrani Nik Nejad","year":"2010","unstructured":"Tehrani Nik Nejad, H., Sugimura, N., Iwamura, K., & Tanimizu, Y. (2010). Multi agent architecture for dynamic incremental process planning in the flexible manufacturing system. Journal of Intelligent Manufacturing, 21(4), 487\u2013499.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"5","key":"1023_CR39","doi-asserted-by":"crossref","first-page":"485","DOI":"10.1023\/A:1025705426184","volume":"14","author":"JM Usher","year":"2003","unstructured":"Usher, J. M. (2003). Negotiation-based routing in job shops via collaborative agents. Journal of Intelligent Manufacturing, 14(5), 485\u2013499.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1023_CR40","doi-asserted-by":"crossref","first-page":"1185","DOI":"10.1007\/s10845-012-0650-9","volume":"24","author":"J Ventura","year":"2013","unstructured":"Ventura, J., & Yoon, S.-H. (2013). A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. Journal of Intelligent Manufacturing, 24(6), 1185\u20131196.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"7","key":"1023_CR41","doi-asserted-by":"crossref","first-page":"748","DOI":"10.1016\/j.cjche.2014.05.011","volume":"22","author":"J Wang","year":"2014","unstructured":"Wang, J., Fan, X., Zhang, C., & Wan, S. (2014). A graph-based ant colony optimization approach for integrated process planning and scheduling. Chinese Journal of Chemical Engineering, 22(7), 748\u2013753.","journal-title":"Chinese Journal of Chemical Engineering"},{"issue":"11","key":"1023_CR42","first-page":"1093","volume":"31","author":"A Weintraub","year":"1999","unstructured":"Weintraub, A., Cormier, D., Hodgson, T., King, R., Wilson, J., & Zozom, A. (1999). Scheduling with alternatives: A link between process planning and scheduling. Iie Transactions, 31(11), 1093\u20131102.","journal-title":"Iie Transactions"},{"issue":"7","key":"1023_CR43","doi-asserted-by":"crossref","first-page":"1331","DOI":"10.1080\/00207540500409723","volume":"44","author":"TN Wong","year":"2006","unstructured":"Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006a). An agent-based negotiation approach to integrate process planning and scheduling. International Journal of Production Research, 44(7), 1331\u20131351.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1023_CR44","doi-asserted-by":"crossref","first-page":"486","DOI":"10.1016\/j.eswa.2005.09.073","volume":"31","author":"TN Wong","year":"2006","unstructured":"Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006b). Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Systems with Applications, 31(3), 486\u2013494.","journal-title":"Expert Systems with Applications"},{"key":"1023_CR45","doi-asserted-by":"crossref","unstructured":"Wong, T. N., Leung, C. W., Mak, K. L., & Fung, R. Y. K. (2006c). Integrated process planning and scheduling\/rescheduling\u2014an agent-based approach. International Journal of Production Research, 44(18\u201319), 3627\u20133655.","DOI":"10.1080\/00207540600675801"},{"issue":"21","key":"1023_CR46","doi-asserted-by":"crossref","first-page":"6188","DOI":"10.1080\/00207543.2012.720393","volume":"50","author":"TN Wong","year":"2012","unstructured":"Wong, T. N., Zhang, S. C., Wang, G., & Zhang, L. P. (2012). Integrated process planning and scheduling\u2014Multi-agent system with two-stage ant colony optimisation algorithm. International Journal of Production Research, 50(21), 6188\u20136201.","journal-title":"International Journal of Production Research"},{"issue":"5","key":"1023_CR47","doi-asserted-by":"crossref","first-page":"1985","DOI":"10.1007\/s10845-011-0525-5","volume":"23","author":"W-H Wu","year":"2012","unstructured":"Wu, W.-H., Cheng, S.-R., Wu, C.-C., & Yin, Y. (2012). Ant colony algorithms for a two-agent scheduling with sum-of processing times-based learning and deteriorating considerations. Journal of Intelligent Manufacturing, 23(5), 1985\u20131993.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"1023_CR48","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1061\/(ASCE)ME.1943-5479.0000089","volume":"28","author":"H Zhang","year":"2012","unstructured":"Zhang, H. (2012a). Ant colony optimization for multimode resource-constrained project scheduling. Journal of Management in Engineering, 28(2), 150\u2013159.","journal-title":"Journal of Management in Engineering"},{"key":"1023_CR49","unstructured":"Zhang, S. (2012b). An enhanced ant colony optimization approach for integrating process planning and scheduling based on multi-agent system. (Master of Phylosophy M.Phil. thesis), The Uinversity of Hong Kong, Hong Kong SAR, China."},{"key":"1023_CR50","unstructured":"Zhu, H. Y., Ye, W. H., & Bei, G. X. (2009, 26\u201329 Nov. 2009). A particle swarm optimization for integrated process planning and scheduling. Paper presented at the IEEE 10th international conference on computer-aided industrial design and conceptual design, 2009. CAID and CD 2009."}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-1023-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-014-1023-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-1023-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-014-1023-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,18]],"date-time":"2019-08-18T16:42:55Z","timestamp":1566146575000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-014-1023-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12,20]]},"references-count":50,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,3]]}},"alternative-id":["1023"],"URL":"https:\/\/doi.org\/10.1007\/s10845-014-1023-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,12,20]]}}}