{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,8]],"date-time":"2026-01-08T09:45:48Z","timestamp":1767865548147,"version":"3.49.0"},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2015,2,14]],"date-time":"2015-02-14T00:00:00Z","timestamp":1423872000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2017,6]]},"DOI":"10.1007\/s10845-015-1052-6","type":"journal-article","created":{"date-parts":[[2015,2,17]],"date-time":"2015-02-17T09:14:04Z","timestamp":1424164444000},"page":"1095-1107","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":20,"title":["A new cloud computing method for establishing asymmetric cycle time intervals in a wafer fabrication factory"],"prefix":"10.1007","volume":"28","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hsin-Chieh","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,2,14]]},"reference":[{"issue":"5","key":"1052_CR1","doi-asserted-by":"publisher","first-page":"1077","DOI":"10.1007\/s10845-013-0748-8","volume":"25","author":"B Archimede","year":"2014","unstructured":"Archimede, B., Letouzey, A., Memon, M. A., & Xu, J. (2014). Towards a distributed multi-agent framework for shared resources scheduling. Journal of Intelligent Manufacturing, 25(5), 1077\u20131087.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"5","key":"1052_CR2","doi-asserted-by":"publisher","first-page":"1167","DOI":"10.1109\/TSMCA.2012.2226442","volume":"43","author":"S Bernardi","year":"2013","unstructured":"Bernardi, S., & Campos, J. (2013). A min-max problem for the computation of the cycle time lower bound in interval-based time petri nets. IEEE Transactions on Systems, Man, and Cybernetics Part A: Systems and Humans, 43(5), 1167\u20131181.","journal-title":"IEEE Transactions on Systems, Man, and Cybernetics Part A: Systems and Humans"},{"issue":"5","key":"1052_CR3","doi-asserted-by":"publisher","first-page":"1065","DOI":"10.1007\/s10845-013-0740-3","volume":"25","author":"T Borangiu","year":"2014","unstructured":"Borangiu, T., Raileanu, S., Trentesaux, D., Berger, T., & Iacob, I. (2014). Distributed manufacturing control with extended CNP interaction of intelligent products. Journal of Intelligent Manufacturing, 25(5), 1065\u20131075.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"1052_CR4","doi-asserted-by":"publisher","first-page":"271","DOI":"10.1007\/s11063-006-9027-4","volume":"24","author":"T Chen","year":"2006","unstructured":"Chen, T. (2006). A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Processing Letters, 24(3), 271\u2013288.","journal-title":"Neural Processing Letters"},{"key":"1052_CR5","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.aei.2006.10.002","volume":"21","author":"T Chen","year":"2007","unstructured":"Chen, T. (2007). An intelligent hybrid system for wafer lot output time prediction. Advanced Engineering Informatics, 21, 55\u201365.","journal-title":"Advanced Engineering Informatics"},{"key":"1052_CR6","doi-asserted-by":"publisher","first-page":"196","DOI":"10.1016\/j.compind.2010.10.012","volume":"62","author":"T Chen","year":"2011","unstructured":"Chen, T. (2011). A hybrid fuzzy and neural approach for DRAM price forecasting. Computers in Industry, 62, 196\u2013204.","journal-title":"Computers in Industry"},{"key":"1052_CR7","doi-asserted-by":"publisher","first-page":"834","DOI":"10.1016\/j.cie.2013.09.010","volume":"66","author":"T Chen","year":"2013","unstructured":"Chen, T. (2013a). An effective fuzzy collaborative forecasting approach for predicting the job-cycle time in wafer fabrication. Computers & Industrial Engineering, 66, 834\u2013848.","journal-title":"Computers & Industrial Engineering"},{"key":"1052_CR8","doi-asserted-by":"publisher","first-page":"4637","DOI":"10.3390\/su5114637","volume":"5","author":"T Chen","year":"2013","unstructured":"Chen, T. (2013b). A systematic cycle time reduction procedure for enhancing the competitiveness and sustainability of a semiconductor manufacturer. Sustainability, 5, 4637\u20134652.","journal-title":"Sustainability"},{"key":"1052_CR9","doi-asserted-by":"publisher","first-page":"409","DOI":"10.3390\/sym6020409","volume":"6","author":"T Chen","year":"2014","unstructured":"Chen, T. (2014). The symmetric-partitioning and incremental-relearning classification and back-propagation-network tree approach for cycle time estimation in wafer fabrication. Symmetry, 6, 409\u2013426.","journal-title":"Symmetry"},{"issue":"9","key":"1052_CR10","first-page":"5193","volume":"7","author":"T Chen","year":"2011","unstructured":"Chen, T., & Lin, Y.-C. (2011). A collaborative fuzzy-neural approach for internal due date assignment in a wafer fabrication plant. International Journal of Innovative Computing, Information and Control, 7(9), 5193\u20135210.","journal-title":"International Journal of Innovative Computing, Information and Control"},{"key":"1052_CR11","doi-asserted-by":"publisher","unstructured":"Chen, T., & Wang, Y.-C. (2010). Incorporating the FCM-BPN approach with nonlinear programming for internal due date assignment in a wafer fabrication plant, Robotics and Computer Integrated Manufacturing, 26, 83\u201391.","DOI":"10.1016\/j.rcim.2009.04.001"},{"key":"1052_CR12","doi-asserted-by":"publisher","unstructured":"Chen, T., Wu, H.-C., & Wang, Y.-C. (2009). Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab. Applied Soft Computing, 9, 1225\u20131231.","DOI":"10.1016\/j.asoc.2009.03.006"},{"key":"1052_CR13","doi-asserted-by":"publisher","unstructured":"Chien, C. F., Hsu, C. Y., & Hsiao, C. W. (2012). Manufacturing intelligence to forecast and reduce semiconductor cycle time. Journal of Intelligent Manufacturing, 23(6), 2281\u20132294.","DOI":"10.1007\/s10845-011-0572-y"},{"issue":"3","key":"1052_CR14","doi-asserted-by":"publisher","first-page":"393","DOI":"10.1007\/s10845-012-0688-8","volume":"25","author":"F-S Hsieh","year":"2014","unstructured":"Hsieh, F.-S., & Lin, J.-B. (2014). Context-aware workflow management for virtual enterprises based on coordination of agents. Journal of Intelligent Manufacturing, 25(3), 393\u2013412.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3\u20134","key":"1052_CR15","doi-asserted-by":"publisher","first-page":"563","DOI":"10.1016\/j.mcm.2008.04.012","volume":"49","author":"GK Janssens","year":"2009","unstructured":"Janssens, G. K., Sorensen, K., & Dullaert, W. (2009). An upper bound on the cycle time of a stochastic marked graph using incomplete information on the transition firing time distributions. Mathematical and Computer Modelling, 49(3\u20134), 563\u2013572.","journal-title":"Mathematical and Computer Modelling"},{"issue":"1","key":"1052_CR16","doi-asserted-by":"publisher","first-page":"28","DOI":"10.1016\/j.jmsy.2011.02.005","volume":"30","author":"OA Joseph","year":"2011","unstructured":"Joseph, O. A., & Sridharan, R. (2011). Analysis of dynamic due-date assignment models in a flexible manufacturing system. Journal of Manufacturing Systems, 30(1), 28\u201340.","journal-title":"Journal of Manufacturing Systems"},{"key":"1052_CR17","doi-asserted-by":"publisher","first-page":"374","DOI":"10.1109\/66.311341","volume":"7","author":"SCH Lu","year":"1994","unstructured":"Lu, S. C. H., Ramaswamy, D., & Kumar, P. R. (1994). Efficient scheduling policies to reduce mean and variation of cycle time in semiconductor manufacturing plant. IEEE Transactions on Semiconductor Manufacturing, 7, 374\u2013388.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"8","key":"1052_CR18","doi-asserted-by":"publisher","first-page":"2161","DOI":"10.1016\/j.cor.2013.03.004","volume":"40","author":"B Mor","year":"2013","unstructured":"Mor, B., Mosheiov, G., & Shabtay, D. (2013). A note: Minmax due-date assignment problem with lead-time cost. Computers & Operations Research, 40(8), 2161\u20132164.","journal-title":"Computers & Operations Research"},{"issue":"8","key":"1052_CR19","doi-asserted-by":"publisher","first-page":"857","DOI":"10.1002\/(SICI)1097-0258(19980430)17:8<857::AID-SIM777>3.0.CO;2-E","volume":"7","author":"RG Newcombe","year":"1998","unstructured":"Newcombe, R. G. (1998). Two- sided confidence intervals for the single proportion: Comparison of seven methods. Statistics in Medicine, 7(8), 857\u2013872.","journal-title":"Statistics in Medicine"},{"key":"1052_CR20","unstructured":"Oracle. (2014). Available to Promise (ATP). \n                        http:\/\/docs.oracle.com\/cd\/A60725_05\/html\/comnls\/us\/mrp\/atp.htm\n                        \n                    ."},{"issue":"2","key":"1052_CR21","doi-asserted-by":"publisher","first-page":"165","DOI":"10.1109\/TSM.2007.895215","volume":"20","author":"WL Pearn","year":"2007","unstructured":"Pearn, W. L., Chung, S. L., & Lai, C. M. (2007). Due-date assignment for wafer fabrication under demand variate environment. IEEE Transactions on Semiconductor Manufacturing, 20(2), 165\u2013175.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"1052_CR22","unstructured":"Sivakumar, A. I. (1999). Optimization of cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system. In Proceedings of the 1999 winter simulation conference (pp. 727\u2013735)."},{"issue":"1","key":"1052_CR23","doi-asserted-by":"publisher","first-page":"59","DOI":"10.1016\/S0166-3615(01)00081-1","volume":"45","author":"AI Sivakumar","year":"2001","unstructured":"Sivakumar, A. I., & Chong, C. S. (2001). A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing. Computers in Industry, 45(1), 59\u201378.","journal-title":"Computers in Industry"},{"issue":"2","key":"1052_CR24","doi-asserted-by":"publisher","first-page":"581","DOI":"10.1080\/00207543.2010.543938","volume":"50","author":"YT Tai","year":"2012","unstructured":"Tai, Y. T., Pearn, W. L., & Lee, J. H. (2012). Cycle time estimation for semiconductor final testing processes with Weibull-distributed waiting time. International Journal of Production Research, 50(2), 581\u2013592.","journal-title":"International Journal of Production Research"},{"key":"1052_CR25","doi-asserted-by":"publisher","unstructured":"Tirkel, I. (2011). Cycle time prediction in wafer fabrication line by applying data mining methods. In Proceedings of the 22nd annual IEEE\/SEMI advanced semiconductor manufacturing conference (pp. 5\u20135).","DOI":"10.1109\/ASMC.2011.5898218"},{"key":"1052_CR26","doi-asserted-by":"publisher","unstructured":"Tsai, H.-R., & Chen, T. (2013). A fuzzy nonlinear programming approach for optimizing the performance of a four-objective fluctuation smoothing rule in a wafer fabrication factory. Journal of Applied Mathematics, 2013, 1\u201315.","DOI":"10.1155\/2013\/720607"},{"issue":"2","key":"1052_CR27","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1007\/s10845-012-0661-6","volume":"25","author":"S Wang","year":"2014","unstructured":"Wang, S., Liu, Z., Sun, Q., Zou, H., & Yang, F. (2014). Towards an accurate evaluation of quality of cloud service in service-oriented cloud computing. Journal of Intelligent Manufacturing, 25(2), 283\u2013291.","journal-title":"Journal of Intelligent Manufacturing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1052-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-015-1052-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1052-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1052-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:06Z","timestamp":1559268726000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-015-1052-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,2,14]]},"references-count":27,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2017,6]]}},"alternative-id":["1052"],"URL":"https:\/\/doi.org\/10.1007\/s10845-015-1052-6","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,2,14]]}}}