{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,10]],"date-time":"2026-07-10T23:48:41Z","timestamp":1783727321069,"version":"3.55.0"},"reference-count":60,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2015,4,8]],"date-time":"2015-04-08T00:00:00Z","timestamp":1428451200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2017,6]]},"DOI":"10.1007\/s10845-015-1074-0","type":"journal-article","created":{"date-parts":[[2015,4,7]],"date-time":"2015-04-07T11:37:34Z","timestamp":1428406654000},"page":"1189-1201","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":78,"title":["Fast GA-based project scheduling for computing resources allocation in a cloud manufacturing system"],"prefix":"10.1007","volume":"28","author":[{"given":"Yang-Kuei","family":"Lin","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Chin Soon","family":"Chong","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,4,8]]},"reference":[{"issue":"3","key":"1074_CR1","doi-asserted-by":"publisher","first-page":"680","DOI":"10.1016\/j.scient.2011.11.047","volume":"19","author":"S Abrishami","year":"2012","unstructured":"Abrishami, S., & Naghibzadeh, M. (2012). Deadline-constrained workflow scheduling in software as a service cloud. Scientia Iranica, 19(3), 680\u2013689.","journal-title":"Scientia Iranica"},{"issue":"1","key":"1074_CR2","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1016\/j.cor.2010.01.007","volume":"38","author":"A Agarwal","year":"2011","unstructured":"Agarwal, A., Colak, S., & Erenguc, S. (2011). A neurogenetic approach for the resource-constrained project scheduling problem. Computer and Operations Research, 38(1), 44\u201350.","journal-title":"Computer and Operations Research"},{"key":"1074_CR3","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1023\/A:1010949931021","volume":"102","author":"A Alcaraz","year":"2001","unstructured":"Alcaraz, A., & Maroto, C. (2001). A robust genetic algorithm for resource allocation in project scheduling. Annals of Operations Research, 102, 83\u2013109.","journal-title":"Annals of Operations Research"},{"key":"1074_CR4","unstructured":"Alcaraz, J., Maroto, C., & Ruiz. R. (2004). Improving the performance of genetic algorithms for the RCPS problem. In Proceedings of the 9th International Workshop on Project Management and Scheduling (pp. 40\u201343)."},{"key":"1074_CR5","first-page":"1","volume-title":"Tabu search algorithms and lower bounds for the resource-constrained project scheduling problem","author":"T Baar","year":"1998","unstructured":"Baar, T., Brucker, P., & Knust, S. (1998). Tabu search algorithms and lower bounds for the resource-constrained project scheduling problem (pp. 1\u201318). US: Springer."},{"key":"1074_CR6","doi-asserted-by":"publisher","first-page":"262","DOI":"10.1287\/mnsc.44.2.262","volume":"44","author":"E Balas","year":"1998","unstructured":"Balas, E., & Vazacopoulos, A. (1998). Guided local search with shifting bottleneck for job shop scheduling. Management Science, 44, 262\u2013275.","journal-title":"Management Science"},{"issue":"3","key":"1074_CR7","first-page":"348","volume":"1","author":"AK Bardsiri","year":"2012","unstructured":"Bardsiri, A. K., & Hashemi, S. M. (2012). A review of workflow scheduling in cloud computing environment. International Journal of Computer Science and Management Research, 1(3), 348\u2013351.","journal-title":"International Journal of Computer Science and Management Research"},{"issue":"2","key":"1074_CR8","doi-asserted-by":"publisher","first-page":"268","DOI":"10.1016\/S0377-2217(02)00761-0","volume":"149","author":"K Bouleimen","year":"2003","unstructured":"Bouleimen, K., & Lecocq, H. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research, 149(2), 268\u2013281.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1074_CR9","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","volume":"112","author":"P Brucker","year":"1999","unstructured":"Brucker, P., Drexl, A., M\u00f6hring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3\u201341.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1074_CR10","doi-asserted-by":"publisher","first-page":"1899","DOI":"10.1016\/j.eswa.2009.07.024","volume":"37","author":"RM Chen","year":"2010","unstructured":"Chen, R. M., Wu, C. L., Wang, C. M., & Lo, S. T. (2010). Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB. Expert Systems with Applications, 37(3), 1899\u20131910.","journal-title":"Expert Systems with Applications"},{"issue":"5","key":"1074_CR11","doi-asserted-by":"publisher","first-page":"1031","DOI":"10.1016\/j.ins.2009.11.044","volume":"180","author":"W Chen","year":"2010","unstructured":"Chen, W., Shi, Y. J., Teng, H. F., Lan, X. P., & Hu, L. C. (2010). An efficient hybrid algorithm for resource-constrained project scheduling. Information Sciences, 180(5), 1031\u20131039.","journal-title":"Information Sciences"},{"issue":"12","key":"1074_CR12","doi-asserted-by":"publisher","first-page":"1901","DOI":"10.1177\/0954405413492966","volume":"227","author":"Y Cheng","year":"2013","unstructured":"Cheng, Y., Tao, F., Liu, Y., Zhao, D., Zhang, L., & Xu, L. (2013). Energy-aware resource service scheduling based on utility evaluation in cloud manufacturing system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 227(12), 1901\u20131915.","journal-title":"Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture"},{"key":"1074_CR13","unstructured":"Coelho, J., & Tavares, L. (2003). Comparative analysis of meta-heuristics for the resource constrained project scheduling problem. Technical Report, Department of Civil Engineering, Instituto Superior Tecnico."},{"issue":"3","key":"1074_CR14","doi-asserted-by":"publisher","first-page":"457","DOI":"10.1287\/opre.1060.0358","volume":"55","author":"D Debels","year":"2007","unstructured":"Debels, D., & Vanhoucke, M. (2007). A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem. Operations Research, 55(3), 457\u2013469.","journal-title":"Operations Research"},{"key":"1074_CR15","volume-title":"Foundations of Genetic Algorithms 2","author":"LJ Eshelman","year":"1992","unstructured":"Eshelman, L. J., & Schaffer, J. D. (1992). Real-coded genetic algorithms and interval schemata. In L. Darrel Whitley (Ed.), Foundations of Genetic Algorithms 2. San Mateo, CA: Morgan Kaufmann Publishers."},{"key":"1074_CR16","doi-asserted-by":"publisher","first-page":"890","DOI":"10.1016\/j.cor.2011.07.010","volume":"39","author":"C Fang","year":"2012","unstructured":"Fang, C., & Wang, L. (2012). An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem. Computers and Operations Research, 39, 890\u2013901.","journal-title":"Computers and Operations Research"},{"key":"1074_CR17","unstructured":"Goldberg, D. (1989). Genetic Algorithms in Search, Optimization and Machine Learning. Reading: Addison Wesley."},{"issue":"5","key":"1074_CR18","doi-asserted-by":"publisher","first-page":"467","DOI":"10.1007\/s10732-010-9142-2","volume":"17","author":"JF Gon\u00e7alves","year":"2011","unstructured":"Gon\u00e7alves, J. F., Resende, M. G., & Mendes, J. J. (2011). A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem. Journal of Heuristics, 17(5), 467\u2013486.","journal-title":"Journal of Heuristics"},{"issue":"4","key":"1074_CR19","doi-asserted-by":"publisher","first-page":"797","DOI":"10.1007\/s10845-012-0719-5","volume":"25","author":"L Gr\u00e8ze","year":"2014","unstructured":"Gr\u00e8ze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2014). CIGI2011: A heuristic method for resource-constrained project scheduling with activity overlapping. Journal of Intelligent Manufacturing, 25(4), 797\u2013811.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1074_CR20","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1002\/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C","volume":"45","author":"S Hartmann","year":"1998","unstructured":"Hartmann, S. (1998). A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics, 45(6), 733\u2013750.","journal-title":"Naval Research Logistics"},{"issue":"5","key":"1074_CR21","doi-asserted-by":"publisher","first-page":"433","DOI":"10.1002\/nav.10029","volume":"49","author":"S Hartmann","year":"2002","unstructured":"Hartmann, S. (2002). A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics, 49(5), 433\u2013448.","journal-title":"Naval Research Logistics"},{"issue":"1","key":"1074_CR22","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research, 207(1), 1\u201314.","journal-title":"European Journal of Operational Research"},{"key":"1074_CR23","volume-title":"Adaptation in Natural and Artificial Systems","author":"JH Holland","year":"1975","unstructured":"Holland, J. H. (1975). Adaptation in Natural and Artificial Systems. Ann Arbor, MA: University of Michigan."},{"issue":"9\u201312","key":"1074_CR24","doi-asserted-by":"publisher","first-page":"2627","DOI":"10.1007\/s00170-012-4679-x","volume":"67","author":"Q Jia","year":"2013","unstructured":"Jia, Q., & Seo, Y. (2013a). An improved particle swarm optimization for the resource-constrained project scheduling problem. The International Journal of Advanced Manufacturing Technology, 67(9\u201312), 2627\u20132638.","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"8","key":"1074_CR25","doi-asserted-by":"publisher","first-page":"2037","DOI":"10.1016\/j.cor.2013.02.012","volume":"40","author":"Q Jia","year":"2013","unstructured":"Jia, Q., & Seo, Y. (2013b). Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation. Computers and Operations Research, 40(8), 2037\u20132050.","journal-title":"Computers and Operations Research"},{"key":"1074_CR26","doi-asserted-by":"publisher","unstructured":"Ji, X., & Yao, K. (2014). Uncertain project scheduling problem with resource constraints. Journal of Intelligent Manufacturing. doi:\n                        10.1007\/s10845-014-0980-x\n                        \n                    .","DOI":"10.1007\/s10845-014-0980-x"},{"key":"1074_CR27","doi-asserted-by":"publisher","unstructured":"Kaur, N., Aulakh, T. S., & Cheema, R. S. (2011). Comparison of workflow scheduling algorithms in cloud computing. International Journal of Advanced Computer Science and Applications, 2(10), 81\u201386.","DOI":"10.14569\/IJACSA.2011.021013"},{"issue":"4","key":"1074_CR28","doi-asserted-by":"publisher","first-page":"737","DOI":"10.5267\/j.ijiec.2011.06.009","volume":"2","author":"M Khanzadi","year":"2011","unstructured":"Khanzadi, M., Soufipour, R., & Rostami, M. (2011). A new improved genetic algorithm approach and a competitive heuristic method for large-scale multiple resource-constrained project-scheduling problems. International Journal of Industrial Engineering Computations, 2(4), 737\u2013748.","journal-title":"International Journal of Industrial Engineering Computations"},{"issue":"4","key":"1074_CR29","first-page":"555","volume":"8","author":"B Kim","year":"2012","unstructured":"Kim, B., Youn, C. H., Park, Y. S., Lee, Y., & Choi, W. (2012). An adaptive workflow scheduling scheme based on an estimated data processing rate for next generation sequencing in cloud computing. JIPS, 8(4), 555\u2013566.","journal-title":"JIPS"},{"key":"1074_CR30","unstructured":"Kochetov, Y., & Stolyar, A. (2003). Evolutionary local search with variable neighborhood for the resource constrained project scheduling problem. In Proceedings of the 3rd International Workshop of Computer Science and Information Technologies, Russia."},{"issue":"1","key":"1074_CR31","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1002\/(SICI)1520-6750(199602)43:1<23::AID-NAV2>3.0.CO;2-P","volume":"43","author":"R Kolisch","year":"1996","unstructured":"Kolisch, R., & Drexl, A. (1996). Adaptive search for solving hard project scheduling problems. Naval Research Logistics, 43(1), 23\u201340.","journal-title":"Naval Research Logistics"},{"key":"1074_CR32","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1016\/j.ejor.2005.01.065","volume":"174","author":"R Kolisch","year":"2006","unstructured":"Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research, 174, 23\u201337.","journal-title":"European Journal of Operational Research"},{"key":"1074_CR33","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-50296-5","volume-title":"Project scheduling under resource constraints: Efficient heuristics for several problem classes","author":"R Kolisch","year":"1995","unstructured":"Kolisch, R. (1995). Project scheduling under resource constraints: Efficient heuristics for several problem classes. Heidelberg: Springer Press."},{"issue":"3","key":"1074_CR34","doi-asserted-by":"publisher","first-page":"179","DOI":"10.1016\/0272-6963(95)00032-1","volume":"14","author":"R Kolisch","year":"1996","unstructured":"Kolisch, R. (1996a). Efficient priority rules for the resource-constrained project scheduling problem. Journal of Operations Management, 14(3), 179\u2013192.","journal-title":"Journal of Operations Management"},{"issue":"2","key":"1074_CR35","doi-asserted-by":"publisher","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","volume":"90","author":"R Kolisch","year":"1996","unstructured":"Kolisch, R. (1996b). Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 90(2), 320\u2013333.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1074_CR36","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","volume":"96","author":"R Kolisch","year":"1997","unstructured":"Kolisch, R., & Sprecher, A. (1997). PSPLIB\u2014A project scheduling problem library: OR Software\u2014ORSEP operations research software exchange program. European Journal of Operational Research, 96(1), 205\u2013216.","journal-title":"European Journal of Operational Research"},{"key":"1074_CR37","unstructured":"Lee, G., Chun, B. G., & Katz, R. H. (2011). Heterogeneity-aware resource allocation and scheduling in the cloud. In Proceedings of HotCloud (pp. 1\u20135)."},{"key":"1074_CR38","doi-asserted-by":"publisher","first-page":"448","DOI":"10.1016\/j.compind.2013.02.008","volume":"64","author":"Y Laili","year":"2013","unstructured":"Laili, Y., Tao, F., Zhang, L., Cheng, Y., Luo, Y. L., & Sarker, B. R. (2013). A ranking chaos algorithm for dual scheduling of cloud service and computing resource in private cloud. Computers in Industry, 64, 448\u2013463.","journal-title":"Computers in Industry"},{"key":"1074_CR39","doi-asserted-by":"publisher","unstructured":"Laili, Y., Tao, F., Zhang, L. & Ren, L. (2011), The optimal allocation model of computing resources in cloud manufacturing system. In IEEE Seventh International Conference on Natural Computation.","DOI":"10.1109\/ICNC.2011.6022564"},{"key":"1074_CR40","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1007\/s00170-012-3939-0","volume":"63","author":"YJ Laili","year":"2012","unstructured":"Laili, Y. J., Tao, F., Zhang, L., & Sarker, B. R. (2012). A study of optimal allocation of computing resources in cloud manufacturing systems. International Journal of Advanced Manufacturing Technology, 63, 671\u2013690.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"2\u20133","key":"1074_CR41","doi-asserted-by":"publisher","first-page":"173","DOI":"10.1007\/BF01719262","volume":"17","author":"VJ Leon","year":"1995","unstructured":"Leon, V. J., & Ramamoorthy, B. (1995). Strength and adaptability of problem space based neighborhoods for resource-constrained scheduling. OR Spectrum, 17(2\u20133), 173\u2013182.","journal-title":"OR Spectrum"},{"issue":"4","key":"1074_CR42","first-page":"421","volume":"2","author":"PR Lodha","year":"2013","unstructured":"Lodha, P. R., & Wadhe, M. A. P. (2013). Study of different types of workflow scheduling algorithm in cloud computing. International Journal of Advanced Research in Computer Science and Electronics Engineering (IJARCSEE), 2(4), 421.","journal-title":"International Journal of Advanced Research in Computer Science and Electronics Engineering (IJARCSEE)"},{"issue":"1","key":"1074_CR43","doi-asserted-by":"publisher","first-page":"20","DOI":"10.5815\/ijisa.2014.01.03","volume":"6","author":"M Mehra","year":"2014","unstructured":"Mehra, M., Jayalal, M. L., Arul, A. J., Rajeswari, S., Kuriakose, K., & Satya Murty, S. A. V. (2014). Study on different crossover mechanisms of genetic algorithm for test interval optimization for nuclear power plants. International Journal of Intelligent Systems and Applications, 6(1), 20\u201328.","journal-title":"International Journal of Intelligent Systems and Applications"},{"key":"1074_CR44","doi-asserted-by":"publisher","unstructured":"Mendes, J. J., Goncalves, J. F., & Resende, M. G. C. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers and Operations Research, 36(1), 92\u2013109.","DOI":"10.1016\/j.cor.2007.07.001"},{"issue":"4","key":"1074_CR45","doi-asserted-by":"publisher","first-page":"333","DOI":"10.1109\/TEVC.2002.802450","volume":"6","author":"D Merkle","year":"2002","unstructured":"Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE Transactions on Evolutionary Computation, 6(4), 333\u2013346.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"issue":"6","key":"1074_CR46","doi-asserted-by":"publisher","first-page":"797","DOI":"10.1287\/mnsc.42.6.797","volume":"42","author":"E Nowicki","year":"1996","unstructured":"Nowicki, E., & Smutnicki, C. (1996). A fast taboo search algorithm for the job shop problem. Management Science, 42(6), 797\u2013813.","journal-title":"Management Science"},{"issue":"13","key":"1074_CR47","doi-asserted-by":"publisher","first-page":"1816","DOI":"10.1002\/cpe.3003","volume":"25","author":"M Rahman","year":"2013","unstructured":"Rahman, M., Hassan, R., Ranjan, R., & Buyya, R. (2013). Adaptive workflow scheduling for dynamic grid and cloud computing environment. Concurrency and Computation: Practice and Experience, 25(13), 1816\u20131842.","journal-title":"Concurrency and Computation: Practice and Experience"},{"key":"1074_CR48","doi-asserted-by":"publisher","first-page":"313","DOI":"10.1016\/j.amc.2007.12.025","volume":"201","author":"M Ranjbar","year":"2008","unstructured":"Ranjbar, M. (2008). Solving the resource constrained project scheduling problem using filter-and-fan approach. Applied Mathematics and Computation, 201, 313\u2013318.","journal-title":"Applied Mathematics and Computation"},{"key":"1074_CR49","doi-asserted-by":"publisher","unstructured":"Shi, Y. J., Qu, F. Z., Chen, W., & Li, B. (2010). An artificial bee colony with random key for resource-constrained project scheduling. In Life System Modeling and Intelligent Computing (pp. 148\u2013157). Springer, Berlin Heidelberg.","DOI":"10.1007\/978-3-642-15597-0_17"},{"issue":"3\u20134","key":"1074_CR50","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1023\/A:1008952024958","volume":"10","author":"LY Shue","year":"1999","unstructured":"Shue, L. Y., & Zamani, R. (1999). An intelligent search method for project scheduling problems. Journal of Intelligent Manufacturing, 10(3\u20134), 279\u2013288.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"1074_CR51","doi-asserted-by":"publisher","first-page":"2023","DOI":"10.1109\/TII.2012.2232936","volume":"9","author":"F Tao","year":"2012","unstructured":"Tao, F., Laili, Y., Xu, L., & Zhang, L. (2012). FC-PACO-RM: A parallel method for service composition optimal-selection in cloud manufacturing system. IEEE Transactions on Industrial Informatics, 9(4), 2023\u20132033.","journal-title":"IEEE Transactions on Industrial Informatics"},{"issue":"2","key":"1074_CR52","doi-asserted-by":"publisher","first-page":"495","DOI":"10.1016\/j.ejor.2006.12.033","volume":"185","author":"V Valls","year":"2008","unstructured":"Valls, V., Ballestin, F., & Quintanilla, S. (2008). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 185(2), 495\u2013508.","journal-title":"European Journal of Operational Research"},{"key":"1074_CR53","doi-asserted-by":"publisher","unstructured":"Varalakshmi, P., Ramaswamy, A., Balasubramanian, A., & Vijaykumar, P. (2011). An optimal workflow based scheduling and resource allocation in cloud. In Advances in Computing and Communications (pp. 411\u2013420). Springer, Berlin Heidelberg.","DOI":"10.1007\/978-3-642-22709-7_41"},{"key":"1074_CR54","unstructured":"Wall B. W. (1996). A Genetic Algorithm for Resource Constrained Scheduling, PhD Thesis, Department of Mechanical Engineering, Massachusetts Institute of Technology, USA."},{"issue":"4","key":"1074_CR55","doi-asserted-by":"publisher","first-page":"564","DOI":"10.1016\/j.jmsy.2013.04.008","volume":"32","author":"D Wu","year":"2013","unstructured":"Wu, D., Greer, M. J., Rosen, D. W., & Schaefer, D. (2013). Cloud manufacturing: Strategic vision and state-of-the-art. Journal of Manufacturing System, 32(4), 564\u2013579.","journal-title":"Journal of Manufacturing System"},{"key":"1074_CR56","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1007\/978-3-642-16066-0_36","volume-title":"Cooperative Design, Visualization and Engineering","author":"L Wu","year":"2010","unstructured":"Wu, L., & Yang, C. (2010). A solution of manufacturing resources sharing in cloud computing environment. Cooperative Design, Visualization and Engineering (pp. 247\u2013252). Berlin Heidelberg: Springer."},{"key":"1074_CR57","doi-asserted-by":"publisher","unstructured":"Yassa, S., Chelouah, R., Kadima, H., & Granado, B. (2013). Multi-objective approach for energy-aware workflow scheduling in cloud computing environments. The Scientific World Journal.","DOI":"10.1155\/2013\/350934"},{"key":"1074_CR58","doi-asserted-by":"publisher","unstructured":"Zhang, Q., Zhu, Q., & Boutaba, R. (2011). Dynamic resource allocation for spot markets in cloud computing environments. In Utility and Cloud Computing (UCC), 2011 Fourth IEEE International Conference on IEEE (pp. 178\u2013185).","DOI":"10.1109\/UCC.2011.33"},{"issue":"2","key":"1074_CR59","doi-asserted-by":"publisher","first-page":"552","DOI":"10.1016\/j.ejor.2013.03.005","volume":"229","author":"R Zamani","year":"2013","unstructured":"Zamani, R. (2013). A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. European Journal of Operational Research, 229(2), 552\u2013559.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"1074_CR60","doi-asserted-by":"publisher","first-page":"3720","DOI":"10.1016\/j.asoc.2011.02.002","volume":"11","author":"K Ziarati","year":"2011","unstructured":"Ziarati, K., Akbari, R., & Zeighami, V. (2011). On the performance of bee algorithms for resource-constrained project scheduling problem. Applied Soft Computing, 11(4), 3720\u20133733.","journal-title":"Applied Soft Computing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1074-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-015-1074-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1074-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1074-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:12:06Z","timestamp":1559268726000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-015-1074-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,4,8]]},"references-count":60,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2017,6]]}},"alternative-id":["1074"],"URL":"https:\/\/doi.org\/10.1007\/s10845-015-1074-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,4,8]]}}}