{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,14]],"date-time":"2026-07-14T10:51:55Z","timestamp":1784026315116,"version":"3.55.0"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"8","license":[{"start":{"date-parts":[[2015,4,29]],"date-time":"2015-04-29T00:00:00Z","timestamp":1430265600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1007\/s10845-015-1082-0","type":"journal-article","created":{"date-parts":[[2015,4,28]],"date-time":"2015-04-28T12:21:30Z","timestamp":1430223690000},"page":"1961-1972","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":72,"title":["A hybrid discrete particle swarm optimization for dual-resource constrained job shop scheduling with resource flexibility"],"prefix":"10.1007","volume":"28","author":[{"given":"Jing","family":"Zhang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Wanliang","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xinli","family":"Xu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,4,29]]},"reference":[{"issue":"9\u201312","key":"1082_CR1","doi-asserted-by":"crossref","first-page":"1955","DOI":"10.1007\/s00170-013-5354-6","volume":"70","author":"MA Adibi","year":"2014","unstructured":"Adibi, M. A., & Shahrabi, J. (2014). A clustering-based modified variable neighborhood search algorithm for a dynamic job shop scheduling problem. International Journal of Advanced Manufacturing Technology, 70(9\u201312), 1955\u20131961.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"1082_CR2","doi-asserted-by":"publisher","unstructured":"AitZai, A., Benmedjdoub, B., & Boudhar, M. (2014). Branch-and-bound and PSO algorithms for no-wait job shop scheduling. Journal of Intelligent Manufacturing. doi:\n                        10.1007\/s10845-014-0906-7","DOI":"10.1007\/s10845-014-0906-7"},{"key":"1082_CR3","unstructured":"Cao, X. Z., & Yang, Z. H. (2011). An improved genetic algorithm for dual-resource constrained flexible job shop scheduling. In International conference on intelligent computation technology and automation, Shen Zhen."},{"issue":"3","key":"1082_CR4","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1109\/TEVC.2004.826067","volume":"8","author":"CAC Coello","year":"2004","unstructured":"Coello, C. A. C., Pulido, G. T., & Lechuga, M. S. (2004). Handling multiple objectives with particle swarm optimization. IEEE Transactions on Evolutionary Computation, 8(3), 256\u2013279.","journal-title":"IEEE Transactions on Evolutionary Computation"},{"issue":"1","key":"1082_CR5","first-page":"369","volume":"48","author":"H ElMaraghy","year":"1999","unstructured":"ElMaraghy, H., Patel, V., & Ben Abdallah, I. (1999). A genetic algorithm based approach for scheduling of dual-resource constrainded manufacturing systems. Journal of Manufacturing Systems, 48(1), 369\u2013372.","journal-title":"Journal of Manufacturing Systems"},{"issue":"3","key":"1082_CR6","doi-asserted-by":"crossref","first-page":"186","DOI":"10.1016\/S0278-6125(00)80011-4","volume":"19","author":"H ElMaraghy","year":"2000","unstructured":"ElMaraghy, H., Patel, V., & Ben Abdallah, I. (2000). Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms. Journal of Manufacturing Systems, 19(3), 186\u2013201.","journal-title":"Journal of Manufacturing Systems"},{"issue":"34","key":"1082_CR7","doi-asserted-by":"crossref","first-page":"2077","DOI":"10.1080\/00207549608905015","volume":"8","author":"VB Gargeya","year":"1996","unstructured":"Gargeya, V. B., & Deane, R. H. (1996). Scheduling research in multiple resource constrained job shop: A review and critique. International Journal of Production Research, 8(34), 2077\u20132097.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"1082_CR8","doi-asserted-by":"crossref","first-page":"741","DOI":"10.1007\/s10845-011-0622-5","volume":"24","author":"M Gonz\u00e1lez","year":"2013","unstructured":"Gonz\u00e1lez, M., Vela, C., Gonz\u00e1lez-Rodr\u00edguez, I., & Varela, R. (2013). Lateness minimization with Tabu search for job shop scheduling problem with sequence dependent setup times. Journal of Intelligent Manufacturing, 24(4), 741\u2013754.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1082_CR9","first-page":"1424","volume":"12","author":"QY Ju","year":"2006","unstructured":"Ju, Q. Y., & Zhu, J. Y. (2006). Study of fuzzy job shop scheduling problems with dualresource and multi-process routes. Mechanical Science and Technology, 12, 1424\u20131427.","journal-title":"Mechanical Science and Technology"},{"issue":"1","key":"1082_CR10","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TSMCC.2002.1009117","volume":"32","author":"I Kacem","year":"2002","unstructured":"Kacem, I., & Hammadi, S. (2002). Approach by localization and multi-objective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transaction on Systems, Man, and Cybernetics Part C: Applications and Reviews, 32(1), 1\u201313.","journal-title":"IEEE Transaction on Systems, Man, and Cybernetics Part C: Applications and Reviews"},{"issue":"1","key":"1082_CR11","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1007\/s10845-012-0675-0","volume":"25","author":"D Katherasan","year":"2014","unstructured":"Katherasan, D., Elias, J., Sathiya, P., & Haq, A. N. (2014). Simulation and parameter optimization of flux cored arc welding using artificial neural network and particle swarm optimization algorithm. Journal of Intelligent Manufacturing, 25(1), 67\u201376.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1082_CR12","doi-asserted-by":"crossref","unstructured":"Kennedy, J., & Eberhart, R. (1995). Particle swarm optimization. In Proceedings of the 4th IEEE international conference on neural networks, Piscataway.","DOI":"10.1109\/ICNN.1995.488968"},{"issue":"4598","key":"1082_CR13","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220(4598), 671\u2013680.","journal-title":"Science"},{"issue":"10","key":"1082_CR14","doi-asserted-by":"crossref","first-page":"2995","DOI":"10.1080\/00207540902814348","volume":"48","author":"DM Lei","year":"2010","unstructured":"Lei, D. M. (2010). A genetic algorithm for flexible job shop scheduling with fuzzy processing time. International Journal of Production Research, 48(10), 2995\u20133013.","journal-title":"International Journal of Production Research"},{"issue":"9","key":"1082_CR15","doi-asserted-by":"crossref","first-page":"2519","DOI":"10.1080\/00207543.2013.849822","volume":"52","author":"DM Lei","year":"2014","unstructured":"Lei, D. M., & Guo, X. P. (2014). Variable neighbourhood search for dual-resource constrained flexible job shop scheduling. International Journal of Production Research, 52(9), 2519\u20132529.","journal-title":"International Journal of Production Research"},{"key":"1082_CR16","doi-asserted-by":"crossref","unstructured":"Li, J. Y., Sun, S. D., Huang, Y., & Wang, N. (2010). Research into self-adaptive hybrid ant colony algorithm based on flow control. In The 2nd international workshop on intelligent systems and applications, Wuhan.","DOI":"10.1109\/IWISA.2010.5473446"},{"issue":"5\u20138","key":"1082_CR17","first-page":"683","volume":"52","author":"JQ Li","year":"2011","unstructured":"Li, J. Q., Pan, Q. K., Suganthan, P. N., & Chua, T. J. (2011). A hybrid tabu search algorithm with an efficient neighborhood structure for the flexible job shop scheduling problem. International Journal of Advanced Manufacturing Technology, 52(5\u20138), 683\u2013697.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"4","key":"1082_CR18","first-page":"584","volume":"6","author":"JY Li","year":"2011","unstructured":"Li, J. Y., Sun, S. D., & Huang, Y. (2011). Adaptive hybrid ant colony optimization for solving dual resource constrained job shop scheduling problem. Journal of Software, 6(4), 584\u2013594.","journal-title":"Journal of Software"},{"key":"1082_CR19","doi-asserted-by":"crossref","unstructured":"Liang, D., & Tao, Z. (2011). Hybrid genetic-Tabu Search approach to scheduling optimization for dual-resource constrained job shop. In Cross strait quad-regional radio science and wireless technology conference, Harbin.","DOI":"10.1109\/CSQRWC.2011.6037292"},{"issue":"3","key":"1082_CR20","doi-asserted-by":"crossref","first-page":"2629","DOI":"10.1016\/j.eswa.2009.08.015","volume":"37","author":"T-L Lin","year":"2010","unstructured":"Lin, T.-L., Horng, S.-J., Kao, T.-W., Chen, Y.-H., Run, R.-S., Chen, R.-J., et al. (2010). An efficient job-shop scheduling algorithm based on particle swarm optimization. Expert Systems with Applications, 37(3), 2629\u20132636.","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"1082_CR21","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1016\/j.ijpe.2010.08.004","volume":"129","author":"G Moslehi","year":"2011","unstructured":"Moslehi, G., & Mahnam, M. (2011). A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search. International Journal of Production Economics, 129(1), 14\u201322.","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"1082_CR22","doi-asserted-by":"crossref","first-page":"763","DOI":"10.1007\/s10845-012-0626-9","volume":"24","author":"L Nie","year":"2013","unstructured":"Nie, L., Gao, L., Li, P., & Li, X. (2013). A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates. Journal of Intelligent Manufacturing, 24(4), 763\u2013774.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"9","key":"1082_CR23","doi-asserted-by":"crossref","first-page":"2807","DOI":"10.1016\/j.cor.2006.12.030","volume":"35","author":"QK Pan","year":"2008","unstructured":"Pan, Q. K., Tasgetiren, M. F., & Liang, Y. C. (2008). A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem. Computers & Operations Research, 35(9), 2807\u20132839.","journal-title":"Computers & Operations Research"},{"key":"1082_CR24","doi-asserted-by":"publisher","unstructured":"P\u00e9rez, M. F., & Raupp, F. P. (2014). A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem. Journal of Intelligent Manufacturing. doi:\n                        10.1007\/s10845-014-0872-0","DOI":"10.1007\/s10845-014-0872-0"},{"issue":"10","key":"1082_CR25","doi-asserted-by":"crossref","first-page":"3202","DOI":"10.1016\/j.cor.2007.02.014","volume":"35","author":"F Pezzella","year":"2008","unstructured":"Pezzella, F., Morganti, G., & Ciaschetti, G. (2008). A genetic algorithm for the flexible job-shop scheduling problem. Computers & Operations Research, 35(10), 3202\u20133212.","journal-title":"Computers & Operations Research"},{"issue":"3","key":"1082_CR26","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1007\/s10845-012-0701-2","volume":"25","author":"X Qiu","year":"2014","unstructured":"Qiu, X., & Lau, H. K. (2014). An AIS-based hybrid algorithm for static job shop scheduling problem. Journal of Intelligent Manufacturing, 25(3), 489\u2013503.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"1082_CR27","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1007\/s10845-011-0552-2","volume":"24","author":"G Vijay Chakaravarthy","year":"2013","unstructured":"Vijay Chakaravarthy, G., Marimuthu, S., & Naveen Sait, A. (2013). Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Intelligent Manufacturing, 24(1), 175\u2013191.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1\u20134","key":"1082_CR28","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1007\/s00170-011-3610-1","volume":"60","author":"L Wang","year":"2012","unstructured":"Wang, L., Zhou, G., Xu, Y., Wang, S. Y., & Liu, M. (2012). An effective artificial bee colony algorithm for the flexible job-shop scheduling problem. International Journal of Advanced Manufacturing Technology, 60(1\u20134), 303\u2013315.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"1082_CR29","volume-title":"Orthogonal experiment","author":"BZ Xia","year":"1985","unstructured":"Xia, B. Z. (1985). Orthogonal experiment. Changchun: Jilin People Publishing House."},{"issue":"2","key":"1082_CR30","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1016\/j.cie.2005.01.018","volume":"48","author":"WJ Xia","year":"2005","unstructured":"Xia, W. J., & Wu, Z. M. (2005). An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems. Computers & Industrial Engineering, 48(2), 409\u2013425.","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"1082_CR31","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/j.ejor.2011.03.004","volume":"215","author":"J Xu","year":"2011","unstructured":"Xu, J., Xu, X., & Xie, S. Q. (2011). Recent developments in dual resource constrained (DRC) system research. European Journal of Operational Research, 215(2), 309\u2013318.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1082_CR32","doi-asserted-by":"crossref","first-page":"678","DOI":"10.1016\/j.eswa.2009.06.007","volume":"37","author":"M Yazdani","year":"2010","unstructured":"Yazdani, M., Amiri, M., & Zandieh, M. (2010). Flexible job-shop scheduling with parallel variable neighborhood search algorithm. Expert Systems with Applications, 37(1), 678\u2013687.","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"1082_CR33","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1016\/j.ijproman.2005.06.006","volume":"24","author":"H Zhang","year":"2006","unstructured":"Zhang, H., Li, H., & Tam, C. M. (2006). Particle swarm optimization for resource-constrained project scheduling. International Journal of Project Management, 24(1), 83\u201392.","journal-title":"International Journal of Project Management"},{"issue":"7","key":"1082_CR34","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1080\/03052150903369845","volume":"42","author":"R Zhang","year":"2010","unstructured":"Zhang, R., & Wu, C. (2010). A divide-and-conquer strategy with particle swarm optimization for the job shop scheduling problem. Engineering Optmization, 42(7), 641\u2013670.","journal-title":"Engineering Optmization"},{"issue":"6","key":"1082_CR35","first-page":"715","volume":"29","author":"J Zhang","year":"2012","unstructured":"Zhang, J., Wang, W. L., & Xu, X. L. (2012). Hybrid particle-swarm optimization for multi-objective flexible job-shop scheduling problem. Control Theory & Applications, 29(6), 715\u2013722.","journal-title":"Control Theory & Applications"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1082-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-015-1082-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1082-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1082-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:18:54Z","timestamp":1559269134000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-015-1082-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,4,29]]},"references-count":35,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2017,12]]}},"alternative-id":["1082"],"URL":"https:\/\/doi.org\/10.1007\/s10845-015-1082-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,4,29]]}}}