{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,27]],"date-time":"2025-10-27T21:05:41Z","timestamp":1761599141444},"reference-count":21,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2015,5,10]],"date-time":"2015-05-10T00:00:00Z","timestamp":1431216000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2018,3]]},"DOI":"10.1007\/s10845-015-1086-9","type":"journal-article","created":{"date-parts":[[2015,5,9]],"date-time":"2015-05-09T15:33:32Z","timestamp":1431185612000},"page":"651-657","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["A two-phase approach to solve the synchronized bin\u2013forklift scheduling problem"],"prefix":"10.1007","volume":"29","author":[{"given":"Nizar","family":"El Hachemi","sequence":"first","affiliation":[]},{"given":"Mohammed","family":"Saddoune","sequence":"additional","affiliation":[]},{"given":"Issmail","family":"El Hallaoui","sequence":"additional","affiliation":[]},{"given":"Louis-Martin","family":"Rousseau","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,5,10]]},"reference":[{"key":"1086_CR1","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1016\/j.simpat.2014.04.002","volume":"45","author":"Brahmadeep","year":"2014","unstructured":"Brahmadeep, & Thomassey, S. (2014). A simulation based comparison: Manual and automatic distribution setup in a textile yarn rewinding unit of a yarn dyeing factory. Simulation Modelling Practice and Theory, 45, 80\u201390.","journal-title":"Simulation Modelling Practice and Theory"},{"issue":"2","key":"1086_CR2","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1023\/A:1008947018074","volume":"11","author":"G Bruno","year":"2000","unstructured":"Bruno, G., Ghiani, G., & Improta, G. (2000). Dynamic positioning of idle automated guided vehicles. Journal of Intelligent Manufacturing, 11(2), 209\u2013215.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1086_CR3","unstructured":"Cho, E. (2004). Scheduling supply chains with batchwise fabric dyeing operations. Ph.D. thesis, North Carolina State University."},{"key":"1086_CR4","doi-asserted-by":"crossref","unstructured":"Confessore, G., Fabiano, M., & Liotta, G. (2011). A network flow based heuristic approach for optimizing AGV movements. Journal of Intelligent Manufacturing, 24(2), 405\u2013419.","DOI":"10.1007\/s10845-011-0612-7"},{"key":"1086_CR5","doi-asserted-by":"crossref","unstructured":"Desrosiers, J., Dumas, Y., Solomon, M. & Soumis, F. (1995). Time constrained routing and scheduling. In M. Ball, et al. (Eds.), Network Routing, Handbooks of Operations Research and Management Science (Chap. 2, Vol. 8, pp. 35\u2013139). Elsevier Science B.V.","DOI":"10.1016\/S0927-0507(05)80106-9"},{"key":"1086_CR6","unstructured":"El Hachemi, N., Saddoune, M., El Hallaoui, I., & Rousseau, L.-M. (2013). Production scheduling and routing problem in the textile industry. In Industrial engineering and systems management (2013), Proceedings of international industrial engineering and systems management conference."},{"issue":"1","key":"1086_CR7","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1023\/B:JIMS.0000010077.27141.be","volume":"15","author":"T Felix","year":"2004","unstructured":"Felix, T., Chan, S., & Chan, H. K. (2004). A comprehensive survey and future trend of simulation study on FMS scheduling. Journal of Intelligent Manufacturing, 15(1), 87\u2013102.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1086_CR8","unstructured":"Giralt, G., & Chatila, R. (1987). Task programming and motion control for autonomous mobile robots in manufacturing. In IEEE international conference in robotics automation (1987)."},{"issue":"3","key":"1086_CR9","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/BF00118081","volume":"7","author":"G Hao","year":"1996","unstructured":"Hao, G., Shang, J. S., & Vargas, L. G. (1996). A neural network model for the free-ranging AGV route-planning problem. Journal of Intelligent Manufacturing, 7(3), 217\u2013227.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1086_CR10","doi-asserted-by":"crossref","first-page":"458","DOI":"10.1108\/01439910010378879","volume":"27","author":"H Hu","year":"2000","unstructured":"Hu, H., & Gu, D. (2000). Landmark-based navigation of industrial mobile robots. International Journal of Industry Robots, 27(6), 458\u2013467.","journal-title":"International Journal of Industry Robots"},{"issue":"5","key":"1086_CR11","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1533\/joti.2006.0145","volume":"97","author":"P Laoboonlur","year":"2006","unstructured":"Laoboonlur, P., Hodgson, T. J., & Thoney, K. A. (2006). Production scheduling in a knitted dyeing and finishing process. Journal of the Textile Institute, 97(5), 391\u2013399.","journal-title":"Journal of the Textile Institute"},{"issue":"4","key":"1086_CR12","doi-asserted-by":"crossref","first-page":"465","DOI":"10.1007\/s10845-005-0019-4","volume":"17","author":"L Lin","year":"2006","unstructured":"Lin, L., Shinn, S. W., Gen, M., & Hwang, H. (2006). Network model and effective evolutionary approach for AGV dispatching in manufacturing system. Journal of Intelligent Manufacturing, 17(4), 465\u2013477.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1086_CR13","first-page":"359","volume":"116","author":"F Maldonado","year":"2000","unstructured":"Maldonado, F., Ciurlizza, A., Radillo, R., & Ponce, E. (2000). Optimisation of the colour sequence in the dyeing process: Industrial applications. JSDC, 116, 359\u2013362.","journal-title":"JSDC"},{"key":"1086_CR14","doi-asserted-by":"crossref","first-page":"361","DOI":"10.1111\/j.1478-4408.1996.tb01774.x","volume":"112","author":"L Morales","year":"1996","unstructured":"Morales, L., Maldonado, F., Radillo, R., & Ciurlizza, A. (1996). Optimisation of colour sequence in the process of fabric dyeing. JSDC, 112, 361\u2013363.","journal-title":"JSDC"},{"key":"1086_CR15","unstructured":"Nara Lace Co., Ltd. (2003). Dye manufacturer chooses Asprova for high speed scheduling process and user-friendly GUI environment."},{"issue":"5","key":"1086_CR16","doi-asserted-by":"crossref","first-page":"461","DOI":"10.1023\/A:1008970213581","volume":"11","author":"JF O\u2019Kane","year":"2000","unstructured":"O\u2019Kane, J. F. (2000). A knowledge-based system for reactive scheduling decision-making in FMS. Journal of Intelligent Manufacturing, 11(5), 461\u2013474.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"9","key":"1086_CR17","doi-asserted-by":"crossref","first-page":"1054","DOI":"10.1108\/01443570210440537","volume":"22","author":"C Saydam","year":"2002","unstructured":"Saydam, C., & Cooper, W. D. (2002). A decision support system for scheduling jobs on multi-port dyeing machines. International Journal of Operations & Production Management, 22(9), 1054\u20131065.","journal-title":"International Journal of Operations & Production Management"},{"issue":"2","key":"1086_CR18","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s10845-009-0283-9","volume":"22","author":"N Singh","year":"2009","unstructured":"Singh, N., Sarngadharan, P. V., & Pal, P. K. (2009). AGV scheduling for automated material distribution: A case study. Journal of Intelligent Manufacturing, 22(2), 219\u2013228.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1086_CR19","unstructured":"Toth, P., & Vigo, D. (2001). The vehicle routing problem. Philadelphia: Society for Industrial and Applied Mathematics."},{"key":"1086_CR20","doi-asserted-by":"crossref","first-page":"677","DOI":"10.1016\/j.ejor.2004.09.020","volume":"170","author":"IFA Vis","year":"2006","unstructured":"Vis, I. F. A. (2006). Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research, 170, 677\u2013709.","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"1086_CR21","first-page":"1877","volume":"61","author":"X Zhou","year":"2010","unstructured":"Zhou, X., Chen, C., Wu, P., & Zheng, J. (2010). Optimized scheduling of production process based on continuous-time in printing and dyeing industry. CIESC Journal, 61(8), 1877\u20131881.","journal-title":"CIESC Journal"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1086-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-015-1086-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1086-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-015-1086-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,24]],"date-time":"2019-08-24T21:46:03Z","timestamp":1566683163000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-015-1086-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5,10]]},"references-count":21,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2018,3]]}},"alternative-id":["1086"],"URL":"https:\/\/doi.org\/10.1007\/s10845-015-1086-9","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,5,10]]}}}