{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,14]],"date-time":"2025-11-14T17:21:08Z","timestamp":1763140868861},"reference-count":41,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2016,6,2]],"date-time":"2016-06-02T00:00:00Z","timestamp":1464825600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2019,1]]},"DOI":"10.1007\/s10845-016-1223-0","type":"journal-article","created":{"date-parts":[[2016,6,2]],"date-time":"2016-06-02T09:57:15Z","timestamp":1464861435000},"page":"33-45","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":18,"title":["Makespan minimization for batching work and rework process on a single facility with an aging effect: a hybrid meta-heuristic algorithm for sustainable production management"],"prefix":"10.1007","volume":"30","author":[{"given":"A.","family":"Beynaghi","sequence":"first","affiliation":[]},{"given":"F.","family":"Moztarzadeh","sequence":"additional","affiliation":[]},{"given":"A.","family":"Shahmardan","sequence":"additional","affiliation":[]},{"given":"R.","family":"Alizadeh","sequence":"additional","affiliation":[]},{"given":"J.","family":"Salimi","sequence":"additional","affiliation":[]},{"given":"M.","family":"Mozafari","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,6,2]]},"reference":[{"issue":"7","key":"1223_CR1","doi-asserted-by":"publisher","first-page":"711","DOI":"10.1057\/palgrave.jors.2600740","volume":"50","author":"B Alidaee","year":"1999","unstructured":"Alidaee, B., & Womer, N. K. (1999). Scheduling with time dependent processing times: Review and extensions. Journal of the Operational Research Society, 50(7), 711\u2013720.","journal-title":"Journal of the Operational Research Society"},{"issue":"4","key":"1223_CR2","doi-asserted-by":"publisher","first-page":"695","DOI":"10.1007\/s10845-011-0616-3","volume":"24","author":"A Arab","year":"2013","unstructured":"Arab, A., Ismail, N., & Lee, L. S. (2013). Maintenance scheduling incorporating dynamics of production system and real-time information from workstations. Journal of Intelligent Manufacturing, 24(4), 695\u2013705.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"1223_CR3","doi-asserted-by":"publisher","first-page":"355","DOI":"10.1007\/s001860000088","volume":"52","author":"P Baptiste","year":"2000","unstructured":"Baptiste, P. (2000). Batching identical jobs. Mathematical Methods of Operations Research, 52(3), 355\u2013367.","journal-title":"Mathematical Methods of Operations Research"},{"issue":"4","key":"1223_CR4","doi-asserted-by":"publisher","first-page":"775","DOI":"10.1007\/s10845-012-0627-8","volume":"24","author":"F Belmecheri","year":"2013","unstructured":"Belmecheri, F., Prins, C., Yalaoui, F., & Amodeo, L. (2013). Particle swarm optimization algorithm for a vehicle routing problem with heterogeneous fleet, mixed backhauls, and time windows. Journal of Intelligent Manufacturing, 24(4), 775\u2013789.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"1223_CR5","doi-asserted-by":"publisher","first-page":"315","DOI":"10.1016\/j.ejor.2007.05.040","volume":"188","author":"D Biskup","year":"2008","unstructured":"Biskup, D. (2008). A state-of-the-art review on scheduling with learning effects. European Journal of Operational Research, 188(2), 315\u2013329.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"1223_CR6","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"TCE Cheng","year":"2004","unstructured":"Cheng, T. C. E., Ding, Q., & Lin, B. M. T. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152(1), 1\u201313.","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"1223_CR7","doi-asserted-by":"publisher","first-page":"767","DOI":"10.1007\/s10845-009-0272-z","volume":"22","author":"P Damodaran","year":"2011","unstructured":"Damodaran, P., V\u00e9lez-Gallego, M. C., & Maya, J. (2011). A GRASP approach for makespan minimization on parallel batch processing machines. Journal of Intelligent Manufacturing, 22(5), 767\u2013777.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1223_CR8","doi-asserted-by":"crossref","unstructured":"Fan, J., & Xu, D. (2010). Some single-machine scheduling problems with aging effect. In IEEE international conference on service operations and logistics and informatics (SOLI), (pp. 430\u2013431). IEEE.","DOI":"10.1109\/SOLI.2010.5551540"},{"key":"1223_CR9","volume-title":"Genetic algorithms in search, optimization, and machine learning","author":"DE Goldberg","year":"1989","unstructured":"Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning. Boston: Addison-Wesley."},{"issue":"7","key":"1223_CR10","doi-asserted-by":"publisher","first-page":"845","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#","volume":"46","author":"GH Graves","year":"1999","unstructured":"Graves, G. H., & Lee, C. Y. (1999). Scheduling maintenance and semiresumable jobs on a single machine. Naval Research Logistics, 46(7), 845\u2013863.","journal-title":"Naval Research Logistics"},{"issue":"6","key":"1223_CR11","doi-asserted-by":"publisher","first-page":"522","DOI":"10.1016\/j.omega.2010.01.002","volume":"38","author":"IV Gribkovskaia","year":"2010","unstructured":"Gribkovskaia, I. V., Kovalev, S., & Werner, F. (2010). Batching for work and rework processes on dedicated facilities to minimize the makespan. Omega, 38(6), 522\u2013527.","journal-title":"Omega"},{"issue":"11","key":"1223_CR12","doi-asserted-by":"publisher","first-page":"3929","DOI":"10.1016\/j.amc.2009.11.040","volume":"215","author":"CJ Hsu","year":"2010","unstructured":"Hsu, C. J., Low, C., & Su, C. T. (2010). A single-machine scheduling problem with maintenance activities to minimize makespan. Applied Mathematics and Computation, 215(11), 3929\u20133935.","journal-title":"Applied Mathematics and Computation"},{"issue":"6","key":"1223_CR13","doi-asserted-by":"publisher","first-page":"1595","DOI":"10.1016\/j.cor.2004.11.009","volume":"33","author":"K Inderfurth","year":"2006","unstructured":"Inderfurth, K., Janiak, A., Kovalyov, M. Y., & Werner, F. (2006). Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research, 33(6), 1595\u20131605.","journal-title":"Computers and Operations Research"},{"issue":"3","key":"1223_CR14","doi-asserted-by":"publisher","first-page":"949","DOI":"10.1016\/j.cie.2009.03.012","volume":"57","author":"F Jabbarizadeh","year":"2009","unstructured":"Jabbarizadeh, F., Zandieh, M., & Talebi, D. (2009). Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints. Computers and Industrial Engineering, 57(3), 949\u2013957.","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"1223_CR15","doi-asserted-by":"publisher","first-page":"247","DOI":"10.1007\/s10845-009-0285-7","volume":"22","author":"F Jolai","year":"2011","unstructured":"Jolai, F., Amalnick, M. S., Alinaghian, M., Shakhsi-Niaei, M., & Omrani, H. (2011). A hybrid memetic algorithm for maximizing the weighted number of just-in-time jobs on unrelated parallel machines. Journal of Intelligent Manufacturing, 22(2), 247\u2013261.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1223_CR16","doi-asserted-by":"publisher","unstructured":"Khatami, M., & Zegordi, S. H. (2014). Coordinative production and maintenance scheduling problem with flexible maintenance time intervals. Journal of Intelligent Manufacturing. doi:\n                    10.1007\/s10845-014-1001-9\n                    \n                  .","DOI":"10.1007\/s10845-014-1001-9"},{"key":"1223_CR17","doi-asserted-by":"publisher","first-page":"671","DOI":"10.1126\/science.220.4598.671","volume":"220","author":"S Kirkpatrick","year":"1983","unstructured":"Kirkpatrick, S., Gelatt, C. D, Jr., & Vecchi, M. P. (1983). Optimization by simulated annealing. Science, 220, 671\u2013680.","journal-title":"Science"},{"issue":"3","key":"1223_CR18","doi-asserted-by":"publisher","first-page":"416","DOI":"10.1057\/palgrave.jors.2602363","volume":"59","author":"WH Kuo","year":"2008","unstructured":"Kuo, W. H., & Yang, D. L. (2008). Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect. Journal of the Operational Research Society, 59(3), 416\u2013420.","journal-title":"Journal of the Operational Research Society"},{"key":"1223_CR19","unstructured":"Lai, P.-J., & Wu, H.-C. (2013). Using heuristic algorithms to solve the scheduling problems with job-dependent and machine-dependent learning effects. Journal of Intelligent Manufacturing, 26, 1\u201311."},{"issue":"3","key":"1223_CR20","doi-asserted-by":"publisher","first-page":"688","DOI":"10.1016\/j.cie.2011.12.021","volume":"62","author":"X Li","year":"2012","unstructured":"Li, X., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers & Industrial Engineering, 62(3), 688\u2013692.","journal-title":"Computers & Industrial Engineering"},{"key":"1223_CR21","volume-title":"An optimal lot and batch size policy for a single item produced and remanufactured on one machine","author":"G Lindner","year":"2001","unstructured":"Lindner, G., Flapper, S. D. P., & Buscher, U. (2001). An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Magdeburg: FEMM, Otto-von-Guericke-Univ."},{"issue":"11","key":"1223_CR22","doi-asserted-by":"publisher","first-page":"1097","DOI":"10.1016\/S0305-0548(97)00031-2","volume":"24","author":"N Mladenovi\u2019c","year":"1997","unstructured":"Mladenovi\u2019c, N., & Hansen, P. (1997). Variable neighborhood search. Computers and Operations Research, 24(11), 1097\u20131100.","journal-title":"Computers and Operations Research"},{"key":"1223_CR23","doi-asserted-by":"publisher","unstructured":"Mokhtari, H., & Noroozi, A. (2015). An efficient chaotic based PSO for earliness\/tardiness optimization in a batch processing flow shop scheduling problem. Journal of Intelligent Manufacturing. doi:\n                    10.1007\/s10845-015-1158-x\n                    \n                  .","DOI":"10.1007\/s10845-015-1158-x"},{"key":"1223_CR24","doi-asserted-by":"crossref","unstructured":"Mosheiov, G. (1994). Scheduling jobs under simple linear deterioration. Computers & Operations Research, 21(6), 653\u2013659.","DOI":"10.1016\/0305-0548(94)90080-9"},{"issue":"3","key":"1223_CR25","doi-asserted-by":"publisher","first-page":"687","DOI":"10.1016\/S0377-2217(00)00175-2","volume":"132","author":"G Mosheiov","year":"2001","unstructured":"Mosheiov, G. (2001). Scheduling problems with a learning effect. European Journal of Operational Research, 132(3), 687\u2013693.","journal-title":"European Journal of Operational Research"},{"issue":"14","key":"1223_CR26","doi-asserted-by":"publisher","first-page":"3191","DOI":"10.1080\/00207540600711853","volume":"45","author":"D Ojha","year":"2007","unstructured":"Ojha, D., Sarker, B. R., & Biswas, P. (2007). An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45(14), 3191\u20133214.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"1223_CR27","doi-asserted-by":"publisher","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"CN Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: A review. European Journal of Operational Research, 120(2), 228\u2013249.","journal-title":"European Journal of Operational Research"},{"key":"1223_CR28","unstructured":"Ramezani, P., Rabiee, M., & Jolai, F. (2013). No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup time: A hybrid meta-heuristic approach. Journal of Intelligent Manufacturing, 26, 1\u201314."},{"issue":"1","key":"1223_CR29","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","volume":"121","author":"G Schmidt","year":"2000","unstructured":"Schmidt, G. (2000). Scheduling with limited machine availability. European Journal of Operational Research, 121(1), 1\u201315.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"1223_CR30","doi-asserted-by":"publisher","first-page":"830","DOI":"10.1016\/j.cie.2010.08.010","volume":"59","author":"M Solimanpur","year":"2010","unstructured":"Solimanpur, M., & Kamran, M. A. (2010). Solving facilities location problem in the presence of alternative processing routes using a genetic algorithm. Computers & Industrial Engineering, 59(4), 830\u2013839.","journal-title":"Computers & Industrial Engineering"},{"issue":"8","key":"1223_CR31","doi-asserted-by":"publisher","first-page":"733","DOI":"10.1080\/0951192X.2013.834465","volume":"27","author":"M Tayebi Araghi","year":"2014","unstructured":"Tayebi Araghi, M., Jolai, F., & Rabiee, M. (2014). Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach. International Journal of Computer Integrated Manufacturing, 27(8), 733\u2013746.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"4","key":"1223_CR32","doi-asserted-by":"publisher","first-page":"1127","DOI":"10.1007\/s10845-010-0395-2","volume":"23","author":"R Tavakkoli-Moghaddam","year":"2012","unstructured":"Tavakkoli-Moghaddam, R., Ranjbar-Bourani, M., Amin, G. R., & Siadat, A. (2012). A cell formation problem considering machine utilization and alternative process routes by scatter search. Journal of Intelligent Manufacturing, 23(4), 1127\u20131139.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"1223_CR33","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1007\/s00291-002-0105-3","volume":"25","author":"RH Teunter","year":"2003","unstructured":"Teunter, R. H., & Flapper, S. D. P. (2003). Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum, 25(1), 85\u201396.","journal-title":"OR Spectrum"},{"issue":"2","key":"1223_CR34","doi-asserted-by":"publisher","first-page":"333","DOI":"10.1007\/s10845-009-0358-7","volume":"23","author":"Z Tian","year":"2012","unstructured":"Tian, Z., Lin, D., & Wu, B. (2012). Condition based maintenance optimization considering multiple objectives. Journal of Intelligent Manufacturing, 23(2), 333\u2013340.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1223_CR35","doi-asserted-by":"publisher","first-page":"843","DOI":"10.1007\/s10845-009-0260-3","volume":"21","author":"MD Toksar\u0131","year":"2010","unstructured":"Toksar\u0131, M. D., & G\u00fcner, E. (2010). Parallel machine scheduling problem to minimize the earliness\/tardiness costs with learning effect and deteriorating jobs. Journal of Intelligent Manufacturing, 21(6), 843\u2013851.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"1223_CR36","doi-asserted-by":"publisher","first-page":"759","DOI":"10.1007\/s10845-010-0427-y","volume":"23","author":"B Vahdani","year":"2012","unstructured":"Vahdani, B., Tavakkoli-Moghaddam, R., Zandieh, M., & Razmi, J. (2012). Vehicle routing scheduling using an enhanced hybrid optimization approach. Journal of Intelligent Manufacturing, 23(3), 759\u2013774.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"11\u201312","key":"1223_CR37","doi-asserted-by":"publisher","first-page":"1230","DOI":"10.1007\/s00170-008-1924-4","volume":"44","author":"CC Wu","year":"2009","unstructured":"Wu, C. C., Shiau, Y. R., Lee, L. H., & Lee, W. C. (2009). Scheduling deteriorating jobs to minimize the makespan on a single machine. International Journal of Advanced Manufacturing Technology, 44(11\u201312), 1230\u20131236.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"3","key":"1223_CR38","doi-asserted-by":"publisher","first-page":"582","DOI":"10.1016\/j.cor.2011.05.011","volume":"39","author":"R Xu","year":"2012","unstructured":"Xu, R., Chen, H., & Li, X. (2012). Makespan minimization on single batch-processing machine via ant colony optimization. Computers and Operations Research, 39(3), 582\u2013593.","journal-title":"Computers and Operations Research"},{"issue":"8","key":"1223_CR39","doi-asserted-by":"publisher","first-page":"1510","DOI":"10.1016\/j.cor.2009.11.007","volume":"37","author":"S-J Yang","year":"2010","unstructured":"Yang, S.-J., Yang, D.-L., & Cheng, T. C. E. (2010). Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance. Computers & Operations Research, 37(8), 1510\u20131514.","journal-title":"Computers & Operations Research"},{"issue":"1\u20132","key":"1223_CR40","doi-asserted-by":"publisher","first-page":"305","DOI":"10.1007\/BF02832355","volume":"25","author":"CL Zhao","year":"2007","unstructured":"Zhao, C. L., & Tang, H. Y. (2007). Single-machine scheduling problems with an aging effect. Journal of Applied Mathematics and Computing, 25(1\u20132), 305\u2013314.","journal-title":"Journal of Applied Mathematics and Computing"},{"issue":"3","key":"1223_CR41","doi-asserted-by":"publisher","first-page":"837","DOI":"10.1016\/j.apm.2009.07.002","volume":"34","author":"CL Zhao","year":"2010","unstructured":"Zhao, C. L., & Tang, H. Y. (2010). Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan. Applied Mathematical Modelling, 34(3), 837\u2013841.","journal-title":"Applied Mathematical Modelling"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-016-1223-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-016-1223-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-016-1223-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-016-1223-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,25]],"date-time":"2019-04-25T15:07:39Z","timestamp":1556204859000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-016-1223-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,6,2]]},"references-count":41,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,1]]}},"alternative-id":["1223"],"URL":"https:\/\/doi.org\/10.1007\/s10845-016-1223-0","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,6,2]]},"assertion":[{"value":"12 November 2014","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"10 May 2016","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 June 2016","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}