{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,19]],"date-time":"2026-06-19T13:07:19Z","timestamp":1781874439302,"version":"3.54.5"},"reference-count":38,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2017,4,19]],"date-time":"2017-04-19T00:00:00Z","timestamp":1492560000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51275396"],"award-info":[{"award-number":["51275396"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2019,3]]},"DOI":"10.1007\/s10845-017-1325-3","type":"journal-article","created":{"date-parts":[[2017,4,19]],"date-time":"2017-04-19T20:58:01Z","timestamp":1492635481000},"page":"1303-1318","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":74,"title":["Deep neural networks based order completion time prediction by using real-time job shop RFID data"],"prefix":"10.1007","volume":"30","author":[{"given":"Chuang","family":"Wang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pingyu","family":"Jiang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2017,4,19]]},"reference":[{"issue":"4","key":"1325_CR1","doi-asserted-by":"publisher","first-page":"269","DOI":"10.1177\/1063293X11424512","volume":"19","author":"SM Asadzadeh","year":"2011","unstructured":"Asadzadeh, S. M., Azadeh, A., & Ziaeifar, A. (2011). A neuro-fuzzy-regression algorithm for improved prediction of manufacturing lead time with machine breakdowns. Concurrent Engineering, 19(4), 269\u2013281. doi: 10.1177\/1063293X11424512 .","journal-title":"Concurrent Engineering"},{"key":"1325_CR2","first-page":"153","volume":"19","author":"Y Bengio","year":"2007","unstructured":"Bengio, Y., Lamblin, P., Popovici, D., & Larochelle, H. (2007). Greedy layer-wise training of deep networks. Advances in Neural Information Processing Systems, 19, 153\u2013160.","journal-title":"Advances in Neural Information Processing Systems"},{"issue":"12","key":"1325_CR3","doi-asserted-by":"publisher","first-page":"3810","DOI":"10.1080\/00207543.2014.993045","volume":"53","author":"N Brahimi","year":"2014","unstructured":"Brahimi, N., Aouam, T., & Aghezzaf, E. (2014). Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times. International Journal of Production Research, 53(12), 3810\u20133822.","journal-title":"International Journal of Production Research"},{"issue":"19","key":"1325_CR4","doi-asserted-by":"publisher","first-page":"2153","DOI":"10.1016\/j.fss.2007.04.013","volume":"158","author":"T Chen","year":"2007","unstructured":"Chen, T. (2007). Incorporating fuzzy c-means and a back-propagation network ensemble to job completion time prediction in a semiconductor fabrication factory. Fuzzy Sets and Systems, 158(19), 2153\u20132168. doi: 10.1016\/j.fss.2007.04.013 .","journal-title":"Fuzzy Sets and Systems"},{"issue":"16\u201318","key":"1325_CR5","doi-asserted-by":"publisher","first-page":"3193","DOI":"10.1016\/j.neucom.2008.04.040","volume":"71","author":"T Chen","year":"2008","unstructured":"Chen, T. (2008). A hybrid fuzzy-neural approach to job completion time prediction in a semiconductor fabrication factory. Neurocomputing, 71(16\u201318), 3193\u20133201. doi: 10.1016\/j.neucom.2008.04.040 .","journal-title":"Neurocomputing"},{"issue":"2","key":"1325_CR6","doi-asserted-by":"publisher","first-page":"536","DOI":"10.1016\/j.ijpe.2005.03.003","volume":"104","author":"D Corti","year":"2006","unstructured":"Corti, D., Pozzetti, A., & Zorzini, M. (2006). A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics, 104(2), 536\u2013554. doi: 10.1016\/j.ijpe.2005.03.003 .","journal-title":"International Journal of Production Economics"},{"issue":"5","key":"1325_CR7","doi-asserted-by":"publisher","first-page":"1295","DOI":"10.1080\/00207549508930210","volume":"33","author":"ST Enns","year":"1995","unstructured":"Enns, S. T. (1995). A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research, 33(5), 1295\u20131312.","journal-title":"International Journal of Production Research"},{"key":"1325_CR8","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/j.procir.2015.03.016","volume":"31","author":"Y Fu","year":"2015","unstructured":"Fu, Y., Zhang, Y., Qiao, H., Li, D., Zhou, H., & Leopold, J. (2015). Analysis of feature extracting ability for cutting state monitoring using deep belief networks. Procedia CIRP, 31, 29\u201334. doi: 10.1016\/j.procir.2015.03.016 .","journal-title":"Procedia CIRP"},{"issue":"2","key":"1325_CR9","doi-asserted-by":"publisher","first-page":"157","DOI":"10.1016\/S0305-0548(98)00055-0","volume":"26","author":"VS Gordon","year":"1999","unstructured":"Gordon, V. S., & Strusevich, V. A. (1999). Earliness penalties on a single machine subject to precedence constraints: SLK due date assignment. Computers and Operations Research, 26(2), 157\u2013177.","journal-title":"Computers and Operations Research"},{"issue":"1","key":"1325_CR10","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0377-2217(01)00181-3","volume":"139","author":"V Gordon","year":"2002","unstructured":"Gordon, V., Proth, J., & Chu, C. (2002). A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research, 139(1), 1\u201325. doi: 10.1016\/S0377-2217(01)00181-3 .","journal-title":"European Journal of Operational Research"},{"issue":"8","key":"1325_CR11","doi-asserted-by":"publisher","first-page":"1771","DOI":"10.1162\/089976602760128018","volume":"14","author":"GE Hinton","year":"2002","unstructured":"Hinton, G. E. (2002). Training products of experts by minimizing contrastive divergence. Neural Computation, 14(8), 1771\u20131800.","journal-title":"Neural Computation"},{"issue":"5786","key":"1325_CR12","doi-asserted-by":"publisher","first-page":"504","DOI":"10.1126\/science.1127647","volume":"313","author":"GE Hinton","year":"2006","unstructured":"Hinton, G. E., & Salakhutdinov, R. R. (2006). Reducing the dimensionality of data with neural networks. Science, 313(5786), 504\u2013507.","journal-title":"Science"},{"issue":"7","key":"1325_CR13","doi-asserted-by":"publisher","first-page":"1527","DOI":"10.1162\/neco.2006.18.7.1527","volume":"18","author":"GE Hinton","year":"2006","unstructured":"Hinton, G. E., Osindero, S., & Teh, Y. (2006). A fast learning algorithm for deep belief nets. Neural Computation, 18(7), 1527\u20131554.","journal-title":"Neural Computation"},{"issue":"4","key":"1325_CR14","doi-asserted-by":"publisher","first-page":"321","DOI":"10.1287\/msom.3.4.321.9968","volume":"3","author":"WJ Hopp","year":"2001","unstructured":"Hopp, W. J., & Melanie, R. S. (2001). A simple, robust leadtime-quoting policy. Manufacturing and Service Operations Management, 3(4), 321\u2013336.","journal-title":"Manufacturing and Service Operations Management"},{"issue":"9","key":"1325_CR15","doi-asserted-by":"publisher","first-page":"1727","DOI":"10.1080\/00207540310001624375","volume":"42","author":"SY Hsu","year":"2007","unstructured":"Hsu, S. Y., & Sha, D. Y. (2007). Due date assignment using artificial neural networks under different shop floor control strategies. International Journal of Production Research, 42(9), 1727\u20131745. doi: 10.1080\/00207540310001624375 .","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1325_CR16","first-page":"122","volume":"15","author":"S Hu","year":"2012","unstructured":"Hu, S., Zhang, B., & Zhang, X. (2012). Order completion date estimation and due date decision under make-to-order mode. Industrial Engineering Journal, 15(3), 122\u2013129.","journal-title":"Industrial Engineering Journal"},{"key":"1325_CR17","unstructured":"Keshmiri, S., Zheng, X., Chew, C. M., & Pang, C. K. (2015). Application of deep neural network in estimation of the weld bead parameters. arXiv:1502.4187 ."},{"issue":"5","key":"1325_CR18","doi-asserted-by":"publisher","first-page":"657","DOI":"10.1080\/07408179508936781","volume":"27","author":"RS Lawrence","year":"1995","unstructured":"Lawrence, R. S. (1995). Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27(5), 657\u2013668.","journal-title":"IIE Transactions"},{"key":"1325_CR19","doi-asserted-by":"crossref","unstructured":"Lee, H., Grosse, R., Ranganath, R., & Ng, A. Y. (2009). Convolutional deep belief networks for scalable unsupervised learning of hierarchical representations. Paper presented at the proceedings of the 26th annual international conference on machine learning.","DOI":"10.1145\/1553374.1553453"},{"issue":"6","key":"1325_CR20","doi-asserted-by":"publisher","first-page":"616","DOI":"10.1080\/0951192X.2014.900859","volume":"28","author":"M Li","year":"2015","unstructured":"Li, M., Yao, L., Yang, J., & Wang, Z. (2015). Due date assignment and dynamic scheduling of one-of-a-kind assembly production with uncertain processing time. International Journal of Computer Integrated Manufacturing, 28(6), 616\u2013627.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"9","key":"1325_CR21","first-page":"574","volume":"20","author":"F Liang","year":"2013","unstructured":"Liang, F., Fung, R. Y., & Jiang, Z. (2013). A comined approach of cycle time estimation in mass customization enterprise. International Journal of Industrial Engineering, 20(9), 574\u2013588.","journal-title":"International Journal of Industrial Engineering"},{"key":"1325_CR22","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1007\/978-3-319-06938-8_8","volume-title":"Machine learning for adaptive many-core machines\u2013a practical approach","author":"N Lopes","year":"2015","unstructured":"Lopes, N., & Ribeiro, B. (2015). Deep belief networks (DBNs). In J. Kacprzyk (Ed.), Machine learning for adaptive many-core machines\u2013a practical approach (pp. 155\u2013186). Switzerland: Springer."},{"issue":"1","key":"1325_CR23","doi-asserted-by":"publisher","first-page":"14","DOI":"10.1109\/TASL.2011.2109382","volume":"20","author":"A Mohamed","year":"2012","unstructured":"Mohamed, A., Dahl, G. E., & Hinton, G. (2012). Acoustic modeling using deep belief networks. IEEE Transactions on Audio, Speech, and Language Processing, 20(1), 14\u201322. doi: 10.1109\/TASL.2011.2109382 .","journal-title":"IEEE Transactions on Audio, Speech, and Language Processing"},{"issue":"20","key":"1325_CR24","doi-asserted-by":"publisher","first-page":"4353","DOI":"10.1080\/00207540410001716462","volume":"42","author":"S Moses","year":"2004","unstructured":"Moses, S., Grant, H., Gruenwald, L., & Pulat, S. (2004). Real-time due-date promising by build-to-order environments. International Journal of Production Research, 42(20), 4353\u20134375.","journal-title":"International Journal of Production Research"},{"key":"1325_CR25","unstructured":"Okubo, H., Weng, J., Kaneko, R., & Simizu, T. (2000). Production lead-time estimation system based on neural network. Research paper."},{"issue":"6","key":"1325_CR26","doi-asserted-by":"publisher","first-page":"423","DOI":"10.1016\/S0305-0483(02)00058-0","volume":"30","author":"I Sabuncuoglu","year":"2002","unstructured":"Sabuncuoglu, I., & Comlekci, A. (2002). Operation-based owtime estimation in a dynamic job shop. Omega, 30(6), 423\u2013442.","journal-title":"Omega"},{"key":"1325_CR27","doi-asserted-by":"crossref","unstructured":"Sarikaya, R., Hinton, G. E., & Ramabhadran, B. (2011). Deep belief nets for natural language call-routing. Paper presented at the 2011 IEEE international conference on acoustics, speech and signal processing.","DOI":"10.1109\/ICASSP.2011.5947649"},{"key":"1325_CR28","doi-asserted-by":"publisher","first-page":"2362","DOI":"10.3724\/SP.J.1087.2013.02362","volume":"8","author":"D Sun","year":"2013","unstructured":"Sun, D., Shi, H., & Chang, L. (2013). Application of support vector regression in prediction of application of support vector regression in prediction of due date under uncertain assemble-to-order environment. Journal of Computer Applications, 8, 2362\u20132365.","journal-title":"Journal of Computer Applications"},{"key":"1325_CR29","doi-asserted-by":"publisher","first-page":"124","DOI":"10.1016\/j.ress.2013.02.022","volume":"115","author":"P Tamilselvan","year":"2013","unstructured":"Tamilselvan, P., & Wang, P. (2013). Failure diagnosis using deep belief learning based health state classification. Reliability Engineering and System Safety, 115, 124\u2013135. doi: 10.1016\/j.ress.2013.02.022 .","journal-title":"Reliability Engineering and System Safety"},{"key":"1325_CR30","doi-asserted-by":"crossref","unstructured":"Toshev, A., & Christian, S. (2014). DeepPose: Human pose estimation via deep neural networks. Paper presented at the 2014 IEEE conference on computer vision and pattern recognition (CVPR).","DOI":"10.1109\/CVPR.2014.214"},{"issue":"1","key":"1325_CR31","doi-asserted-by":"publisher","first-page":"127","DOI":"10.1016\/j.ijpe.2010.08.017","volume":"129","author":"V Vinod","year":"2011","unstructured":"Vinod, V., & Sridharan, R. (2011). Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system. International Journal of Production Economics, 129(1), 127\u2013146. doi: 10.1016\/j.ijpe.2010.08.017 .","journal-title":"International Journal of Production Economics"},{"key":"1325_CR32","doi-asserted-by":"publisher","unstructured":"Wang, C., & Jiang, P. (2016). Manifold learning based rescheduling decision mechanism for recessive disturbances in RFID-driven job shops. Journal of Intelligent Manufacturing. doi: 10.1007\/s10845-016-1194-1 .","DOI":"10.1007\/s10845-016-1194-1"},{"issue":"2","key":"1325_CR33","doi-asserted-by":"publisher","first-page":"259","DOI":"10.1016\/0377-2217(95)00268-5","volume":"89","author":"ZK Weng","year":"1996","unstructured":"Weng, Z. K. (1996). Manufacturing lead times, system utilization rates and lead-time-related demand. European Journal of Operational Research, 89(2), 259\u2013268.","journal-title":"European Journal of Operational Research"},{"issue":"1\u20134","key":"1325_CR34","doi-asserted-by":"publisher","first-page":"181","DOI":"10.1007\/s00170-013-4763-x","volume":"67","author":"S Yang","year":"2013","unstructured":"Yang, S., Lee, H., & Guo, J. (2013). Multiple common due dates assignment and scheduling problems with resource allocation and general position-dependent deterioration effect. The International Journal of Advanced Manufacturing Technology, 67(1\u20134), 181\u2013188. doi: 10.1007\/s00170-013-4763-x .","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"1325_CR35","doi-asserted-by":"crossref","unstructured":"Zhong, R. Y., Huang, G. Q., Dai, Q., & Zhang, T. (2013). Estimation of lead time in the RFID-enabled real-time shopfloor production with a data mining model. Paper presented at the The 19th international conference on industrial engineering and engineering management.","DOI":"10.1007\/978-3-642-38391-5_33"},{"key":"1325_CR36","first-page":"300","volume":"3","author":"H Zhu","year":"2009","unstructured":"Zhu, H., Liu, F., Liu, Q., & Shao, X. U. (2009). A predictive method for order due date based on real-time state of workshop. China Mechanical Engineering, 3, 300\u2013304.","journal-title":"China Mechanical Engineering"},{"issue":"21","key":"1325_CR37","doi-asserted-by":"publisher","first-page":"6416","DOI":"10.1080\/00207543.2016.1151566","volume":"54","author":"T Ziarnetzky","year":"2016","unstructured":"Ziarnetzky, T., & M\u00f6nch, L. (2016). Incorporating engineering process improvement activities into production planning formulations using a large-scale wafer fab model. International Journal of Production Research, 54(21), 6416\u20136435.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"1325_CR38","doi-asserted-by":"publisher","first-page":"919","DOI":"10.1016\/j.ijpe.2007.08.005","volume":"112","author":"M Zorzini","year":"2008","unstructured":"Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics, 112(2), 919\u2013933. doi: 10.1016\/j.ijpe.2007.08.005 .","journal-title":"International Journal of Production Economics"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10845-017-1325-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-017-1325-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-017-1325-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,23]],"date-time":"2023-08-23T05:50:17Z","timestamp":1692769817000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10845-017-1325-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,4,19]]},"references-count":38,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2019,3]]}},"alternative-id":["1325"],"URL":"https:\/\/doi.org\/10.1007\/s10845-017-1325-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,4,19]]},"assertion":[{"value":"15 July 2016","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"11 April 2017","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 April 2017","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}