{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,16]],"date-time":"2026-01-16T18:50:39Z","timestamp":1768589439670,"version":"3.49.0"},"reference-count":39,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2021,1,3]],"date-time":"2021-01-03T00:00:00Z","timestamp":1609632000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,1,3]],"date-time":"2021-01-03T00:00:00Z","timestamp":1609632000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2021,10]]},"DOI":"10.1007\/s10845-020-01728-1","type":"journal-article","created":{"date-parts":[[2021,1,3]],"date-time":"2021-01-03T06:02:38Z","timestamp":1609653758000},"page":"1913-1925","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":8,"title":["Regenerative scheduling problem in engineer to order manufacturing: an economic assessment"],"prefix":"10.1007","volume":"32","author":[{"given":"R.","family":"Micale","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0250-9201","authenticated-orcid":false,"given":"C. M.","family":"La Fata","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Enea","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"G.","family":"La Scalia","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,1,3]]},"reference":[{"key":"1728_CR1","doi-asserted-by":"publisher","first-page":"249","DOI":"10.1016\/S0377-2217(02)00758-0","volume":"149","author":"C Artigues","year":"2003","unstructured":"Artigues, C., Michelon, P., & Reusser, S. (2003). Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operation Research, 149, 249\u2013267.","journal-title":"European Journal of Operation Research"},{"key":"1728_CR2","doi-asserted-by":"publisher","first-page":"102021","DOI":"10.1016\/j.omega.2018.12.010","volume":"91","author":"F Basso","year":"2020","unstructured":"Basso, F., Guajardo, M., & Varas, M. (2020). Collaborative job scheduling in the wine bottling process. Omega, 91, 102021.","journal-title":"Omega"},{"key":"1728_CR3","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1016\/0925-5273(93)90077-X","volume":"30\u201331","author":"JWM Bertrand","year":"1993","unstructured":"Bertrand, J. W. M., & Muntslag, D. R. (1993). Production control in engineer-to-order firms. International Journal of Production Economics, 30\u201331, 3\u201322.","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"1728_CR4","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1080\/07408170490447366","volume":"36","author":"K Charnsirisakskul","year":"2004","unstructured":"Charnsirisakskul, K., Griffin, P. M., & Keskinocak, P. (2004). Order selection and scheduling with leadtime flexibility. IIE Transactions, 36(7), 697\u2013707.","journal-title":"IIE Transactions"},{"key":"1728_CR5","doi-asserted-by":"publisher","first-page":"5432","DOI":"10.3390\/su11195432","volume":"11","author":"S-H Chen","year":"2019","unstructured":"Chen, S.-H., Liou, Y.-C., Chen, Y.-H., & Wang, K.-C. (2019). Order acceptance and scheduling problem with carbon emission reduction and electricity tariffs on a single machine. Sustainability, 11, 5432.","journal-title":"Sustainability"},{"issue":"3","key":"1728_CR6","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1080\/09511929208944524","volume":"5","author":"LK Church","year":"1992","unstructured":"Church, L. K., & Uzsoy, R. (1992). Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5(3), 153\u2013163.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"1728_CR7","doi-asserted-by":"publisher","first-page":"103122","DOI":"10.1016\/j.compind.2019.08.003","volume":"112","author":"P Dallasega","year":"2019","unstructured":"Dallasega, P., Rojas, R. A., Bruno, G., & Rauch, E. (2019). An agile scheduling and control approach in ETO construction supply chains. Computers Industry, 112, 103122.","journal-title":"Computers Industry"},{"key":"1728_CR8","doi-asserted-by":"publisher","first-page":"463","DOI":"10.1007\/978-94-017-0161-7_45","volume-title":"Recent advances in integrated design and manufacturing in mechanical engineering","author":"C Earl","year":"2003","unstructured":"Earl, C., Song, D. P., & Hicks, C. (2003). Planning complex engineer-to-order products. In G. Gogu, D. Coutellier, P. Chedmail, & P. Ray (Eds.), Recent advances in integrated design and manufacturing in mechanical engineering (pp. 463\u2013472). Dordecht: Kluwer."},{"key":"1728_CR9","doi-asserted-by":"publisher","first-page":"107","DOI":"10.1007\/s00291-004-0171-9","volume":"27","author":"MJR Ebben","year":"2005","unstructured":"Ebben, M. J. R., Hans, E. W., & Olde Weghuis, F. M. (2005). Workload based order acceptance in job shop environments. OR Spectrum, 27, 107\u2013122.","journal-title":"OR Spectrum"},{"key":"1728_CR10","doi-asserted-by":"publisher","first-page":"419","DOI":"10.1016\/j.ejor.2015.11.036","volume":"251","author":"R Esmaeilbeigi","year":"2016","unstructured":"Esmaeilbeigi, R., Charkhgard, P., & Charkhgard, H. (2016). Order acceptance and scheduling problems in two-machine flow shops: New mixed integer programming formulations. European Journal of Operational Research, 251, 419\u2013431.","journal-title":"European Journal of Operational Research"},{"key":"1728_CR11","doi-asserted-by":"publisher","first-page":"100022","DOI":"10.1016\/j.eswax.2020.100022","volume":"5","author":"L Fanjul-Peyro","year":"2020","unstructured":"Fanjul-Peyro, L. (2020). Models and an exact method for the Unrelated Parallel Machine scheduling problem with setups and resources. Expert Systems with Applications, 5, 100022.","journal-title":"Expert Systems with Applications"},{"key":"1728_CR12","doi-asserted-by":"publisher","first-page":"741","DOI":"10.1016\/j.ijpe.2009.07.002","volume":"122","author":"J Gosling","year":"2009","unstructured":"Gosling, J., & Naim, M. M. (2009). Engineer-to-order supply chain management: A literature review and research agenda. International Journal of Production Economics, 122, 741\u2013754.","journal-title":"International Journal of Production Economics"},{"issue":"19","key":"1728_CR13","doi-asserted-by":"publisher","first-page":"5728","DOI":"10.1080\/00207543.2013.787169","volume":"51","author":"DH Grabenstetter","year":"2013","unstructured":"Grabenstetter, D. H., & Usher, J. M. (2013). Determining job complexity in an engineer to order environment for due date estimation using a proposed framework. International Journal of Production Research, 51(19), 5728\u20135740.","journal-title":"International Journal of Production Research"},{"key":"1728_CR14","doi-asserted-by":"publisher","first-page":"6349","DOI":"10.1080\/00207543.2014.940072","volume":"52","author":"DH Grabenstetter","year":"2014","unstructured":"Grabenstetter, D. H., & Usher, J. M. (2014). Developing due dates in an engineer-to-order engineering environment. International Journal of Production Research, 52, 6349\u20136361.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"1728_CR15","doi-asserted-by":"publisher","first-page":"201","DOI":"10.1080\/21693277.2015.1035461","volume":"3","author":"DH Grabenstetter","year":"2015","unstructured":"Grabenstetter, D. H., & Usher, J. M. (2015). Sequencing jobs in an engineer-to-order engineering environment. Production & Manufacturing Research, 3(1), 201\u2013217.","journal-title":"Production & Manufacturing Research"},{"issue":"8","key":"1728_CR16","doi-asserted-by":"publisher","first-page":"874","DOI":"10.1002\/nav.20259","volume":"54","author":"J Herbots","year":"2007","unstructured":"Herbots, J., Herroelen, W., & Leus, R. (2007). Dynamic order acceptance and capacity planning on a single bottleneck resource. Naval Research Logistics, 54(8), 874\u2013889.","journal-title":"Naval Research Logistics"},{"issue":"15","key":"1728_CR17","doi-asserted-by":"publisher","first-page":"3477","DOI":"10.1080\/00207540600767772","volume":"45","author":"C Hicks","year":"2007","unstructured":"Hicks, C., Song, D. P., & Earl, C. F. (2007). Dynamic scheduling for complex engineer-to order products. International Journal of Production Research, 45(15), 3477\u20133503.","journal-title":"International Journal of Production Research"},{"issue":"3","key":"1728_CR18","doi-asserted-by":"publisher","first-page":"271","DOI":"10.14743\/apem2019.3.327","volume":"14","author":"C Jian","year":"2019","unstructured":"Jian, C., & Xi, J. T. (2019). Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method. Advances in Production Engineering & Management, 14(3), 271\u2013283.","journal-title":"Advances in Production Engineering & Management"},{"key":"1728_CR19","doi-asserted-by":"publisher","first-page":"885","DOI":"10.3390\/app9050885","volume":"9","author":"C Jiang","year":"2019","unstructured":"Jiang, C., Hu, X., & Xi, J. (2019). Integrated multi-project scheduling and hierarchical workforce allocation in the ETO assembly process. Applied Science, 9, 885.","journal-title":"Applied Science"},{"issue":"4","key":"1728_CR20","first-page":"145","volume":"11","author":"E Koyuncu","year":"2017","unstructured":"Koyuncu, E. (2017). A fuzzy mathematical model for order acceptance and scheduling problem. International Journal of Mathematical and Computational Sciences, 11(4), 145\u2013148.","journal-title":"International Journal of Mathematical and Computational Sciences"},{"key":"1728_CR21","unstructured":"La Fata, C. M., & Passannanti, G. (2014). A multi-objective genetic algorithm for the passenger maritime transportation problem. In OPTI 2014 an international conference on engineering and applied sciences optimization (pp. 111\u2013128), 4\u20136 June 2014, Kos Island, Greece."},{"issue":"16","key":"1728_CR22","first-page":"37894","volume":"10","author":"G La Scalia","year":"2015","unstructured":"La Scalia, G., Micale, R., Aiello, G., & Enea, M. (2015). An integrated approach for modeling and solving multimode job shop scheduling problem using multi objective genetic algorithm. International Journal of Applied Engineering Research, 10(16), 37894\u201337899.","journal-title":"International Journal of Applied Engineering Research"},{"key":"1728_CR23","doi-asserted-by":"publisher","first-page":"102036","DOI":"10.1016\/j.omega.2019.02.005","volume":"93","author":"Y Lee","year":"2020","unstructured":"Lee, Y., & Lee, K. (2020). Lot-sizing and scheduling in flat-panel display manufacturing process. Omega, 93, 102036.","journal-title":"Omega"},{"issue":"2","key":"1728_CR24","doi-asserted-by":"publisher","first-page":"469","DOI":"10.1007\/s10845-018-1459-y","volume":"31","author":"Z Li","year":"2020","unstructured":"Li, Z., Barenji, A. V., Jiang, J., Zhong, R. Y., & Xu, G. (2020). A mechanism for scheduling multi robot intelligent warehouse system face with dynamic demand. Journal of Intelligent Manufacturing, 31(2), 469\u2013480.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"6","key":"1728_CR25","doi-asserted-by":"publisher","first-page":"545","DOI":"10.1080\/09511920050195977","volume":"13","author":"D Little","year":"2000","unstructured":"Little, D., Rollins, R., Peck, M., & Porter, J. K. (2000). Integrated planning and scheduling in the engineer-to-order sector. International Journal of Computer Integrated Manufacturing, 13(6), 545\u2013554.","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"1\u20132","key":"1728_CR26","doi-asserted-by":"publisher","first-page":"459","DOI":"10.1080\/00207543.2018.1431417","volume":"56","author":"P Melchiors","year":"2018","unstructured":"Melchiors, P., Leus, R., Creemers, S., & Kolisch, R. (2018). Dynamic order acceptance and capacity planning in a stochastic multi-project environment with a bottleneck resource. International Journal of Production Research, 56(1\u20132), 459\u2013475.","journal-title":"International Journal of Production Research"},{"key":"1728_CR27","doi-asserted-by":"publisher","first-page":"623","DOI":"10.1016\/j.jom.2006.04.006","volume":"25","author":"JR Meredith","year":"2007","unstructured":"Meredith, J. R., & Akinc, U. (2007). Characterizing and structuring a new make-to-forecast production strategy. Journal of Operations Management, 25, 623\u2013642.","journal-title":"Journal of Operations Management"},{"key":"1728_CR28","doi-asserted-by":"publisher","first-page":"367","DOI":"10.1016\/j.cor.2010.06.003","volume":"38","author":"FT Nobibon","year":"2011","unstructured":"Nobibon, F. T., & Leus, R. (2011). Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment. Computer & Operations Research, 38, 367\u2013378.","journal-title":"Computer & Operations Research"},{"key":"1728_CR29","doi-asserted-by":"publisher","first-page":"200","DOI":"10.1016\/j.ijpe.2010.02.002","volume":"125","author":"C O\u01e7uz","year":"2010","unstructured":"O\u01e7uz, C., Salman, F. S., & Yalcin, Z. B. (2010). Order acceptance and scheduling decisions in make-to-order systems. International Journal of Production Economics, 125, 200\u2013211.","journal-title":"International Journal of Production Economics"},{"key":"1728_CR30","doi-asserted-by":"publisher","first-page":"653","DOI":"10.1016\/j.ejor.2014.09.028","volume":"241","author":"J Ou","year":"2015","unstructured":"Ou, J., Zhong, X., & Wang, G. (2015). An improved heuristic parallel machine scheduling with rejection. European Journal of Operational Research, 241, 653\u2013661.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"1728_CR31","doi-asserted-by":"publisher","first-page":"369","DOI":"10.1504\/IJOR.2019.098312","volume":"34","author":"VP Palakiti","year":"2019","unstructured":"Palakiti, V. P., Mohan, U., & Ganesan, V. K. (2019). Order acceptance and scheduling: overview and complexity results. International Journal of Operational Research, 34(3), 369\u2013386.","journal-title":"International Journal of Operational Research"},{"issue":"19","key":"1728_CR32","doi-asserted-by":"publisher","first-page":"5742","DOI":"10.1080\/00207543.2014.994077","volume":"53","author":"P Perez-Gonzalez","year":"2015","unstructured":"Perez-Gonzalez, P., & Framinan, J. M. (2015). Assessing scheduling policies in a permutation flowshop with common due dates. International Journal of Production Research, 53(19), 5742\u20135754.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"1728_CR33","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1016\/j.ejor.2015.06.018","volume":"247","author":"HF Rahman","year":"2015","unstructured":"Rahman, H. F., Sarker, R., & Essam, D. (2015). A real-time order acceptance and scheduling approach for permutation flow shop problems. European Journal of Operational Research, 247(2), 488\u2013503.","journal-title":"European Journal of Operational Research"},{"key":"1728_CR34","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2010.09.042","volume":"212","author":"SA Slotnick","year":"2011","unstructured":"Slotnick, S. A. (2011). Order acceptance and scheduling: a taxonomy and review. European Journal of Operational Research, 212, 1\u201311.","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"1728_CR35","doi-asserted-by":"publisher","first-page":"2733","DOI":"10.1007\/s10845-018-1425-8","volume":"30","author":"H Wang","year":"2019","unstructured":"Wang, H., Huang, M., & Wang, J. (2019a). An effective metaheuristic algorithm for flowshop scheduling with deteriorating jobs. Journal of Intelligent Manufacturing, 30(7), 2733\u20132742.","journal-title":"Journal of Intelligent Manufacturing"},{"key":"1728_CR36","doi-asserted-by":"publisher","first-page":"841","DOI":"10.1016\/j.cie.2018.11.021","volume":"127","author":"Z Wang","year":"2019","unstructured":"Wang, Z., Qi, Y., Cui, H., & Zhang, J. (2019b). A hybrid algorithm for order acceptance and scheduling problem in make-to-stock\/make-to-order industries. Computer and Industrial Engineering, 127, 841\u2013852.","journal-title":"Computer and Industrial Engineering"},{"key":"1728_CR37","doi-asserted-by":"publisher","first-page":"159","DOI":"10.1016\/j.cor.2018.12.016","volume":"104","author":"S Wang","year":"2019","unstructured":"Wang, S., & Ye, B. (2019). Exact methods for order acceptance and scheduling on unrelated parallel machines. Computer and Operations Research, 104, 159\u2013173.","journal-title":"Computer and Operations Research"},{"key":"1728_CR38","volume-title":"Accounting principles","author":"JJ Weygandt","year":"2015","unstructured":"Weygandt, J. J., & Kieso, D. E. (2015). Accounting principles (12th ed.). Hoboken: Wiley.","edition":"12"},{"issue":"4","key":"1728_CR39","doi-asserted-by":"publisher","first-page":"1809","DOI":"10.1007\/s10845-017-1350-2","volume":"30","author":"J Zhang","year":"2019","unstructured":"Zhang, J., Ding, G., Zou, Y., Qin, S., & Fu, J. (2019). Review of job shop scheduling research and its new perspectives under Industry 40. Journal of Intelligent Manufacturing, 30(4), 1809\u20131830.","journal-title":"Journal of Intelligent Manufacturing"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-020-01728-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10845-020-01728-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-020-01728-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,27]],"date-time":"2021-08-27T07:20:43Z","timestamp":1630048843000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10845-020-01728-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,1,3]]},"references-count":39,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2021,10]]}},"alternative-id":["1728"],"URL":"https:\/\/doi.org\/10.1007\/s10845-020-01728-1","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,1,3]]},"assertion":[{"value":"18 June 2020","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"9 December 2020","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 January 2021","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Compliance with ethical standards"}},{"value":"The authors declare that they have no conflict of interest.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}