{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,11,22]],"date-time":"2026-11-22T13:53:31Z","timestamp":1795355611515,"version":"4.10.3"},"reference-count":76,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2025,3,8]],"date-time":"2025-03-08T00:00:00Z","timestamp":1741392000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2025,3,8]],"date-time":"2025-03-08T00:00:00Z","timestamp":1741392000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100000867","name":"Commonwealth Scholarship Commission","doi-asserted-by":"publisher","award":["Commonwealth Scholarship Commission"],"award-info":[{"award-number":["Commonwealth Scholarship Commission"]}],"id":[{"id":"10.13039\/501100000867","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2026,3]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>Dynamic job shop scheduling (DJSS) demands real-time adaptability under unpredictable conditions such as sudden job arrivals, equipment failures, and fluctuating demands. Traditional scheduling approaches\u2014though foundational\u2014often fall short when faced with rapid changes and high computational complexity. Recent developments in artificial intelligence (AI), especially reinforcement learning (RL), offer powerful alternatives by continuously refining scheduling policies through interaction with live shop-floor data. This review systematically examines AI-driven scheduling methods, highlighting how evolutionary heuristics, advanced machine learning, and RL-based algorithms each address the demands of modern manufacturing. Emphasis is placed on RL\u2019s capacity to cope with large state spaces, handle continuous or discrete control, and integrate domain heuristics for more robust real-time decision-making. Despite these advances, challenges remain in algorithm scalability, interpretability, data availability, and standardization of performance metrics. Future directions point toward leveraging digital twins, quantum computing, hybrid models, and explainable RL to ensure more resilient, transparent, and scalable solutions. By illuminating both current achievements and persistent gaps, this review underscores the transformative potential of RL in dynamic scheduling and highlights actionable steps for broader industrial adoption.<\/jats:p>","DOI":"10.1007\/s10845-025-02585-6","type":"journal-article","created":{"date-parts":[[2025,3,8]],"date-time":"2025-03-08T14:07:56Z","timestamp":1741442876000},"page":"1093-1108","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":73,"title":["Reinforcement learning in dynamic job shop scheduling: a comprehensive review of AI-driven approaches in modern manufacturing"],"prefix":"10.1007","volume":"37","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8509-0743","authenticated-orcid":false,"given":"Chinyere","family":"Ngwu","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ying","family":"Liu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Rui","family":"Wu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2025,3,8]]},"reference":[{"key":"2585_CR1","unstructured":"Abdolrazzagh-Nezhad, M., & Abdullah, S. (2017). Multi-lingual sentiment analysis view project initialization heuristics with electromagnetic-like mechanism for crisp and fuzzy job-shop scheduling problems. Retrieved February 7, 2024, from https:\/\/www.researchgate.net\/publication\/339128833"},{"key":"2585_CR2","unstructured":"Aru, E., & Ngwu, C. (2021). Modern approach to artificial intelligence (1st ed.). Hephzibah Divine Printing and Publishing Company."},{"issue":"2\u20133","key":"2585_CR3","first-page":"559","volume":"33","author":"ME Aydin","year":"2000","unstructured":"Aydin, M. E., & \u00d6ztemel, E. (2000). Dynamic job-shop scheduling using reinforcement learning agents. Robotics and Autonomous Systems, 33(2\u20133), 559\u2013565.","journal-title":"Robotics and Autonomous Systems"},{"key":"2585_CR4","doi-asserted-by":"crossref","unstructured":"Baker, K. R., & Trietsch, D. (2019). Principles of sequencing and scheduling. John Wiley & Sons, Inc.","DOI":"10.1002\/9781119262602"},{"issue":"1\u20132","key":"2585_CR5","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1023\/A:1022140919877","volume":"13","author":"AG Barto","year":"2003","unstructured":"Barto, A. G., & Mahadevan, S. (2003). Recent advances in hierarchical reinforcement learning. Discrete Event Dynamic Systems, 13(1\u20132), 41\u201377. https:\/\/doi.org\/10.1023\/A:1022140919877","journal-title":"Discrete Event Dynamic Systems"},{"key":"2585_CR6","doi-asserted-by":"publisher","unstructured":"Belmamoune, M. A. G., & Lat\u00e9faand, Y. Z. (2023). Solving a job shop scheduling problem using Q-learning algorithm. In T. Borangiu, & D. Trentesaux,L. P. (Eds.), Service oriented, holonic and multi-agent manufacturing systems for industry of the future (pp. 196\u2013209). Springer International Publishing. https:\/\/doi.org\/10.1007\/978-3-031-27699-9_17","DOI":"10.1007\/978-3-031-27699-9_17"},{"issue":"1","key":"2585_CR7","doi-asserted-by":"publisher","first-page":"360","DOI":"10.1016\/j.ijpe.2012.08.001","volume":"141","author":"B Chen","year":"2013","unstructured":"Chen, B., & Matis, T. (2013). A flexible dispatching rule for minimizing tardiness in job shop scheduling. International Journal of Production Economics, 141(1), 360\u2013365. https:\/\/doi.org\/10.1016\/j.ijpe.2012.08.001","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"2585_CR8","doi-asserted-by":"publisher","first-page":"622","DOI":"10.1006\/jcss.1998.1607","volume":"58","author":"J Chen","year":"1999","unstructured":"Chen, J., Friesen, D., & Zheng, H. (1999). Tight bound on Johnson\u2019s algorithm for maximum satisfiability. Journal of Computer and System Sciences, 58(3), 622\u2013640. https:\/\/doi.org\/10.1006\/jcss.1998.1607","journal-title":"Journal of Computer and System Sciences"},{"issue":"6","key":"2585_CR9","doi-asserted-by":"publisher","first-page":"559","DOI":"10.1080\/0951192X.2019.1599448","volume":"32","author":"A DeJong","year":"2019","unstructured":"DeJong, A., Rubrico, J. I. U., Adachi, M., Nakamura, T., & Ota, J. (2019). A generalised Makespan Estimation for shop scheduling problems, using visual data and a convolutional neural network. International Journal of Computer Integrated Manufacturing, 32(6), 559\u2013568. https:\/\/doi.org\/10.1080\/0951192X.2019.1599448","journal-title":"International Journal of Computer Integrated Manufacturing"},{"issue":"1\u20132","key":"2585_CR10","doi-asserted-by":"publisher","first-page":"70","DOI":"10.1007\/s00170-002-1533-7","volume":"24","author":"PDD Dominic","year":"2004","unstructured":"Dominic, P. D. D., Kaliyamoorthy, S., & Kumar, M. S. (2004). Efficient dispatching rules for dynamic job shop scheduling. International Journal of Advanced Manufacturing Technology, 24(1\u20132), 70\u201375. https:\/\/doi.org\/10.1007\/s00170-002-1533-7","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"2585_CR11","doi-asserted-by":"publisher","first-page":"105607","DOI":"10.1016\/j.eneco.2021.105607","volume":"104","author":"K Dong","year":"2021","unstructured":"Dong, K., Dong, X., Jiang, Q., & Zhao, J. (2021). Assessing energy resilience and its greenhouse effect: A global perspective. Energy Economics, 104, 105607. https:\/\/doi.org\/10.1016\/j.eneco.2021.105607","journal-title":"Energy Economics"},{"issue":"1","key":"2585_CR12","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1109\/3477.484436","volume":"26","author":"M Dorigo","year":"1996","unstructured":"Dorigo, M., Maniezzo, V., & Colorni, A. (1996). Ant system: Optimization by a colony of cooperating agents. IEEE Transactions on Systems Man and Cybernetics Part B: Cybernetics, 26(1), 29\u201341. https:\/\/doi.org\/10.1109\/3477.484436","journal-title":"IEEE Transactions on Systems Man and Cybernetics Part B: Cybernetics"},{"key":"2585_CR13","doi-asserted-by":"publisher","unstructured":"Duyeon, K., & Hyun-Jung, K. (2022). Monte Carlo tree search-based algorithm for dynamic job shop with automated guided vehicles. In Proceedings of the 2022 Winter Simulation Conference (pp. 3310\u20133317). IEEE. https:\/\/doi.org\/10.1109\/WSC57314.2022.10004689","DOI":"10.1109\/WSC57314.2022.10004689"},{"key":"2585_CR14","unstructured":"Fujimoto, S., van Hoof, H., & Meger, D. (2018). Addressing function approximation error in actor-critic methods. Retrieved March 3, 2024, from https:\/\/arxiv.org\/abs\/1802.09477"},{"issue":"3","key":"2585_CR15","doi-asserted-by":"publisher","first-page":"744","DOI":"10.1016\/j.ejor.2015.07.017","volume":"248","author":"C Gahm","year":"2016","unstructured":"Gahm, C., Denz, F., Dirr, M., & Tuma, A. (2016). Energy-efficient scheduling in manufacturing companies: A review and research framework. European Journal of Operational Research, 248(3), 744\u2013757. https:\/\/doi.org\/10.1016\/j.ejor.2015.07.017","journal-title":"European Journal of Operational Research"},{"key":"2585_CR16","doi-asserted-by":"publisher","first-page":"904","DOI":"10.1109\/ACCESS.2018.2838333","volume":"6","author":"K Gao","year":"2019","unstructured":"Gao, K., Cao, Z., Zhang, L., Chen, Z., Han, Y., & Pan, Q. (2019). A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems. Ieee Access: Practical Innovations, Open Solutions, 6, 904\u2013916. https:\/\/doi.org\/10.1109\/ACCESS.2018.2838333","journal-title":"Ieee Access: Practical Innovations, Open Solutions"},{"key":"2585_CR17","doi-asserted-by":"crossref","unstructured":"Garcia, D., Tlahig, H., Bettayeb, B., & Sahnoun, M. (2021). Evaluation of dispatching rules performance for a DJSSP: Towards their application in industry 4.0. In 2021 1st International Conference on Cyber Management and Engineering (CyMaEn). IEEE.","DOI":"10.1109\/CyMaEn50288.2021.9497286"},{"key":"2585_CR18","doi-asserted-by":"publisher","unstructured":"Garza-Santisteban, F., S\u00e1nchez-P\u00e1manes, R., Puente-Rodr\u00edguez, L. A., Amaya, I., Ortiz-Bayliss, J. C., Conant-Pablos, S., & Terashima-Mar\u00edn, H. (2019). A simulated annealing hyper-heuristic for job shop scheduling problems. In 2019 IEEE Congress on Evolutionary Computation (CEC) (pp. 57\u201364). IEEE. https:\/\/doi.org\/10.1109\/CEC.2019.8789851","DOI":"10.1109\/CEC.2019.8789851"},{"key":"2585_CR19","doi-asserted-by":"publisher","first-page":"126","DOI":"10.1016\/j.jmsy.2015.01.003","volume":"37","author":"A Giret","year":"2015","unstructured":"Giret, A., Trentesaux, D., & Prabhu, V. (2015). Sustainability in manufacturing operations scheduling: A state of the Art review. Journal of Manufacturing Systems, 37, 126\u2013140. https:\/\/doi.org\/10.1016\/j.jmsy.2015.01.003","journal-title":"Journal of Manufacturing Systems"},{"issue":"4","key":"2585_CR20","doi-asserted-by":"publisher","first-page":"74","DOI":"10.1287\/inte.20.4.74","volume":"20","author":"F Glover","year":"1990","unstructured":"Glover, F. (1990). Tabu search: A tutorial. Interfaces, 20(4), 74\u201394. https:\/\/doi.org\/10.1287\/inte.20.4.74","journal-title":"Interfaces"},{"key":"2585_CR21","doi-asserted-by":"publisher","first-page":"109276","DOI":"10.1016\/j.cie.2023.109276","volume":"180","author":"Y Gui","year":"2023","unstructured":"Gui, Y., Tang, D., Zhu, H., Zhang, Y., & Zhang, Z. (2023). Dynamic scheduling for flexible job shop using a deep reinforcement learning approach. Computers & Industrial Engineering, 180, 109276. https:\/\/doi.org\/10.1016\/j.cie.2023.109276","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"2585_CR22","doi-asserted-by":"publisher","first-page":"279","DOI":"10.1002\/tie.22286","volume":"65","author":"M Gupta","year":"2023","unstructured":"Gupta, M., & Jauhar, S. K. (2023). Digital innovation: An essence for industry 4.0. Thunderbird International Business Review, 65(3), 279\u2013292. https:\/\/doi.org\/10.1002\/tie.22286","journal-title":"Thunderbird International Business Review"},{"key":"2585_CR23","doi-asserted-by":"publisher","unstructured":"Haarnoja, T., Zhou, A., Abbeel, P., & Levine, S. (2018). Soft actor-critic: Off-policy maximum entropy deep reinforcement learning with a stochastic actor. Retrieved January 15, 2024, from https:\/\/doi.org\/10.1109\/access.2019.2897635","DOI":"10.1109\/access.2019.2897635"},{"issue":"4","key":"2585_CR24","doi-asserted-by":"publisher","first-page":"609","DOI":"10.1162\/EVCO_a_00190","volume":"24","author":"E Hart","year":"2016","unstructured":"Hart, E., & Sim, K. (2016). A hyper-heuristic ensemble method for static job-shop scheduling. Evolutionary Computation, 24(4), 609\u2013635. https:\/\/doi.org\/10.1162\/EVCO_a_00190","journal-title":"Evolutionary Computation"},{"key":"2585_CR26","unstructured":"Herrmann, J. W. (2007). The legacy of Taylor, Gantt, and Johnson: How to improve production scheduling. University of Maryland, Institute for Systems Research. Retrieved December 20, 2023, from http:\/\/hdl.handle.net\/1903\/7674"},{"key":"2585_CR27","doi-asserted-by":"publisher","unstructured":"Hessel, M., Modayil, J., van Hasselt, H., Schaul, T., Ostrovski, G., Dabney, W., Horgan, D., Piot, B., Azar, M., & Silver, D. (2017). Rainbow: Combining improvements in deep reinforcement learning. Retrieved from https:\/\/doi.org\/10.1109\/ACCESS.2019.2897635","DOI":"10.1109\/ACCESS.2019.2897635"},{"issue":"1","key":"2585_CR28","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1038\/scientificamerican0792-66","volume":"267","author":"JH Holland","year":"1992","unstructured":"Holland, J. H. (1992). Genetic algorithms. Scientific American, 267(1), 66\u201373.","journal-title":"Scientific American"},{"key":"2585_CR29","doi-asserted-by":"publisher","first-page":"2493","DOI":"10.1016\/j.ifacol.2022.09.394","volume":"55","author":"E Houda","year":"2022","unstructured":"Houda, E., Hammami, N., Lardeux, B., Hadj-Alouane, A. B., & Jridi, M. (2022). Job shop scheduling: A novel DRL approach for continuous schedule-generation facing real-time job arrivals. IFAC-PapersOnLine, 55, 2493\u20132498. https:\/\/doi.org\/10.1016\/j.ifacol.2022.09.394","journal-title":"IFAC-PapersOnLine"},{"key":"2585_CR30","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.jmsy.2020.02.004","volume":"55","author":"L Hu","year":"2020","unstructured":"Hu, L., Liu, Z., Hu, W., Wang, Y., Tan, J., & Wu, F. (2020). Petri-net-based dynamic scheduling of flexible manufacturing system via deep reinforcement learning with graph convolutional network. Journal of Manufacturing Systems, 55, 1\u201314. https:\/\/doi.org\/10.1016\/j.jmsy.2020.02.004","journal-title":"Journal of Manufacturing Systems"},{"key":"2585_CR31","unstructured":"IBM (2024). What is Industry 4.0? Retrieved March 10, 2024, from https:\/\/www.ibm.com\/topics\/industry-4-0"},{"issue":"4","key":"2585_CR32","doi-asserted-by":"publisher","first-page":"689","DOI":"10.1016\/j.jmsy.2013.05.006","volume":"32","author":"MT Kechadi","year":"2013","unstructured":"Kechadi, M. T., Low, K. S., & Goncalves, G. (2013). Recurrent neural network approach for Cyclic job shop scheduling problem. Journal of Manufacturing Systems, 32(4), 689\u2013699. https:\/\/doi.org\/10.1016\/j.jmsy.2013.05.006","journal-title":"Journal of Manufacturing Systems"},{"key":"2585_CR75","doi-asserted-by":"crossref","unstructured":"Kennedy, J., Eberhart, R. C., & Shi, Y. (2001). Chapter nine \u2013 Applications. In J. Kennedy, R. C. Eberhart, & Y. Shi (Eds.), Swarm intelligence (pp. 369\u2013392). San Francisco: Morgan Kaufmann. Retrieved from https:\/\/www.sciencedirect.com\/science\/article\/pii\/B9781558605954500097","DOI":"10.1016\/B978-155860595-4\/50009-7"},{"key":"2585_CR33","doi-asserted-by":"publisher","unstructured":"Kim, D., & Kim, H. J. (2022). Monte Carlo tree search-based algorithm for dynamic job shop scheduling with automated guided vehicles. In Proceedings of the 2022 Winter Simulation Conference (pp. 3309\u20133317). IEEE. https:\/\/doi.org\/10.1109\/WSC57314.2022.10004709","DOI":"10.1109\/WSC57314.2022.10004709"},{"key":"2585_CR34","doi-asserted-by":"publisher","unstructured":"Lillicrap, T. P., Hunt, J. J., Pritzel, A., Heess, N., Erez, T., Tassa, Y., Silver, D., & Wierstra, D. (2015). Continuous control with deep reinforcement learning. Retrieved from https:\/\/doi.org\/10.1109\/ACCESS.2019.2897635","DOI":"10.1109\/ACCESS.2019.2897635"},{"key":"2585_CR35","doi-asserted-by":"publisher","unstructured":"Luo, B., Wang, S., Yang, B., & Yi, L. (2021a). An improved deep reinforcement learning approach for the dynamic job shop scheduling problem with random job arrivals. In Journal of Physics: Conference Series, 1848, 012020. https:\/\/doi.org\/10.1088\/1742-6596\/1848\/1\/012020","DOI":"10.1088\/1742-6596\/1848\/1\/012020"},{"key":"2585_CR36","doi-asserted-by":"publisher","first-page":"107489","DOI":"10.1016\/j.cie.2021.107489","volume":"159","author":"S Luo","year":"2021","unstructured":"Luo, S., Zhang, L., & Fan, Y. (2021b). Dynamic multi-objective scheduling for flexible job shop by deep reinforcement learning. Computers & Industrial Engineering, 159, 107489. https:\/\/doi.org\/10.1016\/j.cie.2021.107489","journal-title":"Computers & Industrial Engineering"},{"key":"2585_CR76","doi-asserted-by":"publisher","unstructured":"Mahmud, S., Abbasi, A., Chakrabortty, R. K., & Ryan, M. J. (2021). Multi-operator communication based differential evolution with sequential tabu search approach for job shop scheduling problems. Applied Soft Computing, 108, 107511. https:\/\/doi.org\/10.1016\/j.asoc.2021.107511","DOI":"10.1016\/j.asoc.2021.107511"},{"key":"2585_CR38","unstructured":"Miyashita, K. (2000). Job-shop scheduling with genetic programming."},{"key":"2585_CR39","doi-asserted-by":"publisher","unstructured":"Mnih, V., Badia, A. P., Mirza, M., Graves, A., Lillicrap, T. P., Harley, T., Silver, D., & Kavukcuoglu, K. (2016). Asynchronous methods for deep reinforcement learning. Retrieved April 3, 2024, from https:\/\/doi.org\/10.1109\/ACCESS.2019.2897635","DOI":"10.1109\/ACCESS.2019.2897635"},{"issue":"7540","key":"2585_CR40","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1038\/nature14236","volume":"518","author":"V Mnih","year":"2015","unstructured":"Mnih, V., Kavukcuoglu, K., Silver, D., Rusu, A. A., Veness, J., Bellemare, M. G., Graves, A., Riedmiller, M., Fidjeland, A. K., Ostrovski, G., Petersen, S., Beattie, C., Sadik, A., Antonoglou, I., King, H., Kumaran, D., Wierstra, D., Legg, S., & Hassabis, D. (2015). Human-level control through deep reinforcement learning. Nature, 518(7540), 529\u2013533. https:\/\/doi.org\/10.1038\/nature14236","journal-title":"Nature"},{"key":"2585_CR41","doi-asserted-by":"publisher","first-page":"34","DOI":"10.1016\/j.promfg.2019.02.006","volume":"30","author":"J Mohan","year":"2019","unstructured":"Mohan, J., Lanka, K., & Rao, A. N. (2019). A review of dynamic job shop scheduling techniques. Procedia Manufacturing, 30, 34\u201339. https:\/\/doi.org\/10.1016\/j.promfg.2019.02.006","journal-title":"Procedia Manufacturing"},{"issue":"12","key":"2585_CR42","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/00207543.2018.1552038","volume":"57","author":"X Molins","year":"2019","unstructured":"Molins, X., & De Aur\u00e9lio, M. (2019). Scheduling in the industry 4.0: A systematic literature review. International Journal of Production Research, 57(12), 1\u201325. https:\/\/doi.org\/10.1080\/00207543.2018.1552038","journal-title":"International Journal of Production Research"},{"issue":"6","key":"2585_CR37","doi-asserted-by":"publisher","first-page":"3237","DOI":"10.1111\/itor.13158","volume":"29","author":"CRH M\u00e1rquez","year":"2022","unstructured":"M\u00e1rquez, C. R. H., & Ribeiro, C. C. (2022). Shop scheduling in manufacturing environments: A review. International Transactions in Operational Research, 29(6), 3237\u20133293. https:\/\/doi.org\/10.1111\/itor.13158","journal-title":"International Transactions in Operational Research"},{"issue":"1","key":"2585_CR43","doi-asserted-by":"publisher","first-page":"41","DOI":"10.1007\/s40747-017-0034-2","volume":"3","author":"S Nguyen","year":"2017","unstructured":"Nguyen, S., Mei, Y., & Zhang, M. (2017). Genetic programming for production scheduling: A survey with a unified framework. Complex & Intelligent Systems, 3(1), 41\u201366. https:\/\/doi.org\/10.1007\/s40747-017-0034-2","journal-title":"Complex & Intelligent Systems"},{"key":"2585_CR44","doi-asserted-by":"publisher","first-page":"227","DOI":"10.1016\/j.procir.2022.02.224","volume":"106","author":"JC Palacio","year":"2022","unstructured":"Palacio, J. C., Jim\u00e9nez, Y. M., Schietgat, L., Van Doninck, B., & Now\u00e9, A. (2022). A Q-learning algorithm for flexible job shop scheduling in a real-world manufacturing scenario. Procedia CIRP, 106, 227\u2013232. https:\/\/doi.org\/10.1016\/j.procir.2022.02.224","journal-title":"Procedia CIRP"},{"key":"2585_CR45","doi-asserted-by":"publisher","unstructured":"Pinedo, M. L. (2012). Scheduling: Theory, algorithms, and systems. Springer. https:\/\/doi.org\/10.1007\/978-1-4614-2361-4","DOI":"10.1007\/978-1-4614-2361-4"},{"key":"2585_CR46","doi-asserted-by":"publisher","first-page":"107964","DOI":"10.1016\/j.cie.2022.107964","volume":"165","author":"A Prashar","year":"2022","unstructured":"Prashar, A., Tortorella, G. L., & Fogliatto, F. S. (2022). Production scheduling in industry 4.0: Morphological analysis of the literature and future research agenda. Computers & Industrial Engineering, 165, 107964. https:\/\/doi.org\/10.1016\/j.cie.2022.107964","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"2585_CR47","doi-asserted-by":"publisher","first-page":"489","DOI":"10.1007\/s10845-012-0607-2","volume":"25","author":"X Qiu","year":"2014","unstructured":"Qiu, X., & Lau, H. Y. K. (2014). An AIS-based hybrid algorithm for static job shop scheduling problem. Journal of Intelligent Manufacturing, 25(3), 489\u2013503. https:\/\/doi.org\/10.1007\/s10845-012-0607-2","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"2585_CR48","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1016\/j.ejor.2015.05.079","volume":"247","author":"HF Rahman","year":"2015","unstructured":"Rahman, H. F., Sarker, R., & Essam, D. (2015). A real-time order acceptance and scheduling approach for permutation flow shop problems. European Journal of Operational Research, 247(2), 488\u2013503. https:\/\/doi.org\/10.1016\/j.ejor.2015.05.079","journal-title":"European Journal of Operational Research"},{"key":"2585_CR49","unstructured":"Russell, S., & Norvig, P. (2003). Artificial intelligence: A modern approach (2nd ed.). Prentice Hall."},{"key":"2585_CR50","doi-asserted-by":"publisher","unstructured":"Schulman, J., Wolski, F., Dhariwal, P., Radford, A., & Klimov, O. (2017). Proximal policy optimization algorithms. Retrieved January 20, 2024, from https:\/\/doi.org\/10.1109\/ACCESS.2019.2897635","DOI":"10.1109\/ACCESS.2019.2897635"},{"key":"2585_CR51","doi-asserted-by":"publisher","first-page":"107100","DOI":"10.1109\/ACCESS.2022.3212242","volume":"10","author":"X Shao","year":"2022","unstructured":"Shao, X., & Kim, C. S. (2022). An adaptive job shop scheduler using multi-level convolutional neural network and iterative local search. Ieee Access: Practical Innovations, Open Solutions, 10, 107100\u2013107114. https:\/\/doi.org\/10.1109\/ACCESS.2022.3212242","journal-title":"Ieee Access: Practical Innovations, Open Solutions"},{"key":"2585_CR52","doi-asserted-by":"publisher","first-page":"604","DOI":"10.1016\/j.cie.2018.04.023","volume":"125","author":"YR Shiue","year":"2018","unstructured":"Shiue, Y. R., Lee, K. C., & Su, C. T. (2018). Real-time scheduling for a smart factory using a reinforcement learning approach. Computers & Industrial Engineering, 125, 604\u2013614. https:\/\/doi.org\/10.1016\/j.cie.2018.04.023","journal-title":"Computers & Industrial Engineering"},{"key":"2585_CR53","doi-asserted-by":"crossref","unstructured":"Shyalika, C., Silva, T., & Karunananda, A. (2020). Reinforcement learning in dynamic task scheduling: A review (Vol. 1). Springer.","DOI":"10.1007\/s42979-020-00326-5"},{"issue":"2","key":"2585_CR54","doi-asserted-by":"publisher","first-page":"62","DOI":"10.3390\/systems11020062","volume":"11","author":"L Song","year":"2023","unstructured":"Song, L., Xu, Z., Wang, C., & Su, J. (2023). A new decision method of flexible job shop rescheduling based on WOA-SVM. Systems, 11(2), 62. https:\/\/doi.org\/10.3390\/systems11020062","journal-title":"Systems"},{"key":"2585_CR55","unstructured":"Sutton, R. S., & Barto, A. G. (2018). Reinforcement learning: An introduction (2nd ed.). MIT Press."},{"key":"2585_CR56","doi-asserted-by":"publisher","unstructured":"Tassel, P., Gebser, M., & Schekotihin, K. (2021). A reinforcement learning environment for job-shop scheduling. Retrieved February 10, 2024, from https:\/\/doi.org\/10.1109\/ACCESS.2019.2897635","DOI":"10.1109\/ACCESS.2019.2897635"},{"key":"2585_CR57","doi-asserted-by":"publisher","first-page":"109360","DOI":"10.1016\/j.cie.2023.109360","volume":"178","author":"Z Tian","year":"2023","unstructured":"Tian, Z., Jiang, X., Liu, W., & Li, Z. (2023). Dynamic energy-efficient scheduling of multi-variety and small batch flexible job-shop: A case study for the aerospace industry. Computers & Industrial Engineering, 178, 109360. https:\/\/doi.org\/10.1016\/j.cie.2023.109360","journal-title":"Computers & Industrial Engineering"},{"key":"2585_CR58","doi-asserted-by":"publisher","unstructured":"Tselios, D., Savvas, I., & Kechadi, M. T. (2013). RNN modelling for bi-objective MPM job shop scheduling problem. In Proceedings of the 5th International Conference on Computational Intelligence, Communication Systems, and Networks (CICSyN) (pp. 13\u201318). IEEE. https:\/\/doi.org\/10.1109\/CICSYN.2013.14","DOI":"10.1109\/CICSYN.2013.14"},{"issue":"1\u20132","key":"2585_CR59","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1108\/ACI-11-2020-0100","volume":"18","author":"MF Uslu","year":"2022","unstructured":"Uslu, M. F., Uslu, S., & Bulut, F. (2022). An adaptive hybrid approach: Combining genetic algorithm and ant colony optimization for integrated process planning and scheduling. Applied Computing and Informatics, 18(1\u20132), 101\u2013112. https:\/\/doi.org\/10.1108\/ACI-11-2020-0100","journal-title":"Applied Computing and Informatics"},{"key":"2585_CR25","unstructured":"van Hasselt, H. (2010). Double Q-learning. In Advances in Neural Information Processing Systems (pp. 2613\u20132621)."},{"key":"2585_CR60","doi-asserted-by":"publisher","unstructured":"V\u00e1zquez, M., & Whitley, D. (2000). A comparison of genetic algorithms for the static job shop scheduling problem. In M. Schoenauer, et al. (Eds.), Parallel problem solving from nature\u2014PPSN VI (pp. 303\u2013312). Springer. https:\/\/doi.org\/10.1007\/3-540-45356-3_30","DOI":"10.1007\/3-540-45356-3_30"},{"issue":"12","key":"2585_CR61","doi-asserted-by":"publisher","first-page":"8519","DOI":"10.1109\/TII.2022.3177126","volume":"18","author":"GG Wang","year":"2022","unstructured":"Wang, G. G., Gao, D., & Pedrycz, W. (2022). Solving multiobjective fuzzy job-shop scheduling problem by a hybrid adaptive differential evolution algorithm. IEEE Transactions on Industrial Informatics, 18(12), 8519\u20138528. https:\/\/doi.org\/10.1109\/TII.2022.3177126","journal-title":"IEEE Transactions on Industrial Informatics"},{"issue":"19","key":"2585_CR62","doi-asserted-by":"publisher","first-page":"5867","DOI":"10.1080\/00207543.2020.1856433","volume":"59","author":"H Wang","year":"2021","unstructured":"Wang, H., Sarker, B. R., Li, J., & Li, J. (2021a). Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. International Journal of Production Research, 59(19), 5867\u20135883. https:\/\/doi.org\/10.1080\/00207543.2020.1856433","journal-title":"International Journal of Production Research"},{"key":"2585_CR63","doi-asserted-by":"publisher","first-page":"107969","DOI":"10.1016\/j.comnet.2021.107969","volume":"190","author":"L Wang","year":"2021","unstructured":"Wang, L., Hu, X., Wang, Y., Xu, S., Ma, S., Yang, K., Liu, Z., & Wang, W. (2021b). Dynamic job-shop scheduling in smart manufacturing using deep reinforcement learning. Computer Networks, 190, 107969. https:\/\/doi.org\/10.1016\/j.comnet.2021.107969","journal-title":"Computer Networks"},{"key":"2585_CR64","doi-asserted-by":"publisher","unstructured":"Wang, Y. (2021). Flexible job shop scheduling rules mining based on random forest. In Proceedings of the 2021 2nd International Conference on Computing and Data Science (CDS) (pp. 220\u2013226). IEEE. https:\/\/doi.org\/10.1109\/CDS52072.2021.00048","DOI":"10.1109\/CDS52072.2021.00048"},{"issue":"2","key":"2585_CR65","doi-asserted-by":"publisher","first-page":"417","DOI":"10.1007\/s10845-018-1456-7","volume":"31","author":"YF Wang","year":"2020","unstructured":"Wang, Y. F. (2020). Adaptive job shop scheduling strategy based on weighted Q-learning algorithm. Journal of Intelligent Manufacturing, 31(2), 417\u2013432. https:\/\/doi.org\/10.1007\/s10845-018-1456-7","journal-title":"Journal of Intelligent Manufacturing"},{"key":"2585_CR66","doi-asserted-by":"publisher","unstructured":"Wang, Z., Bapst, V., Heess, N., Mnih, V., Munos, R., Kavukcuoglu, K., & de Freitas, N. (2016). Sample efficient actor-critic with experience replay. Retrieved March 25, 2024, from https:\/\/doi.org\/10.1109\/access.2019.2897635","DOI":"10.1109\/access.2019.2897635"},{"key":"2585_CR67","doi-asserted-by":"publisher","first-page":"100586","DOI":"10.1016\/j.swevo.2019.100586","volume":"51","author":"Z Wang","year":"2019","unstructured":"Wang, Z., Zhang, J., & Yang, S. (2019). An improved particle swarm optimization algorithm for dynamic job shop scheduling problems with random job arrivals. Swarm and Evolutionary Computation, 51, 100586. https:\/\/doi.org\/10.1016\/j.swevo.2019.100586","journal-title":"Swarm and Evolutionary Computation"},{"key":"2585_CR68","doi-asserted-by":"crossref","unstructured":"Watkins, C. J. C. H., & Dayan, P. (1992). Q-learning. (vol. 8).","DOI":"10.1023\/A:1022676722315"},{"key":"2585_CR69","doi-asserted-by":"publisher","first-page":"64","DOI":"10.1016\/j.jmsy.2022.04.008","volume":"63","author":"W Weng","year":"2022","unstructured":"Weng, W., Chen, J., Zheng, M., & Fujimura, S. (2022). Realtime scheduling heuristics for just-in-time production in large-scale flexible job shops. Journal of Manufacturing Systems, 63, 64\u201377. https:\/\/doi.org\/10.1016\/j.jmsy.2022.04.008","journal-title":"Journal of Manufacturing Systems"},{"key":"2585_CR70","doi-asserted-by":"publisher","first-page":"105750","DOI":"10.1016\/j.cor.2022.105750","volume":"142","author":"H Xiong","year":"2022","unstructured":"Xiong, H., Shi, S., Ren, D., & Hu, J. (2022). A survey of job shop scheduling problem: The types and models. Computers & Operations Research, 142, 105750. https:\/\/doi.org\/10.1016\/j.cor.2022.105750","journal-title":"Computers & Operations Research"},{"key":"2585_CR71","doi-asserted-by":"publisher","first-page":"146","DOI":"10.1016\/j.jmsy.2020.08.008","volume":"58","author":"M Zhang","year":"2021","unstructured":"Zhang, M., Tao, F., & Nee, A. Y. C. (2021). Digital twin enhanced dynamic job-shop scheduling. Journal of Manufacturing Systems, 58, 146\u2013156. https:\/\/doi.org\/10.1016\/j.jmsy.2020.08.008","journal-title":"Journal of Manufacturing Systems"},{"key":"2585_CR72","doi-asserted-by":"publisher","unstructured":"Zhao, L., Shen, W., Zhang, C., & Peng, K. (2022). An end-to-end deep reinforcement learning approach for job shop scheduling. In 2022 IEEE 25th International Conference on Computer Supported Cooperative Work in Design (CSCWD) (pp. 841\u2013846). IEEE. https:\/\/doi.org\/10.1109\/CSCWD54268.2022.9784802","DOI":"10.1109\/CSCWD54268.2022.9784802"},{"issue":"4","key":"2585_CR73","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s10723-023-09624-6","volume":"21","author":"H Zhou","year":"2023","unstructured":"Zhou, H. (2023). A novel approach to cloud resource management: Hybrid machine learning and task scheduling. Journal of Grid Computing, 21(4), 1\u201325. https:\/\/doi.org\/10.1007\/s10723-023-09624-6","journal-title":"Journal of Grid Computing"},{"issue":"3","key":"2585_CR74","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1177\/16878132221086201","volume":"14","author":"T Zhou","year":"2022","unstructured":"Zhou, T., Zhu, H., Tang, D., Liu, C., Cai, Q., Shi, W., & Gui, Y. (2022). Reinforcement learning for online optimization of job-shop scheduling in a smart manufacturing factory. Advances in Mechanical Engineering, 14(3), 1\u201312. https:\/\/doi.org\/10.1177\/16878132221086201","journal-title":"Advances in Mechanical Engineering"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-025-02585-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10845-025-02585-6","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-025-02585-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,2,24]],"date-time":"2026-02-24T08:48:50Z","timestamp":1771922930000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10845-025-02585-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,3,8]]},"references-count":76,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2026,3]]}},"alternative-id":["2585"],"URL":"https:\/\/doi.org\/10.1007\/s10845-025-02585-6","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,3,8]]},"assertion":[{"value":"10 April 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"19 February 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 March 2025","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflicts of interest\/competing interests"}}]}}