{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,26]],"date-time":"2026-10-26T20:10:48Z","timestamp":1793045448751,"version":"4.5.0"},"reference-count":36,"publisher":"Springer Science and Business Media LLC","issue":"7","license":[{"start":{"date-parts":[[2026,5,8]],"date-time":"2026-05-08T00:00:00Z","timestamp":1778198400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2026,5,8]],"date-time":"2026-05-08T00:00:00Z","timestamp":1778198400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100003246","name":"Nederlandse Organisatie voor Wetenschappelijk Onderzoek","doi-asserted-by":"publisher","award":["17931"],"award-info":[{"award-number":["17931"]}],"id":[{"id":"10.13039\/501100003246","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Manuf"],"published-print":{"date-parts":[[2026,7]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>Optimising productivity of tightly coupled production lines in, for instance, the production printing or semiconductor industry is difficult due to the diversity of products resulting in different product flows, the variety of constraints, and the precise timing required to coordinate multiple tightly coupled machines. A modular setup provides flexibility and cost reduction through reuse of machinery and schedulers. However, the scheduling of a modular production line is challenging as it leads to a distributed decision process where each module has a limited view of the entire system, while local scheduling decisions have a global impact on schedule feasibility. This work proposes a distributed scheduling method for tightly coupled modular sequential production lines where products cannot overtake each other during production. We develop a multi-agent framework in which a system agent propagates timing constraints of the schedulers of different modules. The system agent aims to reach consensus about the handover times of jobs between modules to converge to a globally feasible schedule. The system agent interacts with local agents that interface with local schedulers, allowing the use of existing local schedulers without modification. We illustrate the approach on production lines with multiple re-entrant flow-shop instances with setup times and due dates, which results in a challenging scheduling problem. The performance of the proposed distributed scheduling method is assessed using a monolithic exact scheduler (implemented as a constraint program, not applicable to modular problems) as a reference. It is found to deliver good quality schedules, having only a 1.15 larger makespan on average than the hypothetical optimum provided by the exact scheduler.<\/jats:p>","DOI":"10.1007\/s10845-025-02766-3","type":"journal-article","created":{"date-parts":[[2026,5,8]],"date-time":"2026-05-08T09:42:26Z","timestamp":1778233346000},"page":"2635-2668","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["Modular scheduling of tightly coupled production lines"],"prefix":"10.1007","volume":"37","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2369-0246","authenticated-orcid":false,"given":"Joan","family":"Marc\u00e8 i Igual","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2629-3249","authenticated-orcid":false,"given":"Marc","family":"Geilen","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1052-8437","authenticated-orcid":false,"given":"Mitra","family":"Nasri","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2274-7274","authenticated-orcid":false,"given":"Twan","family":"Basten","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2026,5,8]]},"reference":[{"issue":"4","key":"2766_CR1","doi-asserted-by":"publisher","first-page":"2945","DOI":"10.1007\/s10462-021-10081-5","volume":"55","author":"N Bagheri Rad","year":"2022","unstructured":"Bagheri Rad, N., & Behnamian, J. (2022). Recent trends in distributed production network scheduling problem. Artificial Intelligence Review, 55(4), 2945\u20132995. https:\/\/doi.org\/10.1007\/s10462-021-10081-5","journal-title":"Artificial Intelligence Review"},{"issue":"4","key":"2766_CR2","doi-asserted-by":"publisher","first-page":"253","DOI":"10.1007\/s10951-008-0067-7","volume":"11","author":"E Balas","year":"2008","unstructured":"Balas, E., Simonetti, N., & Vazacopoulos, A. (2008). Job shop scheduling with setup times, deadlines and precedence constraints. Journal of Scheduling, 11(4), 253\u2013262. https:\/\/doi.org\/10.1007\/s10951-008-0067-7","journal-title":"Journal of Scheduling"},{"issue":"9","key":"2766_CR3","doi-asserted-by":"publisher","first-page":"2602","DOI":"10.1080\/00207543.2012.737948","volume":"51","author":"FT Chan","year":"2012","unstructured":"Chan, F. T., Prakash, A., Ma, H., & Wong, C. (2012). A hybrid Tabu sample-sort simulated annealing approach for solving distributed scheduling problem. International Journal of Production Research, 51(9), 2602\u20132619. https:\/\/doi.org\/10.1080\/00207543.2012.737948","journal-title":"International Journal of Production Research"},{"key":"2766_CR4","doi-asserted-by":"crossref","unstructured":"Emmons, H., & Vairaktarakis, G. (2013). Flow shop scheduling. Springer US.","DOI":"10.1007\/978-1-4614-5152-5"},{"key":"2766_CR5","doi-asserted-by":"crossref","unstructured":"Fazlirad, A., & Brennan, R.W. (2018). Multiagent Manufacturing Scheduling: An Updated State of the Art Review. In 2018 IEEE 14th International Conference on Automation Science and Engineering (CASE) (pp. 722\u2013729).","DOI":"10.1109\/COASE.2018.8560576"},{"key":"2766_CR6","doi-asserted-by":"publisher","first-page":"623","DOI":"10.1613\/jair.5565","volume":"61","author":"F Fioretto","year":"2018","unstructured":"Fioretto, F., Pontelli, E., & Yeoh, W. (2018). Distributed constraint optimization problems and applications: A survey. Journal of Artificial Intelligence Research, 61, 623\u2013698. https:\/\/doi.org\/10.1613\/jair.5565","journal-title":"Journal of Artificial Intelligence Research"},{"key":"2766_CR7","unstructured":"Glavic, M. (2006). Agents and Multi-Agent Systems: A Short Introduction for Power Engineers (Tech. Rep.). University of Liege, Electrical Engineering and Computer Science Department. https:\/\/hdl.handle.net\/2268\/209564"},{"issue":"3","key":"2766_CR8","doi-asserted-by":"publisher","first-page":"699","DOI":"10.1016\/j.ejor.2005.02.001","volume":"169","author":"JND Gupta","year":"2006","unstructured":"Gupta, J. N. D., & Stafford, E. F. (2006). Flowshop scheduling research after five decades. European Journal of Operational Research, 169(3), 699\u2013711. https:\/\/doi.org\/10.1016\/j.ejor.2005.02.001","journal-title":"European Journal of Operational Research"},{"key":"2766_CR9","unstructured":"IBM Corporation (2023). IBM\u00aeILOG\u00aeCP Optimizer. https:\/\/www.ibm.com\/products\/ilog-cplex-optimization-studio\/cplex-cp-optimizer"},{"key":"2766_CR10","doi-asserted-by":"publisher","first-page":"72","DOI":"10.1016\/j.cor.2014.02.002","volume":"47","author":"B Jeong","year":"2014","unstructured":"Jeong, B., & Kim, Y. D. (2014). Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times. Computers & Operations Research, 47, 72\u201380. https:\/\/doi.org\/10.1016\/j.cor.2014.02.002","journal-title":"Computers & Operations Research"},{"issue":"1","key":"2766_CR11","doi-asserted-by":"publisher","first-page":"27","DOI":"10.1177\/1063293X02010001054","volume":"10","author":"H Jia","year":"2002","unstructured":"Jia, H., Fuh, J., Nee, A., & Zhang, Y. (2002). Web-based multi-functional scheduling system for a distributed manufacturing environment. Concurrent Engineering, 10(1), 27\u201339. https:\/\/doi.org\/10.1177\/1063293X02010001054","journal-title":"Concurrent Engineering"},{"issue":"2","key":"2766_CR12","doi-asserted-by":"publisher","first-page":"409","DOI":"10.1080\/00207543.2010.539276","volume":"50","author":"A Kouider","year":"2011","unstructured":"Kouider, A., & Bouzouia, B. (2011). Multi-agent job shop scheduling system based on co-operative approach of idle time minimisation. International Journal of Production Research, 50(2), 409\u2013424. https:\/\/doi.org\/10.1080\/00207543.2010.539276","journal-title":"International Journal of Production Research"},{"key":"2766_CR13","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1007\/s10601-018-9281-x","volume":"23","author":"P Laborie","year":"2018","unstructured":"Laborie, P., Rogerie, J., Shaw, P., & Vil\u00edm, P. (2018). IBM ILOG CP optimizer for scheduling: 20+ years of scheduling with constraints at IBM\/ILOG. Constraints, 23, 210\u2013250. https:\/\/doi.org\/10.1007\/s10601-018-9281-x","journal-title":"Constraints"},{"issue":"5","key":"2766_CR14","doi-asserted-by":"publisher","first-page":"208","DOI":"10.1016\/j.ipl.2010.11.021","volume":"111","author":"BMT Lin","year":"2011","unstructured":"Lin, B. M. T., & Hwang, F. J. (2011). Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type. Information Processing Letters, 111(5), 208\u2013212. https:\/\/doi.org\/10.1016\/j.ipl.2010.11.021","journal-title":"Information Processing Letters"},{"key":"2766_CR15","unstructured":"Liu, J., & Sycara, K.P. (1993). Distributed Constraint Satisfaction through Constraint Partition and Coordinated Reaction. Proceedings of the 12th International Workshop on Distributed AI. Hidden Valley, PA."},{"issue":"9","key":"2766_CR16","doi-asserted-by":"publisher","first-page":"3274","DOI":"10.1080\/00207543.2017.1401240","volume":"56","author":"SQ Liu","year":"2018","unstructured":"Liu, S. Q., Kozan, E., Masoud, M., Zhang, Y., & Chan, F. T. (2018). Job shop scheduling with a combination of four buffering constraints. International Journal of Production Research, 56(9), 3274\u20133293. https:\/\/doi.org\/10.1080\/00207543.2017.1401240","journal-title":"International Journal of Production Research"},{"issue":"7","key":"2766_CR17","doi-asserted-by":"publisher","first-page":"2028","DOI":"10.1080\/00207543.2020.1797207","volume":"59","author":"J Lohmer","year":"2021","unstructured":"Lohmer, J., & Lasch, R. (2021). Production planning and scheduling in multi-factory production networks: a systematic literature review. International Journal of Production Research, 59(7), 2028\u20132054. https:\/\/doi.org\/10.1080\/00207543.2020.1797207","journal-title":"International Journal of Production Research"},{"issue":"4","key":"2766_CR18","doi-asserted-by":"publisher","first-page":"257","DOI":"10.1007\/BF00124828","volume":"7","author":"FP Maturana","year":"1996","unstructured":"Maturana, F. P., & Norrie, D. H. (1996). Multi-agent Mediator architecture for distributed manufacturing. Journal of Intelligent Manufacturing, 7(4), 257\u2013270. https:\/\/doi.org\/10.1007\/BF00124828","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"2","key":"2766_CR19","doi-asserted-by":"publisher","first-page":"10785","DOI":"10.1016\/j.ifacol.2020.12.2862","volume":"53","author":"T Miyamoto","year":"2020","unstructured":"Miyamoto, T., Umeda, T., & Takai, S. (2020). Distributed job shop scheduling using consensus alternating direction method of multipliers. IFAC-PapersOnLine, 53(2), 10785\u201310790. https:\/\/doi.org\/10.1016\/j.ifacol.2020.12.2862","journal-title":"IFAC-PapersOnLine"},{"issue":"4","key":"2766_CR20","doi-asserted-by":"publisher","first-page":"754","DOI":"10.1016\/j.cor.2009.06.019","volume":"37","author":"B Naderi","year":"2010","unstructured":"Naderi, B., & Ruiz, R. (2010). The distributed permutation flowshop scheduling problem. Computers & Operations Research, 37(4), 754\u2013768. https:\/\/doi.org\/10.1016\/j.cor.2009.06.019","journal-title":"Computers & Operations Research"},{"key":"2766_CR21","doi-asserted-by":"crossref","unstructured":"Nouri, H.E. , Driss, O.B., & Gh\u00e9dira, K. (2016). A classification schema for the job shop scheduling problem with transportation resources: State-of-the-Art Review. R.\u00a0Silhavy, R.\u00a0Senkerik, Z.K.\u00a0Oplatkova, P.\u00a0Silhavy, & Z.\u00a0Prokopova (Eds.), In Proceedings of Artificial Intelligence Perspectives in Intelligent Systems (pp 1\u201311). Springer International Publishing. Cham.","DOI":"10.1007\/978-3-319-33625-1_1"},{"issue":"2","key":"2766_CR22","doi-asserted-by":"publisher","first-page":"586","DOI":"10.1109\/TASE.2016.2642997","volume":"15","author":"C Pan","year":"2018","unstructured":"Pan, C., Zhou, M., Qiao, Y., & Wu, N. (2018). Scheduling cluster tools in semiconductor manufacturing: recent advances and challenges. IEEE Transactions on Automation Science and Engineering, 15(2), 586\u2013601. https:\/\/doi.org\/10.1109\/TASE.2016.2642997","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"1","key":"2766_CR23","doi-asserted-by":"publisher","first-page":"94","DOI":"10.1109\/TASE.2019.2947398","volume":"18","author":"M Qin","year":"2021","unstructured":"Qin, M., Wang, R., Shi, Z., Liu, L., & Shi, L. (2021). A genetic programming-based scheduling approach for hybrid flow shop with a batch processor and waiting time constraint. IEEE Transactions on Automation Science and Engineering, 18(1), 94\u2013105. https:\/\/doi.org\/10.1109\/TASE.2019.2947398","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"issue":"2","key":"2766_CR24","doi-asserted-by":"publisher","first-page":"105","DOI":"10.1007\/BF00123682","volume":"6","author":"J Riezebos","year":"1995","unstructured":"Riezebos, J., Gaalman, G. J. C., & Gupta, J. N. D. (1995). Flow shop scheduling with multiple operations and time lags. Journal of Intelligent Manufacturing, 6(2), 105\u2013115. https:\/\/doi.org\/10.1007\/BF00123682","journal-title":"Journal of Intelligent Manufacturing"},{"key":"2766_CR25","doi-asserted-by":"publisher","first-page":"42","DOI":"10.1016\/j.asoc.2015.11.034","volume":"40","author":"AP Rifai","year":"2015","unstructured":"Rifai, A. P., Nguyen, H. T., & Dawal, S. Z. M. (2015). Multi-objective adaptive large neighborhood search for distributed reentrant permutation flow shop scheduling. Applied Soft Computing, 40, 42\u201357. https:\/\/doi.org\/10.1016\/j.asoc.2015.11.034","journal-title":"Applied Soft Computing"},{"key":"2766_CR26","doi-asserted-by":"crossref","unstructured":"Sadiku, M.N.O. , Ajayi-Majebi, A.J., & Adebo, P.O. (2023). Distributed Manufacturing. In M.N.O.\u00a0Sadiku, A.J.\u00a0Ajayi-Majebi, P.O.\u00a0Adebo (Eds.), Emerging technologies in manufacturing (pp 175\u2013184). Springer International Publishing. Cham","DOI":"10.1007\/978-3-031-23156-8_12"},{"key":"2766_CR27","doi-asserted-by":"publisher","first-page":"2023","DOI":"10.1007\/s10845-021-01759-2","volume":"327","author":"M Seitz","year":"2021","unstructured":"Seitz, M., Gehlhoff, F., Cruz Salazar, L. A., Fay, A., & Vogel-Heuser, B. (2021). Automation platform independent multi-agent system for robust networks of production resources in industry 4.0. Journal of Intelligent Manufacturing, 327, 2023\u20132041. https:\/\/doi.org\/10.1007\/s10845-021-01759-2","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"18","key":"2766_CR28","doi-asserted-by":"publisher","first-page":"5235","DOI":"10.1080\/00207540903121065","volume":"48","author":"A Toptal","year":"2010","unstructured":"Toptal, A., & Sabuncuoglu, I. (2010). Distributed scheduling: a review of concepts and applications. International Journal of Production Research, 48(18), 5235\u20135262. https:\/\/doi.org\/10.1080\/00207540903121065","journal-title":"International Journal of Production Research"},{"key":"2766_CR29","doi-asserted-by":"crossref","unstructured":"Traganos, K. , Vanderfeesten, I. , Grefen, P. , Erasmus, J. , Gerrits, T., & Verhofstad, W. (2020). End-to-end production process orchestration for smart printing factories: An Application in Industry. In 2020 IEEE 24th International Enterprise Distributed Object Computing Conference (EDOC). (pp. 155\u2013164) Eindhoven, NetherlandsIEEE.","DOI":"10.1109\/EDOC49727.2020.00027"},{"key":"2766_CR30","doi-asserted-by":"crossref","unstructured":"van\u00a0der Tempel, R. , van Pinxten, J. , Geilen, M., & Waqas, U. (2018). A heuristic for variable re-entrant scheduling problems. In Euromicro conference on digital system design (DSD) (Vol 2018, pp. 336\u2013341).","DOI":"10.1109\/DSD.2018.00065"},{"key":"2766_CR31","doi-asserted-by":"publisher","unstructured":"van Pinxten, J. , Waqas, U. , Geilen, M. , Basten, T.,& Somers, L. (2017). Online scheduling of 2-re-entrant flexible manufacturing systems. ACM Transactions on Embedded Computing Systems, 165 https:\/\/doi.org\/10.1145\/3126551","DOI":"10.1145\/3126551"},{"key":"2766_CR32","doi-asserted-by":"crossref","unstructured":"Waqas, U. , Geilen, M. , Kandelaars, J. , Somers, L. , Basten, T. , Stuijk, S., & Corporaal, H. (2015). A re-entrant flowshop heuristic for online scheduling of the paper path in a large scale printer. In Design, automation & test in europe conference & exhibition (DATE) . IEEE Conference Publications. (pp. 573\u2013578). USA","DOI":"10.7873\/DATE.2015.0519"},{"issue":"1","key":"2766_CR33","doi-asserted-by":"publisher","first-page":"115","DOI":"10.1080\/02522667.2008.10699794","volume":"29","author":"C Yang","year":"2008","unstructured":"Yang, C., Chang, C. J., & Chou, Y. C. (2008). Selection criteria for equipment vendors by wafer foundry in Taiwan. Journal of Information and Optimization Sciences, 29(1), 115\u2013128. https:\/\/doi.org\/10.1080\/02522667.2008.10699794","journal-title":"Journal of Information and Optimization Sciences"},{"issue":"11","key":"2766_CR34","doi-asserted-by":"publisher","first-page":"3217","DOI":"10.1080\/00207543.2016.1268730","volume":"55","author":"C Zhang","year":"2017","unstructured":"Zhang, C., Shi, Z., Huang, Z., Wu, Y., & Shi, L. (2017). Flow shop scheduling with a batch processor and limited buffer. International Journal of Production Research, 55(11), 3217\u20133233. https:\/\/doi.org\/10.1080\/00207543.2016.1268730","journal-title":"International Journal of Production Research"},{"issue":"23","key":"2766_CR35","doi-asserted-by":"publisher","first-page":"7043","DOI":"10.1080\/00207543.2016.1194535","volume":"54","author":"J Zhang","year":"2016","unstructured":"Zhang, J., & Wang, X. (2016). Multi-agent-based hierarchical collaborative scheduling in re-entrant manufacturing systems. International Journal of Production Research, 54(23), 7043\u20137059. https:\/\/doi.org\/10.1080\/00207543.2016.1194535","journal-title":"International Journal of Production Research"},{"issue":"1","key":"2766_CR36","doi-asserted-by":"publisher","first-page":"78","DOI":"10.22034\/2017.1.06","volume":"4","author":"M Ziaee","year":"2017","unstructured":"Ziaee, M. (2017). Modeling and solving the distributed and flexible job shop scheduling problem with WIPs supply planning and bounded processing times. International Journal of Supply and Operations Management, 4(1), 78\u201389. https:\/\/doi.org\/10.22034\/2017.1.06","journal-title":"International Journal of Supply and Operations Management"}],"container-title":["Journal of Intelligent Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-025-02766-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10845-025-02766-3","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10845-025-02766-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,6,24]],"date-time":"2026-06-24T04:57:39Z","timestamp":1782277059000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10845-025-02766-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,5,8]]},"references-count":36,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2026,7]]}},"alternative-id":["2766"],"URL":"https:\/\/doi.org\/10.1007\/s10845-025-02766-3","relation":{},"ISSN":["0956-5515","1572-8145"],"issn-type":[{"value":"0956-5515","type":"print"},{"value":"1572-8145","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,5,8]]},"assertion":[{"value":"8 March 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"26 June 2025","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"8 May 2026","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors have no conflict of interest to declare that are relevant to the content of this article.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}]}}