{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,5]],"date-time":"2026-04-05T09:42:29Z","timestamp":1775382149617,"version":"3.50.1"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[2014,9,16]],"date-time":"2014-09-16T00:00:00Z","timestamp":1410825600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Robot Syst"],"published-print":{"date-parts":[[2015,8]]},"DOI":"10.1007\/s10846-014-0115-9","type":"journal-article","created":{"date-parts":[[2014,9,15]],"date-time":"2014-09-15T06:53:36Z","timestamp":1410764016000},"page":"537-547","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["A Dynamic Erection Simulation Model of Column-Beam Structures Using Composite Precast Concrete Components"],"prefix":"10.1007","volume":"79","author":[{"given":"Sungho","family":"Lee","sequence":"first","affiliation":[]},{"given":"Won Kee","family":"Hong","sequence":"additional","affiliation":[]},{"given":"Chaeyeon","family":"Lim","sequence":"additional","affiliation":[]},{"given":"Sunkuk","family":"Kim","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,9,16]]},"reference":[{"issue":"3","key":"115_CR1","doi-asserted-by":"crossref","first-page":"301","DOI":"10.5345\/JKIC.2011.06.3.301","volume":"11","author":"SH Lee","year":"2011","unstructured":"Lee, S.H., Kim, S.E., Kim, G.H., Joo, J.K., Kim, S.K.: Analysis of structural work scheduling of green frame. J. Kor. Inst. Build. Constr. 11(3), 301\u2013309 (2011)","journal-title":"J. Kor. Inst. Build. Constr."},{"issue":"3","key":"115_CR2","first-page":"34","volume":"13","author":"JK Joo","year":"2012","unstructured":"Joo, J.K., Kim, S.E., Lee, G.J., Kim, S.K., Lee, S.H.: A study on the lifting progress for composite precast concrete members of green frame. J. Constr. Eng. Manag. 13(3), 34\u201342 (2012)","journal-title":"J. Constr. Eng. Manag."},{"issue":"4","key":"115_CR3","doi-asserted-by":"crossref","first-page":"415","DOI":"10.5345\/JKIBC.2012.12.4.415","volume":"12","author":"KH Kim","year":"2012","unstructured":"Kim, K.H., Lee, T.O., Lee, S.H., Kim, S.K.: Comparative analysis of column connection characteristics of green frame. J. Kor. Inst. Build. Constr. 12(4), 415\u2013425 (2012)","journal-title":"J. Kor. Inst. Build. Constr."},{"issue":"4","key":"115_CR4","first-page":"12","volume":"3","author":"SH Lee","year":"2013","unstructured":"Lee, S.H., Park, J.Y., Lim, C.Y., Kim, S.K.: Constructability analysis of green column at the low moment zone. J. Constr. Eng. Proj. Manag. 3(4), 12\u201319 (2013)","journal-title":"J. Constr. Eng. Proj. Manag."},{"issue":"1","key":"115_CR5","doi-asserted-by":"crossref","first-page":"150","DOI":"10.1177\/1420326X11423162","volume":"21","author":"SH Lee","year":"2012","unstructured":"Lee, S.H., Joo, J.K., Kim, J.T., Kim, S.K.: An analysis of the CO 2 reduction effect of a column-beam structure using composite precast. Indoor Built Environ. 21(1), 150\u2013162 (2012)","journal-title":"Indoor Built Environ."},{"key":"115_CR6","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/S0360-1323(98)00004-3","volume":"34","author":"DG Proverbs","year":"1999","unstructured":"Proverbs, D.G., Holt, G.D., Olomolaiye, P.O.: Factors impacting construction project duration: a comparison between France, Germany and the UK. Build. Environ. 34, 197\u2013204 (1999)","journal-title":"Build. Environ."},{"key":"115_CR7","first-page":"1","volume-title":"Analysis of the carbon dioxide emission used in the transportation of precast concrete members. In: Proceedings of the Thirteenth International Conference on Civil, Structural and Environmental Engineering Computing","author":"CY Lim","year":"2011","unstructured":"Lim, C.Y., Lee, S.H., Lee, G.J., Kim, S.K.: Analysis of the carbon dioxide emission used in the transportation of precast concrete members. In: Proceedings of the Thirteenth International Conference on Civil, Structural and Environmental Engineering Computing, pp. 1\u201312. Civil-Comp Press, Stirlingshire (2011)"},{"issue":"10","key":"115_CR8","first-page":"177","volume":"27","author":"TK Lim","year":"2011","unstructured":"Lim, T.K., Son, C.B., Lee, D.E.: Task based simulation model for steel erection using tier construction method. Archit. Inst. Kor. 27 (10), 177\u2013188 (2011)","journal-title":"Archit. Inst. Kor."},{"issue":"7","key":"115_CR9","first-page":"137","volume":"25","author":"JH Son","year":"2009","unstructured":"Son, J.H., Seok, H.S., Lee, S.H., Park, J.W.: Simu- lation analysis of productivity and economic efficiency of the pc and steel structures according to the beam-column type. Archit. Inst. Kor. 25(7), 137\u2013144 (2009)","journal-title":"Archit. Inst. Kor."},{"issue":"8","key":"115_CR10","doi-asserted-by":"crossref","first-page":"31","DOI":"10.5345\/JKIC.2009.9.2.031","volume":"9","author":"YK Huh","year":"2009","unstructured":"Huh, Y.K., Lee, J.Y., Yun, S.H., Tae, Y.H., Ahn, B.R.: Productivity measurement and analysis on factors in steel erection. Kor. Inst. Build. Constr. 9(8), 31\u201338 (2009)","journal-title":"Kor. Inst. Build. Constr."},{"key":"115_CR11","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.autcon.2010.07.005","volume":"20","author":"MS Park","year":"2011","unstructured":"Park, M.S., Kim, W.Y., Lee, H.S., Han, S.W.: Supply chain management model for ready mixed concrete. Autom. Constr. 20, 44\u201355 (2011)","journal-title":"Autom. Constr."},{"key":"115_CR12","doi-asserted-by":"crossref","unstructured":"Hong, W.K., Lee, G.J., Lee, S.H., Kim, S.K.: Algorithms for in-situ production of composite precast concrete members. Autom. Constr. doi: 10.1016\/j.autcon.2014.02.005 (2014)","DOI":"10.1016\/j.autcon.2014.02.005"},{"issue":"2","key":"115_CR13","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1061\/(ASCE)0887-3801(1998)12:2(101)","volume":"12","author":"W Ng","year":"1998","unstructured":"Ng, W., Khor, E., Tiong, L., Lee, J.: Simulation modeling and management of large basement construction project. J. Comput. Civil Eng. 12(2), 101\u2013110 (1998)","journal-title":"J. Comput. Civil Eng."},{"issue":"7","key":"115_CR14","first-page":"115","volume":"21","author":"ES Lee","year":"2005","unstructured":"Lee, E.S.: A study on the production system and assemble process of steel construction in Japanese job site. Archit. Inst. Kor. 21(7), 115\u2013122 (2005)","journal-title":"Archit. Inst. Kor."},{"issue":"1","key":"115_CR15","first-page":"169","volume":"27","author":"SG Kang","year":"2011","unstructured":"Kang, S.G., Hyun, C.T., Ji, S.M., Yu, J.H.: A productivity analysis of steel structure erection activity based on working crew. Archit. Inst. Kor. 27(1), 169\u2013177 (2011)","journal-title":"Archit. Inst. Kor."},{"issue":"1","key":"115_CR16","doi-asserted-by":"crossref","first-page":"73","DOI":"10.5345\/JKIC.2010.10.1.073","volume":"10","author":"SL Jeong","year":"2010","unstructured":"Jeong, S.L., Cho, K.M., Hyun, C.T.: A study on the produc- tivity analysis of deck plate installation work in steel structure construction. J. Kor. Inst. Build. Constr. 10(1), 73\u201379 (2010)","journal-title":"J. Kor. Inst. Build. Constr."},{"key":"115_CR17","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1080\/01446198400000021","volume":"2","author":"J Bennet","year":"1984","unstructured":"Bennet, J., Ormerod, R.N.: Simulation applied to construction project. Constr. Manag. Econ. 2, 225\u2013263 (1984)","journal-title":"Constr. Manag. Econ."},{"issue":"5","key":"115_CR18","doi-asserted-by":"crossref","first-page":"501","DOI":"10.5345\/JKIBC.2011.11.5.501","volume":"11","author":"CY Lim","year":"2011","unstructured":"Lim, C.Y., Joo, J.K., Lee, G.J., Kim, S.K.: In-situ producti- on analysis of composite precast concrete members of green frame. J. Kor. Inst. Build. Constr. 11(5), 501\u2013514 (2011)","journal-title":"J. Kor. Inst. Build. Constr."}],"container-title":["Journal of Intelligent &amp; Robotic Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10846-014-0115-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10846-014-0115-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10846-014-0115-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:20:43Z","timestamp":1559254843000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10846-014-0115-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,16]]},"references-count":18,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[2015,8]]}},"alternative-id":["115"],"URL":"https:\/\/doi.org\/10.1007\/s10846-014-0115-9","relation":{},"ISSN":["0921-0296","1573-0409"],"issn-type":[{"value":"0921-0296","type":"print"},{"value":"1573-0409","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,16]]}}}