{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T15:07:14Z","timestamp":1777648034809,"version":"3.51.4"},"reference-count":64,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[2014,9,28]],"date-time":"2014-09-28T00:00:00Z","timestamp":1411862400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Robot Syst"],"published-print":{"date-parts":[[2015,8]]},"DOI":"10.1007\/s10846-014-0116-8","type":"journal-article","created":{"date-parts":[[2014,9,26]],"date-time":"2014-09-26T23:36:50Z","timestamp":1411774610000},"page":"417-432","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":135,"title":["Integrating BIM and LiDAR for Real-Time Construction Quality Control"],"prefix":"10.1007","volume":"79","author":[{"given":"Jun","family":"Wang","sequence":"first","affiliation":[]},{"given":"Weizhuo","family":"Sun","sequence":"additional","affiliation":[]},{"given":"Wenchi","family":"Shou","sequence":"additional","affiliation":[]},{"given":"Xiangyu","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Changzhi","family":"Wu","sequence":"additional","affiliation":[]},{"given":"Heap-Yih","family":"Chong","sequence":"additional","affiliation":[]},{"given":"Yan","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Cenfei","family":"Sun","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,9,28]]},"reference":[{"issue":"2","key":"116_CR1","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/j.autcon.2005.01.008","volume":"15","author":"B Akinci","year":"2006","unstructured":"Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K.: A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 15 (2), 124\u2013138 (2006)","journal-title":"Autom. Constr."},{"issue":"6","key":"116_CR2","doi-asserted-by":"crossref","first-page":"814","DOI":"10.1016\/j.autcon.2009.03.005","volume":"18","author":"A Dong","year":"2009","unstructured":"Dong, A., Maher, M.L., Kim, M.J., Gu, N., Wang, X.: Construction defect management using a telematic digital workbench. Autom. Constr. 18 (6), 814\u2013824 (2009)","journal-title":"Autom. Constr."},{"key":"116_CR3","unstructured":"Patterson, L., Ledbetter, W.: The cost of quality: A management tool. Excellence in the Constructed Project, ASCE (1989)"},{"issue":"6","key":"116_CR4","doi-asserted-by":"crossref","first-page":"681","DOI":"10.1016\/S0926-5805(98)00114-9","volume":"8","author":"P-E Josephson","year":"1999","unstructured":"Josephson, P.-E., Hammarlund, Y.: The causes and costs of defects in construction: A study of seven building projects. Autom. Constr. 8 (6), 681\u2013687 (1999)","journal-title":"Autom. Constr."},{"key":"116_CR5","unstructured":"Tang, P., Anil, E., Akinci, B., Huber, D.: Efficient and Effective Quality Assessment of As-Is Building Information Models and 3D Laser-Scanned Data. Computing in Civil Engineering (2011). Am. Soc. Civ. Eng., 486\u2013493 (2011)"},{"issue":"3","key":"116_CR6","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433","volume":"138","author":"B Becerik-Gerber","year":"2012","unstructured":"Becerik-Gerber, B., Jazizadeh, F., Li, N., Calis, G.: Application Areas and Data Requirements for BIM-Enabled Facilities Management. J. Constr. Eng. Manag. 138 (3), 431\u2013442 (2012)","journal-title":"J. Constr. Eng. Manag."},{"key":"116_CR7","doi-asserted-by":"crossref","first-page":"2217","DOI":"10.4028\/www.scientific.net\/AMM.226-228.2217","volume":"226-228","author":"QC Cheng Shuang Sun","year":"2012","unstructured":"Cheng Shuang Sun, Q. C.: BIM-Based Real-Time Monitoring of the Equipment Maintenance of Property. Appl. Mech. Mater. 226-228, 2217\u20132221 (2012). (Vibration, Structural Engineering and Measurement II)","journal-title":"Appl. Mech. Mater."},{"key":"116_CR8","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.autcon.2012.10.012","volume":"34","author":"X Wang","year":"2012","unstructured":"Wang, X., Love, P.E.D., Kim, M.J., Park, C.-S., Sing, C.-P., Hou, L.: A conceptual framework for integrating building information modeling with augmented reality. Autom. Constr. 34, 37\u201344 (2012)","journal-title":"Autom. Constr."},{"key":"116_CR9","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.autcon.2012.09.008","volume":"29","author":"I Motawa","year":"2013","unstructured":"Motawa, I., Almarshad, A.: A knowledge-based BIM system for building maintenance. Autom. Constr. 29, 173\u2013182 (2013)","journal-title":"Autom. Constr."},{"issue":"4","key":"116_CR10","first-page":"1959","volume":"38","author":"P Gamba","year":"2000","unstructured":"Gamba, P., Houshmand, B.: Digital surface models and building extraction: a comparison of IFSAR and LIDAR data. Geoscience and Remote Sensing. IEEE Trans. 38(4), 1959\u20131968 (2000)","journal-title":"IEEE Trans."},{"issue":"2","key":"116_CR11","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/S0198-9715(99)00047-2","volume":"24","author":"G Priestnall","year":"2000","unstructured":"Priestnall, G., Jaafar, J., Duncan, A.: Extracting urban features from LiDAR digital surface models. Comput. Environ. Urban. Syst. 24(2), 65\u201378 (2000)","journal-title":"Comput. Environ. Urban. Syst."},{"issue":"3\/W13","key":"116_CR12","first-page":"174","volume":"34","author":"F Rottensteiner","year":"2003","unstructured":"Rottensteiner, F., Briese, C.: Automatic generation of building models from LIDAR data and the integration of aerial images. International Archives of the Photogrammetry. Remote. Sens. Spat. Inf. Sci. ISPRS 34 (3\/W13), 174\u2013180 (2003)","journal-title":"Remote. Sens. Spat. Inf. Sci. ISPRS"},{"key":"116_CR13","doi-asserted-by":"crossref","first-page":"507","DOI":"10.1016\/j.autcon.2013.06.003","volume":"35","author":"EB Anil","year":"2013","unstructured":"Anil, E.B., Tang, P., Akinci, B., Huber, D.: Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data. Autom. Constr. 35, 507\u2013516 (2013)","journal-title":"Autom. Constr."},{"issue":"4","key":"116_CR14","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1016\/S0263-7863(96)00076-2","volume":"15","author":"D Arditi","year":"1997","unstructured":"Arditi, D., Gunaydin, H.M.: Total quality management in the construction process. Int. J. Proj. Manag. 15(4), 235\u2013243 (1997)","journal-title":"Int. J. Proj. Manag."},{"issue":"4","key":"116_CR15","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1080\/14783361003606795","volume":"21","author":"RY-Y Hung","year":"2010","unstructured":"Hung, R.Y.-Y., Lien, B.Y.-H., Fang, S.-C., McLean, G.N.: Knowledge as a facilitator for enhancing innovation performance through total quality management. Total Qual. Manag. 21(4), 425\u2013438 (2010)","journal-title":"Total Qual. Manag."},{"issue":"2","key":"116_CR16","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1061\/(ASCE)0733-9364(2002)128:2(164)","volume":"128","author":"M Battikha","year":"2002","unstructured":"Battikha, M.: QUALICON: Computer-Based System for Construction Quality Management. J. Constr. Eng. Manag. 128(2), 164\u2013173 (2002)","journal-title":"J. Constr. Eng. Manag."},{"issue":"4","key":"116_CR17","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1016\/j.autcon.2007.08.005","volume":"17","author":"L-C Wang","year":"2008","unstructured":"Wang, L.-C.: Enhancing construction quality inspection and management using RFID technology. Autom. Constr. 17(4), 467\u2013479 (2008)","journal-title":"Autom. Constr."},{"issue":"11","key":"116_CR18","doi-asserted-by":"crossref","first-page":"3406","DOI":"10.1007\/s11431-009-0343-6","volume":"52","author":"D Zhong","year":"2009","unstructured":"Zhong, D., Cui, B., Liu, D., Tong, D.: Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam. Sci. China. Ser. E: Technol. Sci. 52(11), 3406\u20133412 (2009)","journal-title":"Sci. China. Ser. E: Technol. Sci."},{"issue":"1","key":"116_CR19","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/j.autcon.2007.03.002","volume":"17","author":"F Boukamp","year":"2007","unstructured":"Boukamp, F., Akinci, B.: Automated processing of construction specifications to support inspection and quality control. Autom. Constr. 17(1), 90\u2013106 (2007)","journal-title":"Autom. Constr."},{"issue":"1","key":"116_CR20","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/S0926-5805(99)00044-8","volume":"10","author":"R Navon","year":"2000","unstructured":"Navon, R.: Process and quality control with a video camera, for a floor-tilling robot. Autom. Constr. 10(1), 113\u2013125 (2000)","journal-title":"Autom. Constr."},{"issue":"4","key":"116_CR21","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1016\/j.autcon.2004.09.006","volume":"14","author":"R Navon","year":"2005","unstructured":"Navon, R.: Automated project performance control of construction projects. Autom. Constr. 14(4), 467\u2013476 (2005)","journal-title":"Autom. Constr."},{"issue":"6","key":"116_CR22","doi-asserted-by":"crossref","first-page":"749","DOI":"10.1016\/j.autcon.2008.02.003","volume":"17","author":"S-W Leung","year":"2008","unstructured":"Leung, S.-W., Mak, S., Lee, B.L.: Using a real-time integrated communication system to monitor the progress and quality of construction works. Autom. Constr. 17(6), 749\u2013757 (2008)","journal-title":"Autom. Constr."},{"issue":"5","key":"116_CR23","doi-asserted-by":"crossref","first-page":"649","DOI":"10.1016\/j.autcon.2010.12.008","volume":"20","author":"B Becerik-Gerber","year":"2011","unstructured":"Becerik-Gerber, B., Jazizadeh, F., Kavulya, G., Calis, G.: Assessment of target types and layouts in 3D laser scanning for registration accuracy. Autom. Constr. 20(5), 649\u2013658 (2011)","journal-title":"Autom. Constr."},{"key":"116_CR24","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/j.autcon.2012.10.006","volume":"31","author":"X Xiong","year":"2013","unstructured":"Xiong, X., Adan, A., Akinci, B., Huber, D.: Automatic creation of semantically rich 3D building models from laser scanner data. Autom. Constr. 31, 325\u2013337 (2013)","journal-title":"Autom. Constr."},{"issue":"4","key":"116_CR25","doi-asserted-by":"crossref","first-page":"456","DOI":"10.1016\/j.aei.2010.06.006","volume":"24","author":"I Brilakis","year":"2010","unstructured":"Brilakis, I., Lourakis, M., Sacks, R., Savarese, S., Christodoulou, S., Teizer, J., Makhmalbaf, A.: Toward automated generation of parametric BIMs based on hybrid video and laser scanning data. Adv. Eng. Inform. 24(4), 456\u2013465 (2010)","journal-title":"Adv. Eng. Inform."},{"issue":"6","key":"116_CR26","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(311)","volume":"23","author":"F Bosche","year":"2009","unstructured":"Bosche, F., Haas, C., Akinci, B.: Automated Recognition of 3D CAD Objects in Site Laser Scans for Project 3D Status Visualization and Performance Control. J. Comput. Civ. Eng. 23(6), 311\u2013318 (2009)","journal-title":"J. Comput. Civ. Eng."},{"key":"116_CR27","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1016\/S1007-0214(08)70140-8","volume":"1","author":"S Li","year":"2008","unstructured":"Li, S., Isele, J., Bretthauer, G.: Proposed Methodology for Generation of Building Information Model with Laserscanning. Tsinghua Sci. Technol. 13, Suppl. 1, 138\u2013144 (2008)","journal-title":"Tsinghua Sci. Technol. 13, Suppl."},{"key":"116_CR28","doi-asserted-by":"crossref","unstructured":"Mill, T., Alt, A., Liias, R.: Combined 3D building surveying techniques\u2013terrestrial laser scanning (TLS) and total station surveying for BIM data management purposes. J. Civ. Eng. Manag.(ahead-of-print), 1\u201310 (2013)","DOI":"10.3846\/13923730.2013.795187"},{"key":"116_CR29","doi-asserted-by":"crossref","unstructured":"Murphy, M., McGovern, E., Pavia, S.: Historic Building Information Modelling \u2013 Adding intelligence to laser and image based surveys of European classical architecture. ISPRS J. Photogramm. Remote. Sens. 76, 89\u2013102 (2013)","DOI":"10.1016\/j.isprsjprs.2012.11.006"},{"issue":"1","key":"116_CR30","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/j.aei.2011.08.009","volume":"26","author":"F Bosch\u00e9","year":"2012","unstructured":"Bosch\u00e9, F.: Plane-based registration of construction laser scans with 3D\/4D building models. Adv. Eng. Inform. 26(1), 90\u2013102 (2012)","journal-title":"Adv. Eng. Inform."},{"key":"116_CR31","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/j.autcon.2011.09.006","volume":"22","author":"P Tang","year":"2012","unstructured":"Tang, P., Akinci, B.: Formalization of workflows for extracting bridge surveying goals from laser-scanned data. Autom. Constr. 22, 306\u2013319 (2012)","journal-title":"Autom. Constr."},{"issue":"1","key":"116_CR32","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/j.aei.2009.08.006","volume":"24","author":"F Bosch\u00e9","year":"2010","unstructured":"Bosch\u00e9, F.: Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction. Adv. Eng. Inform. 24(1), 107\u2013118 (2010)","journal-title":"Adv. Eng. Inform."},{"issue":"9","key":"116_CR33","first-page":"2523","volume":"44","author":"Z Keqi","year":"2006","unstructured":"Keqi, Z., Jianhua, Y., Shu-Ching, C.: Automatic Construction of Building Footprints From Airborne LIDAR Data. Geoscience and Remote Sensing. IEEE Trans. 44(9), 2523\u20132533 (2006)","journal-title":"IEEE Trans."},{"issue":"6","key":"116_CR34","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1109\/MCG.2003.1242381","volume":"23","author":"F Rottensteiner","year":"2003","unstructured":"Rottensteiner, F.: IEEE Comput. Graph. Appl. 23(6), 42\u201350 (2003)","journal-title":"IEEE Comput. Graph. Appl."},{"key":"116_CR35","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.isprsjprs.2013.05.006","volume":"83","author":"M Awrangjeb","year":"2013","unstructured":"Awrangjeb, M., Zhang, C., Fraser, C.S.: Automatic extraction of building roofs using LIDAR data and multispectral imagery. ISPRS J. Photogramm. Remote. Sens. 83, 1\u201318 (2013)","journal-title":"ISPRS J. Photogramm. Remote. Sens."},{"key":"116_CR36","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1016\/j.isprsjprs.2013.11.001","volume":"87","author":"J Niemeyer","year":"2014","unstructured":"Niemeyer, J., Rottensteiner, F., Soergel, U.: Contextual classification of lidar data and building object detection in urban areas. ISPRS J. Photogramm. Remote. Sens. 87, 152\u2013165 (2014)","journal-title":"ISPRS J. Photogramm. Remote. Sens."},{"issue":"2","key":"116_CR37","first-page":"19","volume":"14","author":"TC Palmer","year":"2002","unstructured":"Palmer, T.C., Shan, J.: Comparative study on urban visualization using LIDAR data in GIS. URISA J. 14(2), 19\u201325 (2002)","journal-title":"URISA J."},{"issue":"4","key":"116_CR38","doi-asserted-by":"crossref","first-page":"473","DOI":"10.1007\/s10666-007-9115-5","volume":"13","author":"K Omasa","year":"2008","unstructured":"Omasa, K., Hosoi, F., Uenishi, T., Shimizu, Y., Akiyama, Y.: Three-dimensional modeling of an urban park and trees by combined airborne and portable on-ground scanning LIDAR remote sensing. Environ. Model. Assess. 13(4), 473\u2013481 (2008)","journal-title":"Environ. Model. Assess."},{"issue":"6","key":"116_CR39","doi-asserted-by":"crossref","first-page":"330","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(330)","volume":"23","author":"T Hinks","year":"2009","unstructured":"Hinks, T., Carr, H., Laefer, D.F.: Flight optimization algorithms for aerial LiDAR capture for urban infrastructure model generation. J. Comput. Civ. Eng. 23(6), 330\u2013339 (2009)","journal-title":"J. Comput. Civ. Eng."},{"key":"116_CR40","unstructured":"Blaikie, N.: Designing Social Research: The Logic of Anticipation. Polity, UK (2009)"},{"issue":"10","key":"116_CR41","doi-asserted-by":"crossref","first-page":"1195","DOI":"10.1016\/j.conengprac.2011.06.010","volume":"19","author":"K Alexis","year":"2011","unstructured":"Alexis, K., Nikolakopoulos, G., Tzes, A.: Switching model predictive attitude control for a quadrotor helicopter subject to atmospheric disturbances. Control. Eng. Pract. 19(10), 1195\u20131207 (2011)","journal-title":"Control. Eng. Pract."},{"issue":"1","key":"116_CR42","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1109\/TNN.2009.2034145","volume":"21","author":"T Dierks","year":"2010","unstructured":"Dierks, T., Jagannathan, S.: Output feedback control of a quadrotor UAV using neural networks. Neural Netw., IEEE Trans. 21(1), 50\u201366 (2010)","journal-title":"Neural Netw., IEEE Trans."},{"issue":"1-2","key":"116_CR43","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1007\/s10846-009-9331-0","volume":"56","author":"A Das","year":"2009","unstructured":"Das, A., Lewis, F., Subbarao, K.: Backstepping approach for controlling a quadrotor using lagrange form dynamics. J. Intell. Robot. Syst. 56(1-2), 127\u2013151 (2009)","journal-title":"J. Intell. Robot. Syst."},{"issue":"2","key":"116_CR44","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1007\/s10846-010-9416-9","volume":"60","author":"ID Cowling","year":"2010","unstructured":"Cowling, I.D., Yakimenko, O.A., Whidborne, J.F., Cooke, A.K.: Direct method based control system for an autonomous quadrotor. J. Intell. Robot. Syst. 60(2), 285\u2013316 (2010)","journal-title":"J. Intell. Robot. Syst."},{"issue":"1","key":"116_CR45","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/j.automatica.2009.10.018","volume":"46","author":"GV Raffo","year":"2010","unstructured":"Raffo, G.V., Ortega, M.G., Rubio, F.R.: An integral predictive\/nonlinear H \u221e $\\infty $ control structure for a quadrotor helicopter. Automatica 46(1), 29\u201339 (2010)","journal-title":"Automatica"},{"issue":"9","key":"116_CR46","doi-asserted-by":"crossref","first-page":"1023","DOI":"10.1016\/j.conengprac.2011.04.005","volume":"19","author":"GM Hoffmann","year":"2011","unstructured":"Hoffmann, G.M., Huang, H., Waslander, S.L., Tomlin, C.J.: Precision flight control for a multi-vehicle quadrotor helicopter testbed. Control. Eng. Pract. 19(9), 1023\u20131036 (2011)","journal-title":"Control. Eng. Pract."},{"issue":"1-4","key":"116_CR47","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1007\/s10846-012-9724-3","volume":"70","author":"M Abdolhosseini","year":"2013","unstructured":"Abdolhosseini, M., Zhang, Y., Rabbath, C.A.: An Efficient Model Predictive Control Scheme for an Unmanned Quadrotor Helicopter. J. Intell. Robot. Syst. 70(1-4), 27\u201338 (2013)","journal-title":"J. Intell. Robot. Syst."},{"issue":"1-4","key":"116_CR48","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s10846-012-9789-z","volume":"70","author":"A Nagaty","year":"2012","unstructured":"Nagaty, A., Saeedi, S., Thibault, C., Seto, M., Li, H.: Control and Navigation Framework for Quadrotor Helicopters. J. Intell. Robot. Syst. 70(1-4), 1\u201312 (2012)","journal-title":"J. Intell. Robot. Syst."},{"key":"116_CR49","doi-asserted-by":"crossref","unstructured":"Hu, W., Guo, S.: Visualization and Collaboration of On-Site Environments Based on Building Information Model for Construction Project Class. Inf. Manag. Eng., 288\u2013295 (2011). Springer","DOI":"10.1007\/978-3-642-24022-5_47"},{"issue":"3","key":"116_CR50","doi-asserted-by":"crossref","first-page":"101","DOI":"10.5130\/ajceb.v12i3.2749","volume":"12","author":"X Wang","year":"2012","unstructured":"Wang, X.: BIM Handbook: A guide to Building Information Modeling for owners, managers, designers, engineers and contractors [Book Review]. Australasian Journal of Construction Economics and Building 12(3), 101 (2012)","journal-title":"Australasian Journal of Construction Economics and Building"},{"issue":"1","key":"116_CR51","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1057\/palgrave.ivs.9500009","volume":"1","author":"H-T Chen","year":"2013","unstructured":"Chen, H.-T., Wu, S.-W., Hsieh, S.-H.: Visualization of CCTV coverage in public building space using BIM technology. Visualization in Engineering 1(1), 1\u201317 (2013)","journal-title":"Visualization in Engineering"},{"issue":"1","key":"116_CR52","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1186\/2213-7459-1-10","volume":"1","author":"Z Zhu","year":"2013","unstructured":"Zhu, Z., Donia, S.: Spatial and visual data fusion for capturing, retrieval, and modeling of as-built building geometry and features. Visualization in Engineering 1(1), 10 (2013)","journal-title":"Visualization in Engineering"},{"issue":"2","key":"116_CR53","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.autcon.2010.09.019","volume":"20","author":"S Azhar","year":"2011","unstructured":"Azhar, S., Carlton, W.A., Olsen, D., Ahmad, I.: Building information modeling for sustainable design and LEED\u00ae rating analysis. Autom. Constr. 20(2), 217\u2013224 (2011)","journal-title":"Autom. Constr."},{"issue":"1","key":"116_CR54","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.autcon.2010.07.006","volume":"20","author":"H Kim","year":"2011","unstructured":"Kim, H., Stumpf, A., Kim, W.: Analysis of an energy efficient building design through data mining approach. Autom. Constr. 20(1), 37\u201343 (2011)","journal-title":"Autom. Constr."},{"key":"116_CR55","doi-asserted-by":"crossref","unstructured":"Alwisy, A., Al-Hussein, M., Al-Jibouri, S.: BIM Approach for Automated Drafting and Design for Modular Construction Manufacturing. Comput. Civ. Eng., 221\u2013228 (2012)","DOI":"10.1061\/9780784412343.0028"},{"key":"116_CR56","unstructured":"Di Mascio, D., Wang, X.: Building Information Modelling (BIM)-Supported Cooperative Design in Sustainable Renovation Projects. Cooperative Design, Visualization, and Engineering, 205\u2013212 (2013). Springer"},{"issue":"8","key":"116_CR57","doi-asserted-by":"crossref","first-page":"915","DOI":"10.1016\/j.autcon.2008.02.016","volume":"17","author":"H Li","year":"2008","unstructured":"Li, H., Huang, T., Kong, C., Guo, H., Baldwin, A., Chan, N., Wong, J.: Integrating design and construction through virtual prototyping. Autom. Constr. 17(8), 915\u2013922 (2008)","journal-title":"Autom. Constr."},{"key":"116_CR58","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.autcon.2012.09.010","volume":"33","author":"C-S Park","year":"2013","unstructured":"Park, C.-S., Lee, D.-Y., Kwon, O.-S., Wang, X.: A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom. Constr. 33, 61\u201371 (2013)","journal-title":"Autom. Constr."},{"issue":"1","key":"116_CR59","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1186\/2213-7459-1-1","volume":"1","author":"M-FF Siu","year":"2013","unstructured":"Siu, M.-F.F., Lu, M., AbouRizk, S.: Combining photogrammetry and robotic total stations to obtain dimensional measurements of temporary facilities in construction field. Visualization in Engineering 1 (1), 1\u201315 (2013)","journal-title":"Visualization in Engineering"},{"issue":"1","key":"116_CR60","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1186\/2213-7459-1-12","volume":"1","author":"C-E Yang","year":"2013","unstructured":"Yang, C.-E., Lin, J.J.-C., Hung, W.-H., Kang, S.-C.: Accessibility Evaluation System for Site Layout Planning-A Tractor Trailer Example. Visualization in Engineering 1(1), 12 (2013)","journal-title":"Visualization in Engineering"},{"key":"116_CR61","doi-asserted-by":"crossref","unstructured":"Wang, Y., Wang, X., Wang, J., Yung, P., Jun, G.: Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study. Advances in Civil Engineering (2013)","DOI":"10.1155\/2013\/189105"},{"issue":"8","key":"116_CR62","doi-asserted-by":"crossref","first-page":"889","DOI":"10.1016\/S0890-6955(02)00030-5","volume":"42","author":"S Son","year":"2002","unstructured":"Son, S., Park, H., Lee, K.H.: Automated laser scanning system for reverse engineering and inspection. Int. J. Mach. Tools Manuf. 42(8), 889\u2013897 (2002)","journal-title":"Int. J. Mach. Tools Manuf."},{"issue":"8","key":"116_CR63","doi-asserted-by":"crossref","first-page":"495","DOI":"10.1016\/S0010-4485(99)00046-9","volume":"31","author":"K Kase","year":"1999","unstructured":"Kase, K., Makinouchi, A., Nakagawa, T., Suzuki, H., Kimura, F.: Shape error evaluation method of free-form surfaces. Comput. Aided Des. 31(8), 495\u2013505 (1999)","journal-title":"Comput. Aided Des."},{"issue":"2","key":"116_CR64","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1115\/1.2831211","volume":"121","author":"W Choi","year":"1999","unstructured":"Choi, W., Kurfess, T.R.: Dimensional measurement data analysis, part 1: a zone fitting algorithm. J. Manuf. Sci. Eng. 121(2), 238\u2013245 (1999)","journal-title":"J. Manuf. Sci. Eng."}],"container-title":["Journal of Intelligent &amp; Robotic Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10846-014-0116-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10846-014-0116-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10846-014-0116-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,15]],"date-time":"2019-08-15T09:55:30Z","timestamp":1565862930000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10846-014-0116-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,28]]},"references-count":64,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[2015,8]]}},"alternative-id":["116"],"URL":"https:\/\/doi.org\/10.1007\/s10846-014-0116-8","relation":{},"ISSN":["0921-0296","1573-0409"],"issn-type":[{"value":"0921-0296","type":"print"},{"value":"1573-0409","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,28]]}}}