{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,3]],"date-time":"2026-02-03T18:53:43Z","timestamp":1770144823657,"version":"3.49.0"},"reference-count":50,"publisher":"Springer Science and Business Media LLC","issue":"3-4","license":[{"start":{"date-parts":[[2014,9,28]],"date-time":"2014-09-28T00:00:00Z","timestamp":1411862400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Intell Robot Syst"],"published-print":{"date-parts":[[2015,8]]},"DOI":"10.1007\/s10846-014-0123-9","type":"journal-article","created":{"date-parts":[[2014,9,27]],"date-time":"2014-09-27T01:21:03Z","timestamp":1411780863000},"page":"433-448","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":16,"title":["A Conceptual Framework of Quality-Assured Fabrication, Delivery and Installation Processes for Liquefied Natural Gas (LNG) Plant Construction"],"prefix":"10.1007","volume":"79","author":[{"given":"Hung-Lin","family":"Chi","sequence":"first","affiliation":[]},{"given":"Jun","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Xiangyu","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Martijn","family":"Truijens","sequence":"additional","affiliation":[]},{"given":"Ping","family":"Yung","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,9,28]]},"reference":[{"key":"123_CR1","first-page":"221","volume-title":"Cooperative Design, Visualization, and Engineering, vol. 8091. Lecture Notes in Computer Science","author":"X Wang","year":"2013","unstructured":"Wang, X., Truijens, M., Hou, L., Wang, Y.: Application of collaborative mobile system in ar-based visualization, data storage and manipulation. In: Luo, Y. (ed.) Cooperative Design, Visualization, and Engineering, vol. 8091. Lecture Notes in Computer Science, pp. 221\u2013226. Springer, Berlin Heidelberg (2013)"},{"key":"123_CR2","unstructured":"Ellis, M., Heyning, C., Legrand, O.: Extending the LNG boom: Improving Australian LNG productivity and competitiveness. In: McKinsey Global Institute. New York (2013)"},{"key":"123_CR3","unstructured":"Taylor, C., Bradley, C., Dobbs, R., Thompson, F.D.C.: Beyond the boom: Australia\u2019s productivity imperative. In: McKinsey Global Institute. New York (2012)"},{"key":"123_CR4","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.autcon.2012.10.012","volume":"34","author":"X Wang","year":"2013","unstructured":"Wang, X., Love, P.E.D., Kim, M.J., Park, C.-S., Sing, C.-P., Hou, L.: A conceptual framework for integrating building information modeling with augmented reality. Autom. Constr. 34, 37\u201344 (2013)","journal-title":"Autom. Constr."},{"issue":"11","key":"123_CR5","doi-asserted-by":"crossref","first-page":"4383","DOI":"10.1016\/j.energy.2009.04.036","volume":"35","author":"W Lin","year":"2010","unstructured":"Lin, W., Zhang, N., Gu, A.: LNG (liquefied natural gas): A necessary part in China\u2019s future energy infrastructure. Energy 35(11), 4383\u20134391 (2010)","journal-title":"Energy"},{"key":"123_CR6","unstructured":"Wakamatsu, Y., Matsui, S., Yatsuhashi, Y.: Off-the-shelf mid-small-mini-scale LNG plant - case study for application. In: 17th International Conference and Exhibition on Liquefied Natural Gas. Houston (2013)"},{"issue":"5","key":"123_CR7","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1016\/j.autcon.2009.11.005","volume":"19","author":"N\u010c Babi\u010d","year":"2010","unstructured":"Babi\u010d, N.\u010c., Podbreznik, P., Rebolj, D.: Integrating resource production and construction using BIM. Autom. Constr. 19(5), 539\u2013543 (2010)","journal-title":"Autom. Constr."},{"key":"123_CR8","doi-asserted-by":"crossref","first-page":"168","DOI":"10.1016\/j.autcon.2013.08.002","volume":"36","author":"P V\u00e4h\u00e4","year":"2013","unstructured":"V\u00e4h\u00e4, P., Heikkil\u00e4, T., Kilpel\u00e4inen, P., J\u00e4rviluoma, M., Gambao, E.: Extending automation of building construction \u2014 survey on potential sensor technologies and robotic applications. Autom. Constr. 36, 168\u2013178 (2013)","journal-title":"Autom. Constr."},{"issue":"2","key":"123_CR9","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/j.autcon.2005.01.008","volume":"15","author":"B Akinci","year":"2006","unstructured":"Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K.: A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 15(2), 124\u2013138 (2006)","journal-title":"Autom. Constr."},{"issue":"6","key":"123_CR10","doi-asserted-by":"crossref","first-page":"681","DOI":"10.1016\/S0926-5805(98)00114-9","volume":"8","author":"PE Josephson","year":"1999","unstructured":"Josephson, P.E., Hammarlund, Y.: The causes and costs of defects in construction: A study of seven building projects. Autom. Constr. 8(6), 681\u2013687 (1999)","journal-title":"Autom. Constr."},{"key":"123_CR11","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1016\/j.autcon.2012.09.010","volume":"33","author":"C-S Park","year":"2013","unstructured":"Park, C.-S., Lee, D.-Y., Kwon, O.-S., Wang, X.: A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Autom. Constr. 33, 61\u201371 (2013)","journal-title":"Autom. Constr."},{"issue":"6","key":"123_CR12","doi-asserted-by":"crossref","first-page":"814","DOI":"10.1016\/j.autcon.2009.03.005","volume":"18","author":"A Dong","year":"2009","unstructured":"Dong, A., Maher, M.L., Kim, M.J., Gu, N., Wang, X.: Construction defect management using a telematic digital workbench. Autom. Constr. 18(6), 814\u2013824 (2009)","journal-title":"Autom. Constr."},{"key":"123_CR13","doi-asserted-by":"crossref","unstructured":"Mell, P., Grance, T.: The NIST definition of cloud computing. Technical Report SP 800-145. National Institute for Standard and Technology (2011)","DOI":"10.6028\/NIST.SP.800-145"},{"key":"123_CR14","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1016\/j.autcon.2012.02.003","volume":"24","author":"A Redmond","year":"2012","unstructured":"Redmond, A., Hore, A., Alshawi, M., West, R.: Exploring how information exchanges can be enhanced through cloud BIM. Autom. Constr. 24, 175\u2013183 (2012)","journal-title":"Autom. Constr."},{"issue":"2","key":"123_CR15","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.aei.2012.11.006","volume":"27","author":"Y Jiao","year":"2013","unstructured":"Jiao, Y., Wang, Y., Zhang, S., Li, Y., Yang, B., Yuan, L.: A cloud approach to unified lifecycle data management in architecture, engineering, construction and facilities management: Integrating BIMs and SNS. Adv. Eng. Inf. 27(2), 173\u2013188 (2013)","journal-title":"Adv. Eng. Inf."},{"issue":"2","key":"123_CR16","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1016\/j.aei.2012.10.003","volume":"27","author":"E Curry","year":"2013","unstructured":"Curry, E., O\u2019Donnell, J., Corry, E., Hasan, S., Keane, M., O\u2019Riain, S.: Linking building data in the cloud: Integrating cross-domain building data using linked data. Adv. Eng. Inf. 27(2), 206\u2013219 (2013)","journal-title":"Adv. Eng. Inf."},{"key":"123_CR17","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1057\/jit.2012.17","volume":"27","author":"W Venters","year":"2012","unstructured":"Venters, W., Whitley, E.A.: A critical review of cloud computing: researching desires and realities. J. Inf. Technol. 27, 179\u2013197 (2012)","journal-title":"J. Inf. Technol."},{"key":"123_CR18","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/j.autcon.2013.08.009","volume":"36","author":"A Kelm","year":"2013","unstructured":"Kelm, A., Lau\u00dfat, L., Meins-Becker, A., Platz, D., Khazaee, M.J., Costin, A.M., Helmus, M., Teizer, J.: Mobile passive Radio Frequency Identification (RFID) portal for automated and rapid control of Personal Protective Equipment (PPE) on construction sites. Autom. Constr. 36, 38\u201352 (2013)","journal-title":"Autom. Constr."},{"key":"123_CR19","first-page":"204","volume":"14","author":"C Zhang","year":"2009","unstructured":"Zhang, C., Hammad, A., Bahnassi, H.: Collaborative multi-agent systems for construction equipment based on real-time field data capturing. J. Inf. Technol. Constr. 14, 204\u2013228 (2009)","journal-title":"J. Inf. Technol. Constr."},{"issue":"1","key":"123_CR20","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/j.aei.2007.08.005","volume":"22","author":"AH Behzadan","year":"2008","unstructured":"Behzadan, A.H., Timm, B.W., Kamat, V.R.: General-purpose modular hardware and software framework for mobile outdoor augmented reality applications in engineering. Adv. Eng. Inf. 22(1), 90\u2013105 (2008)","journal-title":"Adv. Eng. Inf."},{"key":"123_CR21","doi-asserted-by":"crossref","first-page":"507","DOI":"10.1016\/j.autcon.2013.06.003","volume":"35","author":"EB Anil","year":"2013","unstructured":"Anil, E.B., Tang, P., Akinci, B., Huber, D.: Deviation analysis method for the assessment of the quality of the as-is building information models generated from point cloud data. Autom. Constr. 35, 507\u2013516 (2013)","journal-title":"Autom. Constr."},{"issue":"3","key":"123_CR22","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1016\/j.aei.2012.05.001","volume":"26","author":"H-L Chi","year":"2012","unstructured":"Chi, H.-L., Chen, Y.-C., Kang, S.-C., Hsieh, S.-H.: Development of user interface for tele-operated cranes. Adv. Eng. Inf. 26 (3), 641\u2013652 (2012)","journal-title":"Adv. Eng. Inf."},{"issue":"1","key":"123_CR23","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1186\/2213-7459-1-5","volume":"1","author":"H-T Chen","year":"2013","unstructured":"Chen, H.-T., Wu, S.-W., Hsieh, S.-H.: Visualization of CCTV coverage in public building space using BIM technology. Vis. Eng. 1(1), 5 (2013)","journal-title":"Vis. Eng."},{"issue":"2","key":"123_CR24","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/j.autcon.2008.07.002","volume":"18","author":"D Kim","year":"2009","unstructured":"Kim, D., Kim, J., Lee, K., Park, C., Song, J., Kang, D.: Excavator tele-operation system using a human arm. Autom. Constr. 18(2), 173\u2013182 (2009)","journal-title":"Autom. Constr."},{"issue":"5","key":"123_CR25","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1061\/(ASCE)0733-9364(2008)134:5(320)","volume":"134","author":"A Shapira","year":"2008","unstructured":"Shapira, A., Rosenfeld, Y., Mizrahi, I.: Vision system for tower cranes. J. Constr. Eng. Manag. 134(5), 320\u2013332 (2008)","journal-title":"J. Constr. Eng. Manag."},{"key":"123_CR26","first-page":"103","volume":"13","author":"J Teizer","year":"2008","unstructured":"Teizer, J.: 3D range imaging camera sensing for active safety in construction. J. Inf. Technol. Constr. 13, 103\u2013117 (2008)","journal-title":"J. Inf. Technol. Constr."},{"key":"123_CR27","doi-asserted-by":"crossref","unstructured":"Wang, X., Schnabel, M.A.: Mixed reality in architecture, design, and construction. Springer (2009)","DOI":"10.1007\/978-1-4020-9088-2"},{"key":"123_CR28","first-page":"536","volume":"13","author":"X Wang","year":"2008","unstructured":"Wang, X., Gu, N., Marchant, D.: An empirical case study on designer\u2019s perceptions of augmented reality within an architectural firm. J. Inf. Technol. Constr. 13, 536\u2013552 (2008)","journal-title":"J. Inf. Technol. Constr."},{"issue":"2","key":"123_CR29","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1260\/147807709788921985","volume":"7","author":"X Wang","year":"2009","unstructured":"Wang, X.: Augmented reality in architecture and design: Potentials and challenges for application. Int. J. Archit. Comput. 7(2), 309\u2013326 (2009)","journal-title":"Int. J. Archit. Comput."},{"issue":"4","key":"123_CR30","doi-asserted-by":"crossref","first-page":"501","DOI":"10.5772\/5677","volume":"4","author":"X Wang","year":"2007","unstructured":"Wang, X.: Using augmented reality to plan virtual construction worksite. Int. J. Adv. Robot. Syst. 4(4), 501\u2013512 (2007)","journal-title":"Int. J. Adv. Robot. Syst."},{"issue":"1","key":"123_CR31","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1145\/1048687.1048688","volume":"2","author":"DH Shin","year":"2005","unstructured":"Shin, D.H., Dunston, P.S., Wang, X.: View changes in mixed reality-based collaborative virtual environments. ACM Trans. Appl. Percept. 2(1), 1\u201314 (2005)","journal-title":"ACM Trans. Appl. Percept."},{"key":"123_CR32","first-page":"363","volume":"12","author":"X Wang","year":"2007","unstructured":"Wang, X., Dunston, P.S.: Design, strategies, and issues towards an augmented reality-based construction training platform. J. Inf. Technol. Constr. 12, 363\u2013380 (2007)","journal-title":"J. Inf. Technol. Constr."},{"key":"123_CR33","first-page":"129","volume":"14","author":"M Golparvar-Fard","year":"2009","unstructured":"Golparvar-Fard, M., Pe\u00f1a-Mora, F., Savarese, S.: Application of D 4AR - A 4-dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication. J. Inf. Technol. Constr. 14, 129\u2013153 (2009)","journal-title":"J. Inf. Technol. Constr."},{"issue":"4","key":"123_CR34","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1007\/s00779-008-0204-5","volume":"13","author":"G Schall","year":"2009","unstructured":"Schall, G., Mendez, E., Kruijff, E., Veas, E., Junghanns, S., Reitinger, B., Schmalstieg, D.: Handheld augmented reality for underground infrastructure visualization. Pers. Ubiquit. Comput. 13(4), 281\u2013291 (2009)","journal-title":"Pers. Ubiquit. Comput."},{"issue":"4","key":"123_CR35","doi-asserted-by":"crossref","first-page":"615","DOI":"10.1109\/TVCG.2006.78","volume":"12","author":"AI Comport","year":"2006","unstructured":"Comport, A.I., Marchand, E., Pressigout, M., Chaumette, F.: Real-time markerless tracking for augmented reality: The virtual visual servoing framework. IEEE Trans. Vis. Comput. Graph. 12(4), 615\u2013628 (2006)","journal-title":"IEEE Trans. Vis. Comput. Graph."},{"issue":"2","key":"123_CR36","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1023\/B:VISI.0000029664.99615.94","volume":"60","author":"DG Lowe","year":"2004","unstructured":"Lowe, D.G.: Distinctive image features from scale-invariant keypoints. Int. J. Comput. Vis. 60(2), 91\u2013110 (2004)","journal-title":"Int. J. Comput. Vis."},{"issue":"4","key":"123_CR37","doi-asserted-by":"crossref","first-page":"566","DOI":"10.1109\/70.508439","volume":"12","author":"LE Kavraki","year":"1996","unstructured":"Kavraki, L.E., Svestka, P., Latombe, J.C., Overmars, M.H.: Probabilistic roadmaps for path planning in high-dimensional configuration spaces. IEEE Trans. Robot. Autom. 12(4), 566\u2013580 (1996)","journal-title":"IEEE Trans. Robot. Autom."},{"issue":"6","key":"123_CR38","doi-asserted-by":"crossref","first-page":"724","DOI":"10.1016\/j.autcon.2009.02.006","volume":"18","author":"K-C Lai","year":"2009","unstructured":"Lai, K.-C., Kang, S.-C.: Collision detection strategies for virtual construction simulation. Autom. Constr. 18(6), 724\u2013736 (2009)","journal-title":"Autom. Constr."},{"issue":"1","key":"123_CR39","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1167\/13.7.12","volume":"1","author":"C-E Yang","year":"2013","unstructured":"Yang, C.-E., Lin, J.J.-C., Hung, W.-H., Kang, S.-C.: Accessibility evaluation system for site layout planning - A tractor trailer example. Vis. Eng. 1(1), 12 (2013)","journal-title":"Vis. Eng."},{"issue":"2","key":"123_CR40","doi-asserted-by":"crossref","first-page":"396","DOI":"10.1016\/j.aei.2012.01.003","volume":"26","author":"C Zhang","year":"2012","unstructured":"Zhang, C., Hammad, A.: Improving lifting motion planning and re-planning of cranes with consideration for safety and efficiency. Adv. Eng. Inf. 26(2), 396\u2013410 (2012)","journal-title":"Adv. Eng. Inf."},{"issue":"1","key":"123_CR41","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1007\/BF01386390","volume":"1","author":"EW Dijkstra","year":"1959","unstructured":"Dijkstra, E.W.: A note on two problems in connexion with graphs. Numer. Math. 1(1), 269\u2013271 (1959)","journal-title":"Numer. Math."},{"key":"123_CR42","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1145\/1056777.1056779","volume":"37","author":"PE Hart","year":"1972","unstructured":"Hart, P.E., Nilsson, N.J., Raphael, B.: Correction to a formal basis for the heuristic determination of minimum cost paths. SIGART Newsl. 37, 28\u201329 (1972)","journal-title":"SIGART Newsl."},{"issue":"4","key":"123_CR43","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1016\/j.autcon.2005.06.008","volume":"15","author":"S Kang","year":"2006","unstructured":"Kang, S., Miranda, E.: Planning and visualization for automated robotic crane erection processes in construction. Autom. Constr. 15(4), 398\u2013414 (2006)","journal-title":"Autom. Constr."},{"key":"123_CR44","doi-asserted-by":"crossref","first-page":"468","DOI":"10.1016\/j.autcon.2011.11.006","volume":"22","author":"Y-C Chang","year":"2012","unstructured":"Chang, Y.-C., Hung, W.-H., Kang, S.-C.: A fast path planning method for single and dual crane erections. Autom. Constr. 22, 468\u2013480 (2012)","journal-title":"Autom. Constr."},{"issue":"8","key":"123_CR45","doi-asserted-by":"crossref","first-page":"889","DOI":"10.1016\/S0890-6955(02)00030-5","volume":"42","author":"S Son","year":"2002","unstructured":"Son, S., Park, H., Lee, K.H.: Automated laser scanning system for reverse engineering and inspection. Int. J. Mach. Tools Manuf. 42(8), 889\u2013897 (2002)","journal-title":"Int. J. Mach. Tools Manuf."},{"issue":"1","key":"123_CR46","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1186\/2213-7459-1-13","volume":"1","author":"I Kovacic","year":"2013","unstructured":"Kovacic, I., Oberwinter, L., Muller, C., Achammer, C.: The BIM-sustain experiment - simulation of BIM-supported multi-disciplinary design. Vis. Eng. 1(1), 13 (2013)","journal-title":"Vis. Eng."},{"issue":"5","key":"123_CR47","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1061\/(ASCE)CP.1943-5487.0000184","volume":"27","author":"L Hou","year":"2013","unstructured":"Hou, L., Wang, X., Bernold, L., Love, P.: Using animated augmented reality to cognitively guide assembly. J. Comput. Civil Eng. 27(5), 439\u2013451 (2013)","journal-title":"J. Comput. Civil Eng."},{"key":"123_CR48","unstructured":"Geoforce: Geoforce: Hardware. http:\/\/www.geoforce.com\/Technologies\/Hardware\/ (2013). Accessed 31 Dec 2013"},{"issue":"1","key":"123_CR49","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1109\/MRA.2011.940276","volume":"18","author":"SM LaValle","year":"2011","unstructured":"LaValle, S.M.: Motion planning: The essentials. IEEE Robot. Autom. Mag. 18(1), 79\u201389 (2011)","journal-title":"IEEE Robot. Autom. Mag."},{"issue":"2","key":"123_CR50","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1109\/34.121791","volume":"14","author":"PJ Besl","year":"1992","unstructured":"Besl, P.J., McKay, N.D.: A method for registration of 3-D shapes. IEEE Trans. Pattern Anal. Mach. Intell. 14(2), 239\u2013256 (1992)","journal-title":"IEEE Trans. Pattern Anal. Mach. Intell."}],"container-title":["Journal of Intelligent &amp; Robotic Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10846-014-0123-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10846-014-0123-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10846-014-0123-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,15]],"date-time":"2019-08-15T09:58:16Z","timestamp":1565863096000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10846-014-0123-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,28]]},"references-count":50,"journal-issue":{"issue":"3-4","published-print":{"date-parts":[[2015,8]]}},"alternative-id":["123"],"URL":"https:\/\/doi.org\/10.1007\/s10846-014-0123-9","relation":{},"ISSN":["0921-0296","1573-0409"],"issn-type":[{"value":"0921-0296","type":"print"},{"value":"1573-0409","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,9,28]]}}}