{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T08:52:50Z","timestamp":1762505570140},"reference-count":48,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2010,3,10]],"date-time":"2010-03-10T00:00:00Z","timestamp":1268179200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Math Model Algor"],"published-print":{"date-parts":[[2010,12]]},"DOI":"10.1007\/s10852-010-9130-4","type":"journal-article","created":{"date-parts":[[2010,3,9]],"date-time":"2010-03-09T07:30:43Z","timestamp":1268119843000},"page":"311-342","source":"Crossref","is-referenced-by-count":3,"title":["Medium Term Production Management for Cyclic Deliveries"],"prefix":"10.1007","volume":"9","author":[{"given":"Zied","family":"Bahroun","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jean-Pierre","family":"Campagne","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2010,3,10]]},"reference":[{"key":"9130_CR1","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0098-1354(03)00171-6","volume":"28","author":"A Alle","year":"2004","unstructured":"Alle, A., Papageorgioub, L.G., Pinto, J.M.: A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants. Comput. Chem. Eng. 28, 3\u201315 (2004)","journal-title":"Comput. Chem. Eng."},{"issue":"12","key":"9130_CR2","doi-asserted-by":"crossref","first-page":"2635","DOI":"10.1080\/00207540110047711","volume":"39","author":"KA Aldakhilallah","year":"2001","unstructured":"Aldakhilallah, K.A., Ramesh, R.: Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment. Int. J. Prod. Res. 39(12), 2635\u20132657 (2001)","journal-title":"Int. J. Prod. Res."},{"issue":"1\u20132","key":"9130_CR3","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0360-8352(99)00012-1","volume":"37","author":"Z Bahroun","year":"1999","unstructured":"Bahroun, Z., Baptiste, P., Campagne, J.-P., Moalla, M.: Production planning and scheduling in the context of cyclic delivery schedules. Comput. Ind. Eng. 37(1\u20132), 3\u20137 (1999)","journal-title":"Comput. Ind. Eng."},{"key":"9130_CR4","unstructured":"Bahroun, Z.: Contribution \u00e0 la planification et \u00e0 la gestion dynamique des syst\u00e8mes de production cyclique. Ph.D. thesis, Faculty of Tunis (Tunisia) and Franche-comt\u00e9 (France) (2000)"},{"key":"9130_CR5","unstructured":"Bahroun, Z., Campagne, J.-P., Moalla, M.: Safety stocks determination in the context of cyclic delivery schedules. In: ESS\u20192005: European Symposium on Simulation, Marseille, France (2005)"},{"key":"9130_CR6","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/0167-188X(88)90047-X","volume":"14","author":"F Boctor","year":"1998","unstructured":"Boctor, F.: A more efficient formulation of the single machine, static demand, lot scheduling problem. Eng. Costs Prod. Econ. 14, 3\u201310 (1998)","journal-title":"Eng. Costs Prod. Econ."},{"issue":"13","key":"9130_CR7","doi-asserted-by":"crossref","first-page":"2667","DOI":"10.1080\/00207540410001671660","volume":"42","author":"FF Boctor","year":"2004","unstructured":"Boctor, F.F., Laporte, G., Renaud, J.: Models and algorithms for the dynamic-demand joint replenishment problem. Int. J. Prod. Res. 42(13), 2667\u20132678 (2004)","journal-title":"Int. J. Prod. Res."},{"key":"9130_CR8","doi-asserted-by":"crossref","first-page":"303","DOI":"10.1007\/s10951-005-1639-4","volume":"8","author":"P Brucker","year":"2005","unstructured":"Brucker, P., Kampmeyer, T.: Tabu search algorithms for cyclic machine scheduling problems. J. Sched. 8, 303\u2013322 (2005)","journal-title":"J. Sched."},{"issue":"4","key":"9130_CR9","doi-asserted-by":"crossref","first-page":"409","DOI":"10.1287\/mnsc.37.4.409","volume":"37","author":"GM Campbell","year":"1991","unstructured":"Campbell, G.M., Mabert, V.A.: Cyclical schedules for capacitated lot sizing with dynamic demands. Manag. Sci. 37(4), 409\u2013427 (1991)","journal-title":"Manag. Sci."},{"key":"9130_CR10","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1080\/15458830.1996.11770709","volume":"28","author":"GM Campbell","year":"1996","unstructured":"Campbell, G.M. : Cyclic assembly schedules for dynamic demands. IIE Trans. 28, 643\u2013651 (1996)","journal-title":"IIE Trans."},{"key":"9130_CR11","unstructured":"Campagne, J.-P., Grimaud, F., Mabed, M.: Pilotage de syst\u00c3\u013ames de production cyclique: proposition d\u2019une instrumentation de gestion, GI\u201901, 4\u00c3\u013ame congr\u00c3\u013as international de g\u00c3l\u2019nie industriel, pp. 1083\u20131094. Marseille, France (2001)"},{"key":"9130_CR12","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/j.ejor.2003.03.001","volume":"161","author":"G Cavory","year":"2005","unstructured":"Cavory, G., Dupas, R., Goncalves, G.: A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints. Eur. J. Oper. Res. 161, 73\u201385 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"9130_CR13","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/0377-2217(88)90356-6","volume":"34","author":"S Chand","year":"1988","unstructured":"Chand, S., Schneeberger, H.: Single machine scheduling to minimize weighted earliness subject to no tardy jobs. Eur. J. Oper. Res. 34, 221\u2013230 (1988)","journal-title":"Eur. J. Oper. Res."},{"key":"9130_CR14","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1109\/TRA.2002.807529","volume":"19","author":"F Chauvet","year":"2003","unstructured":"Chauvet, F., Herrmann, J.W., Proth, J.M.: Optimization of cyclic production systems: a heuristic approach. IEEE Trans. Robot. Autom. 19, 1 (2003)","journal-title":"IEEE Trans. Robot. Autom."},{"key":"9130_CR15","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1109\/TASE.2005.842925","volume":"2","author":"A Che","year":"2005","unstructured":"Che A., Chu, C.: Multi-degree cyclic scheduling of two robots in a no-wait flow-shop. IEEE Trans Autom Sci Eng 2, 2 (2005)","journal-title":"IEEE Trans Autom Sci Eng"},{"key":"9130_CR16","unstructured":"Cheurfa, M.: Gestion des ressources humaines en production cyclique. Ph.D. thesis, Ecole des Mines de Saint-Etienne, France (2005)"},{"issue":"6","key":"9130_CR17","doi-asserted-by":"crossref","first-page":"587","DOI":"10.1287\/mnsc.24.6.587","volume":"24","author":"SE El-Maghraby","year":"1978","unstructured":"El-Maghraby, S.E.: The economic lot scheduling problem (elsp): review and extensions. Manag. Sci. 24(6), 587\u2013598 (1978).","journal-title":"Manag. Sci."},{"key":"9130_CR18","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1016\/0377-2217(94)90087-6","volume":"75","author":"G Dobson","year":"1994","unstructured":"Dobson, G., Yano, C.A.: Cyclic Scheduling to minimize inventory in the batch flow line. Eur. J. Oper. Res. 75, 441\u2013461 (1994)","journal-title":"Eur. J. Oper. Res."},{"issue":"12","key":"9130_CR19","first-page":"3333","volume":"35","author":"MK El-Najdawi","year":"1998","unstructured":"El-Najdawi, M.K.: Multi-cyclic flow shop scheduling: an application in multi-stage, multi-product production processes. Int. J. Prod. Res. 35(12), 3333\u20133348 (1998)","journal-title":"Int. J. Prod. Res."},{"key":"9130_CR20","doi-asserted-by":"crossref","first-page":"457","DOI":"10.1080\/00207548808947876","volume":"26","author":"RW Hall","year":"1988","unstructured":"Hall, R.W. Cyclic scheduling for improvement. Int. J. Prod. Res. 26, 457\u2013472 (1988)","journal-title":"Int. J. Prod. Res."},{"key":"9130_CR21","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1002\/jos.100","volume":"5","author":"GH Hall","year":"2002","unstructured":"Hall, G.H., Lee, T.-E., Posner, M.E.: The complexity of cyclic shop scheduling problems. J. Sched. 5, 307\u2013327 (2002)","journal-title":"J. Sched."},{"issue":"4","key":"9130_CR22","doi-asserted-by":"crossref","first-page":"362","DOI":"10.1080\/09537280010008511","volume":"12","author":"JC Hennet","year":"2001","unstructured":"Hennet, J.C.: Common cycle approach to lot scheduling in production planning and control. Prod. Plan. Control 12(4), 362\u2013371 (2001)","journal-title":"Prod. Plan. Control"},{"key":"9130_CR23","doi-asserted-by":"crossref","first-page":"954","DOI":"10.1057\/palgrave.jors.0470712","volume":"47","author":"MR Hill","year":"1996","unstructured":"Hill, M.R.: Optimizing a production system with a fixed delivery schedule. J. Oper. Res. Soc. 47, 954\u2013960 (1996)","journal-title":"J. Oper. Res. Soc."},{"issue":"3","key":"9130_CR24","doi-asserted-by":"crossref","first-page":"305","DOI":"10.1016\/S0925-5273(99)00082-1","volume":"65","author":"MA Hoque","year":"2000","unstructured":"Hoque, M.A., Goyal, S. K.: Optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment. Int. J. Prod. Econ. 65(3), 305\u2013315 (2000)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"9130_CR25","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/j.ijpe.2003.12.003","volume":"95","author":"MA Hoque","year":"2005","unstructured":"Hoque, M.A., Goyal, S.K.: On lot streaming in multistage production systems. Int. J. Prod. Econ. 95(2), 195\u2013202 (2005)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"9130_CR26","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1016\/j.ijpe.2005.02.012","volume":"102","author":"MA Hoque","year":"2006","unstructured":"Hoque, M.A., Goyal, S.K.: A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. Int. J. Prod. Econ. 102(2), 217\u2013225 (2006)","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"9130_CR27","doi-asserted-by":"crossref","first-page":"811","DOI":"10.1016\/j.ejor.2007.05.019","volume":"188","author":"MA Hoque","year":"2008","unstructured":"Hoque, M.A.: Synchronization in the single manufacturer multi-buyer integrated inventory supply chain. Eur. J. Oper. Res. 188(3), 811\u2013825 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"9130_CR28","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/0167-188X(90)90011-6","volume":"20","author":"JI Hsu","year":"1990","unstructured":"Hsu, J.I., El-Najdawi, M.: Common cycle scheduling in a multistage production process. Eng. Costs Prod. Econ. 20, 73\u201380 (1990)","journal-title":"Eng. Costs Prod. Econ."},{"issue":"2","key":"9130_CR29","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1016\/j.ejor.2007.02.055","volume":"194","author":"T Hsu","year":"2008","unstructured":"Hsu, T., Korbaa, O., Dupas, R., Goncalves, G.: Cyclic scheduling for F.M.S.: Modelling and evolutionary solving approach. Eur. J. Oper. Res. 194(2), 464\u2013484 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"9130_CR30","doi-asserted-by":"crossref","first-page":"350","DOI":"10.1016\/0377-2217(93)90247-K","volume":"70","author":"H Kamoun","year":"1993","unstructured":"Kamoun, H., Sriskandarajah, C.: The complexity of scheduling jobs in repetitive manufacturing systems. Eur. J. Oper. Res. 70, 350\u2013364 (1993)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"9130_CR31","doi-asserted-by":"crossref","first-page":"324","DOI":"10.1080\/07408178908966238","volume":"21","author":"I Karimi","year":"1989","unstructured":"Karimi, I.: Optimal cycle times in a two stage serial system with set-up and inventory costs. IIE Trans. 21(4), 324\u2013332 (1989)","journal-title":"IIE Trans."},{"issue":"1","key":"9130_CR32","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2007.03.007","volume":"186","author":"M Khouja","year":"2008","unstructured":"Khouja, M., Goyal, S.: A review of the joint replenishment problem literature: 1989\u20132005. Eur. J. Oper. Res. 186(1), 1\u201316 (2008)","journal-title":"Eur. J. Oper. Res."},{"key":"9130_CR33","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1111\/j.1540-5915.1993.tb00466.x","volume":"24","author":"D Kim","year":"1993","unstructured":"Kim, D., Mabert, V.A., Pinto, P.A.: Integrative cycle scheduling approach for a capacitated flexible assembly system. Decis. Sci. 24, 126\u2013147 (1993)","journal-title":"Decis. Sci."},{"key":"9130_CR34","doi-asserted-by":"crossref","first-page":"2007","DOI":"10.1080\/00207549508904795","volume":"33","author":"D Kim","year":"1995","unstructured":"Kim, D, Mabert, A.: Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems. Int. J. Prod. Res. 33, 2007\u20132021 (1995)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"9130_CR35","doi-asserted-by":"crossref","first-page":"729","DOI":"10.1016\/j.ejor.2003.04.010","volume":"165","author":"LH Lee","year":"2005","unstructured":"Lee, L.H., Chew, E.P.: A dynamic joint replenishment policy with auto-correlated demand. Eur. J. Oper. Res. 165(3), 729\u2013747 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"9130_CR36","doi-asserted-by":"crossref","first-page":"851","DOI":"10.1080\/00207549408956975","volume":"32","author":"AG Loerch","year":"1994","unstructured":"Loerch, A.G., Muckstadt, J.A.: An approach to production planning and scheduling in cyclically scheduled manufacturing systems. Int. J. Prod. Res. 32, 851\u2013871 (1994)","journal-title":"Int. J. Prod. Res."},{"key":"9130_CR37","unstructured":"Mabed, A.M.: Evaluation et mise en \u00c5\u015euvre de syst\u00c3\u013ames de production cycliques. Ph.D. thesis, Ecole des Mines de Saint-Etienne, France (2005)"},{"issue":"6","key":"9130_CR38","doi-asserted-by":"crossref","first-page":"1316","DOI":"10.1287\/opre.33.6.1316","volume":"33","author":"WL Maxwell","year":"1985","unstructured":"Maxwell, W.L., Muckstadt, J.A.: Establishing consistent and realistic reorder intervals in production distribution systems. Oper. Res. 33(6), 1316\u20131341 (1985)","journal-title":"Oper. Res."},{"issue":"4","key":"9130_CR39","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1080\/07408178508975314","volume":"17","author":"JO McClain","year":"1985","unstructured":"McClain, J.O., Trigeiro, W.W.: Cyclic assembly schedules. IEE Trans. 17(4), 346\u2013353 (1985)","journal-title":"IEE Trans."},{"issue":"2","key":"9130_CR40","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/0895-7177(94)90210-0","volume":"20","author":"ST Mccormick","year":"1994","unstructured":"Mccormick, S.T., Rao, S.U.: Some complexity results in cyclic scheduling. Math. Comput. Model. 20(2), 107\u2013122 (1994)","journal-title":"Math. Comput. Model."},{"key":"9130_CR41","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.ijpe.2006.12.022","volume":"108","author":"A Nilsson","year":"2007","unstructured":"Nilsson, A., Segerstedt, A., Van der Sluis, E.:. A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique. Int. J. Prod. Econ. 108, 99\u2013400 (2007)","journal-title":"Int. J. Prod. Econ."},{"key":"9130_CR42","doi-asserted-by":"crossref","first-page":"930","DOI":"10.1057\/jors.1996.118","volume":"47","author":"VS Nori","year":"1996","unstructured":"Nori, V.S., Sarker, B.R.: Cyclic scheduling for a multi-product, single facility production system operating under a just-in-time delivery policy. J. Oper. Res. Soc. 47, 930\u2013935 (1996)","journal-title":"J. Oper. Res. Soc."},{"issue":"9","key":"9130_CR43","first-page":"797","volume":"18","author":"JM Pinto","year":"1994","unstructured":"Pinto, J.M., Grosmann, I.E.: Optimal cyclic scheduling of multistage continuous multi-products plants. Int. J. Prod. Res. 18(9), 797\u2013816 (1994)","journal-title":"Int. J. Prod. Res."},{"key":"9130_CR44","doi-asserted-by":"crossref","first-page":"891","DOI":"10.1057\/jors.1994.168","volume":"45","author":"BR Sarker","year":"1994","unstructured":"Sarker, B.R., Parija, G.R.: An optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. J. Oper. Res. Soc. 45, 891\u2013900 (1994)","journal-title":"J. Oper. Res. Soc."},{"issue":"3","key":"9130_CR45","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1080\/00207549508930169","volume":"33","author":"EA Silver","year":"1995","unstructured":"Silver, E A.: Dealing with a shelf life constraint cyclic scheduling by adjusting both cycle time and production rate. Int. J. Prod. Res. 33(3), 623\u2013629 (1995)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"9130_CR46","doi-asserted-by":"crossref","first-page":"56","DOI":"10.1287\/opre.39.1.56","volume":"39","author":"PH Zipkin","year":"1991","unstructured":"Zipkin, P.H.: Computing optimal lot-sizes in the economic lot scheduling problem. Oper. Res. 39(1), 56\u201363 (1991)","journal-title":"Oper. Res."},{"issue":"6","key":"9130_CR47","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1002\/(SICI)1520-6750(199709)44:6<577::AID-NAV4>3.0.CO;2-0","volume":"44","author":"IR Webb","year":"1997","unstructured":"Webb, I.R., Buzby, B.R., Campbell, G.M.: Cyclical schedules for the Joint Replenishment Problem with dynamic demands. Nav. Res. Logist. 44(6), 577\u2013589 (1997)","journal-title":"Nav. Res. Logist."},{"key":"9130_CR48","doi-asserted-by":"crossref","first-page":"2271","DOI":"10.1016\/j.compchemeng.2004.04.002","volume":"28","author":"D Wu","year":"2004","unstructured":"Wu, D., Ierapetritou, M.: Cyclic short-term scheduling of multi-product batch plant using continuous-time representation. Comput Chem Eng 28, 2271\u20132286 (2004)","journal-title":"Comput Chem Eng"}],"container-title":["Journal of Mathematical Modelling and Algorithms"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-010-9130-4.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10852-010-9130-4\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-010-9130-4","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:26:31Z","timestamp":1559269591000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10852-010-9130-4"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,3,10]]},"references-count":48,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2010,12]]}},"alternative-id":["9130"],"URL":"https:\/\/doi.org\/10.1007\/s10852-010-9130-4","relation":{},"ISSN":["1570-1166","1572-9214"],"issn-type":[{"value":"1570-1166","type":"print"},{"value":"1572-9214","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,3,10]]}}}