{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,11]],"date-time":"2026-02-11T16:28:37Z","timestamp":1770827317146,"version":"3.50.1"},"reference-count":45,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2011,9,8]],"date-time":"2011-09-08T00:00:00Z","timestamp":1315440000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Math Model Algor"],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1007\/s10852-011-9160-6","type":"journal-article","created":{"date-parts":[[2011,9,7]],"date-time":"2011-09-07T13:37:46Z","timestamp":1315402666000},"page":"341-356","source":"Crossref","is-referenced-by-count":8,"title":["A Multi-Objective Production Inventory Model with Backorder for Fuzzy Random Demand Under Flexibility and Reliability"],"prefix":"10.1007","volume":"10","author":[{"given":"Nita H.","family":"Shah","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hardik","family":"Soni","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,9,8]]},"reference":[{"key":"9160_CR1","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1016\/j.cie.2008.07.001","volume":"56","author":"S Bag","year":"2009","unstructured":"Bag, S., Chakraborty, D., Roy, A.R.: A production inventory model with fuzzy random demand and with flexibility and reliability considerations. Comput. Ind. Eng. 56, 411\u2013416 (2009)","journal-title":"Comput. Ind. Eng."},{"key":"9160_CR2","volume-title":"Fuzzy Mathematical Programming and Fuzzy Matrix Games","author":"RC Bector","year":"2005","unstructured":"Bector, R.C., Chandra, S.: Fuzzy Mathematical Programming and Fuzzy Matrix Games. Springer, New York (2005)"},{"key":"9160_CR3","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1007\/BF03398569","volume":"36","author":"RM Bhandari","year":"1999","unstructured":"Bhandari, R.M., Sharma, P.K.: The economic production lot size model with variable cost function. Opsearch 36, 137\u2013150 (1999)","journal-title":"Opsearch"},{"key":"9160_CR4","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/0377-2217(89)90190-2","volume":"39","author":"TCE Cheng","year":"1989","unstructured":"Cheng, T.C.E.: An economic production quantity model with flexibility and reliability considerations. Eur. J. Oper. Res. 39, 174\u2013179 (1989a)","journal-title":"Eur. J. Oper. Res."},{"key":"9160_CR5","doi-asserted-by":"crossref","first-page":"252","DOI":"10.1016\/0377-2217(89)90334-2","volume":"40","author":"TCE Cheng","year":"1989","unstructured":"Cheng, T.C.E.: An economic order quantity model with demand-dependent unit cost. Eur. J. Oper. Res. 40, 252\u2013256 (1989b)","journal-title":"Eur. J. Oper. Res."},{"key":"9160_CR6","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1080\/07408179108963838","volume":"23","author":"TCE Cheng","year":"1991","unstructured":"Cheng, T.C.E.: An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Trans. 23, 23\u201328 (1991)","journal-title":"IIE Trans."},{"key":"9160_CR7","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1016\/S0305-0548(01)00091-0","volume":"30","author":"K Chung","year":"2003","unstructured":"Chung, K., Hou, K.: An optimal production run time with imperfect production processes and allowable shortages. Comput. Oper. Res. 30, 483\u2013490 (2003)","journal-title":"Comput. Oper. Res."},{"key":"9160_CR8","volume-title":"Multi-objective Optimization Using Evolutionary Algorithms","author":"K Deb","year":"2001","unstructured":"Deb, K.: Multi-objective Optimization Using Evolutionary Algorithms. Wiley, Chichester (2001)"},{"key":"9160_CR9","doi-asserted-by":"crossref","unstructured":"Deb, K., Goel, T.: Controlled elitist non-dominated sorting genetic algorithms for better convergence. In: Proceedings of the First International Conference on Evolutionary Multi-criterion Optimization, Zurich, pp. 67\u201381 (2001)","DOI":"10.1007\/3-540-44719-9_5"},{"key":"9160_CR10","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1109\/4235.996017","volume":"6","author":"K Deb","year":"2002","unstructured":"Deb, K., Pratap, A., Agarwal, S., Meyarivan, T.: A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 6, 182\u2013197 (2002)","journal-title":"IEEE Trans. Evol. Comput."},{"key":"9160_CR11","doi-asserted-by":"crossref","first-page":"613","DOI":"10.1080\/00207727808941724","volume":"9","author":"D Dubois","year":"1978","unstructured":"Dubois, D., Prade, H.: Operations of fuzzy numbers. Int. J. Syst. Sci. 9, 613\u2013626 (1978)","journal-title":"Int. J. Syst. Sci."},{"key":"9160_CR12","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1016\/S0165-0114(02)00098-2","volume":"130","author":"P Grzegorzewski","year":"2002","unstructured":"Grzegorzewski, P.: Nearest interval approximation of a fuzzy number. Fuzzy Sets Syst. 130, 321\u2013330 (2002)","journal-title":"Fuzzy Sets Syst."},{"key":"9160_CR13","volume-title":"Global Optimization Using Interval Analysis","author":"E Hansen","year":"2004","unstructured":"Hansen, E., Walster, G.: Global Optimization Using Interval Analysis. Marcel Dekker Inc., New York (2004)"},{"key":"9160_CR14","volume-title":"Production and Inventory Management","author":"AC Hax","year":"1984","unstructured":"Hax, A.C., Canada, D.: Production and Inventory Management. Prentice-Hall, New Jersey (1984)"},{"key":"9160_CR15","unstructured":"Holland, H.J.: Adaptation in Natural and Artifcial Systems. University of Michigan (1975)"},{"key":"9160_CR16","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/j.amc.2005.10.001","volume":"176","author":"S Islam","year":"2006","unstructured":"Islam, S., Roy, T.K.: A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach. Appl. Math. Comput. 176, 531\u2013544 (2006)","journal-title":"Appl. Math. Comput."},{"key":"9160_CR17","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1016\/j.cam.2008.05.025","volume":"224","author":"S Karmakar","year":"2009","unstructured":"Karmakar, S., Mahato, S.K., Bhunia, A.K.: Interval oriented multi-section techniques for global optimization. J. Comput. Appl. Math. 224, 476\u2013491 (2009)","journal-title":"J. Comput. Appl. Math."},{"key":"9160_CR18","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1162\/106365600568167","volume":"8","author":"J Knowles","year":"2000","unstructured":"Knowles, J., Corne, D.: Approximating the non-dominated front using the Pareto archived evolution strategy. Evol. Comput. 8, 149\u2013172 (2000)","journal-title":"Evol. Comput."},{"key":"9160_CR19","doi-asserted-by":"crossref","first-page":"515","DOI":"10.1016\/0305-0548(94)00032-4","volume":"22","author":"M Khouja","year":"1995","unstructured":"Khouja, M.: The economic production lot size model under volume flexibility. J. Comput. Oper. Res. 22, 515\u2013523 (1995)","journal-title":"J. Comput. Oper. Res."},{"key":"9160_CR20","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0020-0255(78)90019-1","volume":"15","author":"H Kwakernaak","year":"1978","unstructured":"Kwakernaak, H.: Fuzzy random variables: definition and theorems. Inform. Sci. 15, 1\u201329 (1978)","journal-title":"Inform. Sci."},{"key":"9160_CR21","doi-asserted-by":"crossref","first-page":"240","DOI":"10.1016\/j.ejor.2005.06.049","volume":"176","author":"KF Leung","year":"2007","unstructured":"Leung, K.F.: A generalized geometric programming solution to an economic production quantity model with flexibility and reliability considerations. Eur. J. Oper. Res. 176, 240\u2013251 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"9160_CR22","doi-asserted-by":"crossref","first-page":"977","DOI":"10.1016\/j.mcm.2005.04.006","volume":"42","author":"MK Maiti","year":"2005","unstructured":"Maiti, M.K., Maiti, M.: Production policy of damageable items with variable cost function in an imperfect production process via genetic algorithm. Math. Comput. Model. 42, 977\u2013990 (2005)","journal-title":"Math. Comput. Model."},{"key":"9160_CR23","first-page":"83","volume":"20","author":"NK Mahapatra","year":"2004","unstructured":"Mahapatra, N.K., Maiti, M.: Inventory model for breakable items with uncertain setup time. Tamsui Oxf. J. Manag. Sci. 20, 83\u2013102 (2004)","journal-title":"Tamsui Oxf. J. Manag. Sci."},{"key":"9160_CR24","doi-asserted-by":"crossref","first-page":"525","DOI":"10.1016\/j.amc.2006.10.012","volume":"188","author":"P Pal","year":"2007","unstructured":"Pal, P., Bhunia, A.K., Goyal, S.K.: On optimal partially integrated production and marketing policy with variable demand under flexibility and reliability considerations via Genetic Algorithm. Appl. Math. Comput. 188, 525\u2013537 (2007)","journal-title":"Appl. Math. Comput."},{"key":"9160_CR25","doi-asserted-by":"crossref","first-page":"1733","DOI":"10.1016\/j.mcm.2008.10.019","volume":"49","author":"D Panda","year":"2009","unstructured":"Panda, D., Maiti, M.: Multi-item inventory models with price dependent demand under flexibility and reliability consideration and imprecise space constraint: a geometric programming approach. Math. Comput. Model. 49, 1733\u20131749 (2009)","journal-title":"Math. Comput. Model."},{"key":"9160_CR26","doi-asserted-by":"crossref","first-page":"998","DOI":"10.1287\/mnsc.31.8.998","volume":"31","author":"EL Porteus","year":"1985","unstructured":"Porteus, E.L.: Investing in reduced set-ups in the EOQ model. Manag. Sci. 31, 998\u20131010 (1985)","journal-title":"Manag. Sci."},{"key":"9160_CR27","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","volume":"34","author":"EL Porteus","year":"1986","unstructured":"Porteus, E.L.: Optimal lot sizing, process quality improvement and set-up cost reduction. Oper. Res. 34, 137\u2013144 (1986)","journal-title":"Oper. Res."},{"key":"9160_CR28","first-page":"47","volume":"18","author":"MJ Rosenblatt","year":"1986","unstructured":"Rosenblatt, M.J., Lee, H.L.: Economic production cycle with imperfect production processes. IIE Trans. 18, 47\u201355 (1986)","journal-title":"IIE Trans."},{"key":"9160_CR29","doi-asserted-by":"crossref","first-page":"1409","DOI":"10.1080\/00207720903576498","volume":"42","author":"MD Roy","year":"2011","unstructured":"Roy, M.D., Sana, S.S., Chaudhuri, K.: An economic order quantity model of imperfect quality items with partial backlogging. Int. J. Syst. Sci. 42, 1409\u20131419 (2011a)","journal-title":"Int. J. Syst. Sci."},{"key":"9160_CR30","doi-asserted-by":"crossref","first-page":"2528","DOI":"10.1016\/j.mcm.2011.06.015","volume":"54","author":"MD Roy","year":"2011","unstructured":"Roy, M.D., Sana, S.S., Chaudhuri, K.: An optimal shipment strategy for imperfect items in a stock-out situation. Math. Comput. Model. 54, 2528\u20132543 (2011b)","journal-title":"Math. Comput. Model."},{"key":"9160_CR31","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1016\/j.ejor.2009.01.041","volume":"200","author":"SS Sana","year":"2010","unstructured":"Sana, S.S.: A production-inventory model in an imperfect production process. Eur. J. Oper. Res. 200, 451\u2013464 (2010a)","journal-title":"Eur. J. Oper. Res."},{"key":"9160_CR32","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.ejor.2009.02.027","volume":"201","author":"SS Sana","year":"2010","unstructured":"Sana, S.S.: An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201, 158\u2013170 (2010b)","journal-title":"Eur. J. Oper. Res."},{"key":"9160_CR33","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1016\/j.dss.2010.11.012","volume":"50","author":"SS Sana","year":"2011","unstructured":"Sana, S.S.: A production-inventory model of imperfect quality products in a three-layer supply chain. Decis. Support Syst. 50, 539\u2013547 (2011)","journal-title":"Decis. Support Syst."},{"key":"9160_CR34","first-page":"57","volume":"6","author":"SS Sana","year":"2004","unstructured":"Sana, S.S., Chaudhuri, K.: On a volume flexible production policy for a deteriorating item with time-dependent demand and shortages. Adv. Model. Optim. 6, 57\u201374 (2004a)","journal-title":"Adv. Model. Optim."},{"key":"9160_CR35","first-page":"61","volume":"7","author":"SS Sana","year":"2004","unstructured":"Sana, S.S., Chaudhuri, K.: On a volume flexible production policy for a deteriorating item with stock-dependent demand rate. Nonlinear Phenom. Complex Syst. 7, 61\u201368 (2004b)","journal-title":"Nonlinear Phenom. Complex Syst."},{"key":"9160_CR36","doi-asserted-by":"crossref","first-page":"635","DOI":"10.1080\/00207720903144495","volume":"41","author":"SS Sana","year":"2010","unstructured":"Sana, S. S., Chaudhuri, K.: An EMQ model in an imperfect production process. Int. J. Syst. Sci. 41, 635\u2013646 (2010)","journal-title":"Int. J. Syst. Sci."},{"key":"9160_CR37","doi-asserted-by":"crossref","first-page":"548","DOI":"10.1016\/j.ijpe.2006.05.005","volume":"105","author":"SS Sana","year":"2007","unstructured":"Sana, S.S., Goyal, S.K., Chaudhuri, K.: An imperfect production process in a volume flexible inventory model. Int. J. Prod. Econ. 105, 548\u2013559 (2007a)","journal-title":"Int. J. Prod. Econ."},{"key":"9160_CR38","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1504\/IJOR.2007.011444","volume":"2","author":"SS Sana","year":"2007","unstructured":"Sana, S.S., Goyal, S.K., Chaudhuri, K.: On a volume flexible inventory model for items with an imperfect production system. Int. J. Oper. Res. 2, 64\u201380 (2007b)","journal-title":"Int. J. Oper. Res."},{"key":"9160_CR39","first-page":"13543","volume":"38","author":"B Sarkar","year":"2011","unstructured":"Sarkar, B., Sana, S.S., Chaudhuri, K.: An imperfect production process for time varying demand with inflation and time value of money - An EMQ model. Expert Syst. Appl. 38, 13543\u201313548 (2011)","journal-title":"Expert Syst. Appl."},{"key":"9160_CR40","first-page":"32","volume":"14","author":"EA Silver","year":"1976","unstructured":"Silver, E.A.: Establishing the order quantity when the amount received is uncertain. INFOR 14, 32\u201339 (1976)","journal-title":"INFOR"},{"key":"9160_CR41","volume-title":"Principles of Inventory and Materials Management","author":"KD Tersine","year":"1982","unstructured":"Tersine, K.D.: Principles of Inventory and Materials Management. North-Holland, New York (1982)"},{"key":"9160_CR42","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1016\/0377-2217(87)90136-6","volume":"31","author":"P Beek Van","year":"1987","unstructured":"Van Beek, P., Putten, C.: OR contributions to flexibility improvement in production\/inventory systems. Eur. J. Oper. Res. 31, 52\u201360 (1987)","journal-title":"Eur. J. Oper. Res."},{"key":"9160_CR43","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/S0305-0483(97)00042-X","volume":"26","author":"CM Wright","year":"1998","unstructured":"Wright, C.M., Mehrez, A.: An overview of representative research of the relationships between quality and inventory. Omega 26, 29\u201347 (1998)","journal-title":"Omega"},{"key":"9160_CR44","doi-asserted-by":"crossref","first-page":"338","DOI":"10.1016\/S0019-9958(65)90241-X","volume":"8","author":"LA Zadeh","year":"1965","unstructured":"Zadeh, L.A.: Fuzzy sets. Inf. Control 8, 338\u2013353 (1965)","journal-title":"Inf. Control"},{"key":"9160_CR45","unstructured":"Zitzler, E., Thiele, L.: An evolutionary algorithm for multi-objective optimization: the strength Pareto approach, Technical report no. 43. Zurich, Computer engineering and networks laboratory Switzerland (1998)"}],"container-title":["Journal of Mathematical Modelling and Algorithms"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-011-9160-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10852-011-9160-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-011-9160-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,15]],"date-time":"2019-06-15T02:29:53Z","timestamp":1560565793000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10852-011-9160-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,9,8]]},"references-count":45,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2011,12]]}},"alternative-id":["9160"],"URL":"https:\/\/doi.org\/10.1007\/s10852-011-9160-6","relation":{},"ISSN":["1570-1166","1572-9214"],"issn-type":[{"value":"1570-1166","type":"print"},{"value":"1572-9214","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,9,8]]}}}