{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,10]],"date-time":"2026-05-10T07:56:53Z","timestamp":1778399813630,"version":"3.51.4"},"reference-count":20,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2012,8,12]],"date-time":"2012-08-12T00:00:00Z","timestamp":1344729600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Math Model Algor"],"published-print":{"date-parts":[[2013,6]]},"DOI":"10.1007\/s10852-012-9196-2","type":"journal-article","created":{"date-parts":[[2012,8,11]],"date-time":"2012-08-11T08:33:06Z","timestamp":1344673986000},"page":"117-133","source":"Crossref","is-referenced-by-count":9,"title":["Equipment Location in Machining Transfer Lines with Multi-spindle Heads"],"prefix":"10.1007","volume":"12","author":[{"given":"Olga","family":"Batta\u00efa","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Evgeny","family":"Gurevsky","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fatme","family":"Makssoud","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alexandre","family":"Dolgui","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,8,12]]},"reference":[{"key":"9196_CR1","doi-asserted-by":"crossref","unstructured":"Adam, F., Humphreys, P., eds.: Encyclopedia of Decision Making and Decision Support Technologies. Information Science Reference (2008)","DOI":"10.4018\/978-1-59904-843-7"},{"issue":"10","key":"9196_CR2","doi-asserted-by":"crossref","first-page":"2337","DOI":"10.1016\/j.cor.2011.11.022","volume":"39","author":"O Batta\u00efa","year":"2012","unstructured":"Batta\u00efa, O., Dolgui, A.: Reduction approaches for a generalized line balancing problem. Comput. Oper. Res. 39(10), 2337\u20132345 (2012)","journal-title":"Comput. Oper. Res."},{"issue":"2","key":"9196_CR3","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1007\/s10732-007-9063-x","volume":"15","author":"L Capacho","year":"2009","unstructured":"Capacho, L., Pastor, R., Dolgui, A., Guschinskaya, O.: An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem. Journal of Heuristics 15(2), 109\u2013132 (2009)","journal-title":"Journal of Heuristics"},{"issue":"10","key":"9196_CR4","doi-asserted-by":"crossref","first-page":"869","DOI":"10.1080\/07408170500531334","volume":"38","author":"A Dolgui","year":"2006","unstructured":"Dolgui, A., Finel, B., Guschinsky, N., Levin, G., Vernadat, F.: MIP approach to balancing transfer lines with blocks of parallel operations. IIE Trans. 38(10), 869\u2013882 (2006)","journal-title":"IIE Trans."},{"issue":"10","key":"9196_CR5","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1080\/09511920902870650","volume":"22","author":"J Dou","year":"2009","unstructured":"Dou, J., Dai, X., Meng, Z.: Precedence graph-oriented approach to optimise single-product flow-line configurations of reconfigurable manufacturing system. Int. J. Comput. Integr. Manuf. 22(10), 923\u2013940 (2009)","journal-title":"Int. J. Comput. Integr. Manuf."},{"key":"9196_CR6","unstructured":"Finel, B.: Structuration de lignes d\u2019usinage: m\u00e9thodes exactes et heuristiques. PhD thesis, Universit\u00e9 de Metz (2004)"},{"issue":"7","key":"9196_CR7","doi-asserted-by":"crossref","first-page":"771","DOI":"10.3166\/jesa.44.771-790","volume":"44","author":"O Guschinskaya","year":"2010","unstructured":"Guschinskaya, O.: Vers une optimisation de la configuration de syst\u00e8mes d\u2019usinage \u00e0 bo\u00eetiers multibroches. Journal Europ\u00e9en des Syst\u00e8mes Automatis\u00e9s 44(7), 771\u2013790 (2010)","journal-title":"Journal Europ\u00e9en des Syst\u00e8mes Automatis\u00e9s"},{"issue":"2","key":"9196_CR8","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1016\/j.ijpe.2008.11.018","volume":"120","author":"O Guschinskaya","year":"2009","unstructured":"Guschinskaya, O., Dolgui, A.: Comparison of exact and heuristic methods for a transfer line balancing problem. Int. J. Prod. Econ. 120(2), 276\u2013286 (2009)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"9196_CR9","doi-asserted-by":"crossref","first-page":"344","DOI":"10.1016\/j.cor.2007.10.010","volume":"36","author":"O Guschinskaya","year":"2007","unstructured":"Guschinskaya, O., Dolgui, A., Guschinsky, N., Levin, G.: Minimizing makespan for multi-spindle head machines with a mobile table. Comput. Oper. Res. 36(2), 344\u2013357 (2007)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"9196_CR10","doi-asserted-by":"crossref","first-page":"902","DOI":"10.1016\/j.ejor.2006.03.072","volume":"189","author":"O Guschinskaya","year":"2008","unstructured":"Guschinskaya, O., Dolgui, A., Guschinsky, N., Levin, G.: A heuristic multi-start decomposition approach for optimal design of serial machining lines. Eur. J. Oper. Res. 189(3), 902\u2013913 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"1\u20134","key":"9196_CR11","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/s00170-010-3053-0","volume":"55","author":"O Guschinskaya","year":"2011","unstructured":"Guschinskaya, O., Gurevsky, E., Dolgui, A., Eremeev, A.: Metaheuristic approaches for the design of machining lines. Int. J. Adv. Manuf. Technol. 55(1\u20134), 11\u201322 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"15","key":"9196_CR12","doi-asserted-by":"crossref","first-page":"4285","DOI":"10.1080\/00207540601078047","volume":"46","author":"J Ko","year":"2008","unstructured":"Ko, J., Hu, J.: Balancing of manufacturing systems with complex configurations for delayed product differentiation. Int. J. Prod. Res. 46(15), 4285\u20134308 (2008)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"9196_CR13","doi-asserted-by":"crossref","first-page":"188","DOI":"10.1016\/j.jmsy.2011.07.009","volume":"30","author":"S Li","year":"2011","unstructured":"Li, S., Wang, H., Hu, S., Lin, Y., Abell, J.: Automatic generation of assembly system configuration with equipment selection for automotive battery manufacturing. J. Manuf. Syst. 30(4), 188\u2013195 (2011)","journal-title":"J. Manuf. Syst."},{"issue":"1","key":"9196_CR14","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1108\/01445150610645684","volume":"26","author":"S Masood","year":"2006","unstructured":"Masood, S.: Line balancing and simulation of an automated production transfer line. Assem. Autom. 26(1), 69\u201374 (2006)","journal-title":"Assem. Autom."},{"issue":"19","key":"9196_CR15","doi-asserted-by":"crossref","first-page":"5525","DOI":"10.1080\/00207540802089876","volume":"47","author":"I Moon","year":"2009","unstructured":"Moon, I., Logendran, R., Lee, J.: Integrated assembly line balancing with resource restrictions. Int. J. Prod. Res. 47(19), 5525\u20135541 (2009)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"9196_CR16","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/j.jmsy.2010.08.001","volume":"29","author":"E Nazarian","year":"2010","unstructured":"Nazarian, E., Ko, J., Wang, H.: Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility. J. Manuf. Syst. 29(1), 35\u201346 (2010)","journal-title":"J. Manuf. Syst."},{"key":"9196_CR17","doi-asserted-by":"crossref","unstructured":"Nof, S. (ed.): Springer Handbook of Automation. Springer (2009)","DOI":"10.1007\/978-3-540-78831-7"},{"issue":"2","key":"9196_CR18","doi-asserted-by":"crossref","first-page":"194","DOI":"10.1080\/09537281003790515","volume":"22","author":"R \u00d6zdemir","year":"2011","unstructured":"\u00d6zdemir, R., Aya\u011f, Z.: An integrated approach to evaluating assembly-line design alternatives with equipment selection. Prod. Plan. Control 22(2), 194\u2013206 (2011)","journal-title":"Prod. Plan. Control"},{"issue":"22","key":"9196_CR19","doi-asserted-by":"crossref","first-page":"6323","DOI":"10.1080\/00207540701441988","volume":"46","author":"N Pekin","year":"2008","unstructured":"Pekin, N., Azizoglu, M.: Bi criteria flexible assembly line design problem with equipment decisions. Int. J. Prod. Res. 46(22), 6323\u20136343 (2008)","journal-title":"Int. J. Prod. Res."},{"key":"9196_CR20","unstructured":"Rose, S.: Multi-spindle machining\u2014a fast way to make a part. Tool. Prod. (7) (2000)"}],"container-title":["Journal of Mathematical Modelling and Algorithms in Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-012-9196-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10852-012-9196-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-012-9196-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:26:33Z","timestamp":1559269593000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10852-012-9196-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,12]]},"references-count":20,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2013,6]]}},"alternative-id":["9196"],"URL":"https:\/\/doi.org\/10.1007\/s10852-012-9196-2","relation":{},"ISSN":["2214-2487","2214-2495"],"issn-type":[{"value":"2214-2487","type":"print"},{"value":"2214-2495","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,8,12]]}}}