{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,3]],"date-time":"2026-06-03T11:43:31Z","timestamp":1780487011864,"version":"3.54.1"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2013,3,23]],"date-time":"2013-03-23T00:00:00Z","timestamp":1363996800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Math Model Algor"],"published-print":{"date-parts":[[2014,6]]},"DOI":"10.1007\/s10852-013-9220-1","type":"journal-article","created":{"date-parts":[[2014,5,30]],"date-time":"2014-05-30T08:33:30Z","timestamp":1401438810000},"page":"113-124","source":"Crossref","is-referenced-by-count":6,"title":["Integer Fuzzy Programming Approach in Bi-objective Selective Maintenance Allocation Problem"],"prefix":"10.1007","volume":"13","author":[{"given":"Irfan","family":"Ali","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"S. Suhaib","family":"Hasan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2013,3,23]]},"reference":[{"issue":"10","key":"9220_CR1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.14299\/ijser.2012.10.001","volume":"3","author":"I Ali","year":"2012","unstructured":"Ali, I., Hasan, S.S.: Fuzzy programming approach for a compromise allocation of repairable components. IJSER 3(10), 1\u20136 (2012)","journal-title":"IJSER"},{"key":"9220_CR2","first-page":"55","volume":"32","author":"I Ali","year":"2012","unstructured":"Ali, I., Khan, M.F., Bari, A.: A lexicographic goal programming approach for a compromise allocation of repairable components. Aligarh J. Stat. 32, 55\u201368 (2012)","journal-title":"Aligarh J. Stat."},{"issue":"3","key":"9220_CR3","doi-asserted-by":"crossref","first-page":"147","DOI":"10.4236\/ajor.2011.13016","volume":"1","author":"I Ali","year":"2011","unstructured":"Ali, I., Khan, M.F., Raghav, Y.S., Bari, A.: Allocating repairable and replaceable components for a system availability using selective maintenance with probabilistic constraints. Am. J. Oper. Res. 1(3), 147\u2013154 (2011)","journal-title":"Am. J. Oper. Res."},{"issue":"2","key":"9220_CR4","first-page":"9","volume":"31","author":"I Ali","year":"2011","unstructured":"Ali, I., Raghav, Y.S., Bari, A.: Allocating repairable and replaceable components for a system availability using selective maintenance: an integer solution. SaRS 31(2), 9\u201318 (2011)","journal-title":"SaRS"},{"issue":"6","key":"9220_CR5","doi-asserted-by":"crossref","first-page":"184","DOI":"10.4314\/ijest.v3i6.15","volume":"3","author":"I Ali","year":"2011","unstructured":"Ali, I., Raghav, Y.S., Bari, A.: Integer goal programming approach for finding a compromise allocation of repairable components. Int. J. Eng. Sci. Technol. 3(6), 184\u2013195 (2011)","journal-title":"Int. J. Eng. Sci. Technol."},{"key":"9220_CR6","author":"I Ali","year":"2013","unstructured":"Ali, I., Raghav, Y.S., Khan A, Faisal, M., Bari, A.: Selective maintenance in system reliability with random costs of repairing and replacing the components. Commun. Stat. Simul. Comput. (2013). doi: 10.1080\/03610918.2012.689063","journal-title":"Commun. Stat. Simul. Comput."},{"key":"9220_CR7","doi-asserted-by":"crossref","first-page":"576","DOI":"10.1109\/24.249589","volume":"41","author":"AK Dhingra","year":"1992","unstructured":"Dhingra, A.K.: Optimal apportionment of reliability and redundancy in series systems under multiple objectives. IEEE Trans. Reliab. 41, 576\u2013582 (1992)","journal-title":"IEEE Trans. Reliab."},{"issue":"3","key":"9220_CR8","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1016\/S0026-2714(96)00040-6","volume":"37","author":"HZ Huang","year":"1997","unstructured":"Huang, H.Z.: Fuzzy multi-objective optimization decision-making of reliability of series system. Microelectron. Reliab. 37(3), 447\u2013449 (1997)","journal-title":"Microelectron. Reliab."},{"issue":"5","key":"9220_CR9","first-page":"1","volume":"3","author":"MF Khan","year":"2012","unstructured":"Khan, M.F., Ali, I.: Allocation problem of repairable and replaceable components for a system reliability using selective maintenance: an integer solution. Int. J. Scientif. Eng. Res. 3(5), 1\u20134 (2012)","journal-title":"Int. J. Scientif. Eng. Res."},{"key":"9220_CR10","unstructured":"Khasawneh, M.T., Bowling, S.R., Kaewkuekool, S., Cho, B.R.: A cost-effective strength-stress reliability modeling and optimization in engineering design. In: Proceeding of the Industrial Engineering Research Conference, Orlando, 19\u201321 May 2002"},{"key":"9220_CR11","unstructured":"LINGO User\u2019s Guide published by Lindo Systems Inc., 1415 North Dayton Street, Chicago, Illinois-60622, USA (2001)"},{"issue":"1","key":"9220_CR12","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1016\/j.amc.2005.04.105","volume":"174","author":"GS Mahapatra","year":"2006","unstructured":"Mahapatra, G.S., Roy, T.K.: Fuzzy multi-objective mathematical programming on reliability optimization model. Appl. Math. Comput. 174(1), 643\u2013659 (2006)","journal-title":"Appl. Math. Comput."},{"key":"9220_CR13","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1109\/TR.1987.5222317","volume":"R-36","author":"KS Park","year":"1987","unstructured":"Park, K.S.: Fuzzy apportionment of system reliability. IEEE Trans. Reliab. R-36, 129\u2013132 (1987)","journal-title":"IEEE Trans. Reliab."},{"key":"9220_CR14","doi-asserted-by":"crossref","first-page":"253","DOI":"10.1016\/0951-8320(92)90131-4","volume":"37","author":"SS Rao","year":"1992","unstructured":"Rao, S.S., Dhingra, A.K.: Reliability and redundancy apportionment using crisp and fuzzy multi-objective optimization approaches. Reliab. Eng. Syst. Saf. 37, 253\u2013261 (1992)","journal-title":"Reliab. Eng. Syst. Saf."},{"key":"9220_CR15","first-page":"241","volume":"8","author":"V Ravi","year":"2000","unstructured":"Ravi, V., Reddy, P.J., Zimmermann, H.-J.: Fuzzy global optimization of complex system reliability. IEEE Trans. Reliab. 8, 241\u2013248 (2000)","journal-title":"IEEE Trans. Reliab."},{"key":"9220_CR16","unstructured":"Rice, W.F., Cassady, C.R., Nachlas, J.A.: Optimal maintenance plans under limited maintenance time. In: Proceedings of the Industrial Engineering Research Conference, vol.\u00a098 (1998)"},{"key":"9220_CR17","doi-asserted-by":"crossref","unstructured":"Wang, Z., Chen, T., Tang, K., Yao, X.: A multi-objective approach to redundancy allocation problem in parallel-series system. In: IEEE Congress Evolutionary Computation, pp.\u00a0582\u2013589 (2009)","DOI":"10.1109\/CEC.2009.4982998"}],"container-title":["Journal of Mathematical Modelling and Algorithms in Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-013-9220-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10852-013-9220-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-013-9220-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,4,5]],"date-time":"2022-04-05T05:15:50Z","timestamp":1649135750000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10852-013-9220-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,3,23]]},"references-count":17,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2014,6]]}},"alternative-id":["9220"],"URL":"https:\/\/doi.org\/10.1007\/s10852-013-9220-1","relation":{},"ISSN":["2214-2487","2214-2495"],"issn-type":[{"value":"2214-2487","type":"print"},{"value":"2214-2495","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,3,23]]}}}