{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T07:54:03Z","timestamp":1770969243411,"version":"3.50.1"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2013,8,24]],"date-time":"2013-08-24T00:00:00Z","timestamp":1377302400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Math Model Algor"],"published-print":{"date-parts":[[2014,9]]},"DOI":"10.1007\/s10852-013-9235-7","type":"journal-article","created":{"date-parts":[[2013,8,23]],"date-time":"2013-08-23T01:19:54Z","timestamp":1377220794000},"page":"233-245","source":"Crossref","is-referenced-by-count":8,"title":["The Two-stage Assembly Flow Shop Scheduling with an Availability Constraint: Worst Case Analysis"],"prefix":"10.1007","volume":"13","author":[{"given":"Hatem","family":"Hadda","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Najoua","family":"Dridi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sonia","family":"Hajri-Gabouj","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,8,24]]},"reference":[{"key":"9235_CR1","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1016\/j.ipl.2004.03.004","volume":"90","author":"J Breit","year":"2004","unstructured":"Breit, J.: An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint. Inf. Process. Lett. 90, 273\u2013278 (2004)","journal-title":"Inf. Process. Lett."},{"key":"9235_CR2","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1016\/S0167-6377(00)00033-X","volume":"26","author":"TCE Cheng","year":"2000","unstructured":"Cheng, T.C.E, Wang, G.: An improved heuristic for two-machine flowshop scheduling with an availability constraint. Oper. Res. Lett. 26, 223\u2013229 (2000)","journal-title":"Oper. Res. Lett."},{"key":"9235_CR3","unstructured":"Hadda, H., Dridi, N., Hajri-Gabouj, S.: The two-stage assembly flow shop scheduling with an availability constraint. In: Proc. 3rd Multidisciplinary International Conference on Scheduling: Theory and Application, pp.\u00a0184\u2013191. Paris, France (2007)"},{"key":"9235_CR4","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10288-009-0102-3","volume":"8","author":"H Hadda","year":"2010","unstructured":"Hadda, H., Dridi, N., Hajri-Gabouj, S.: An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs. 4OR-Q.\u00a0J. Oper. Res. 8, 87\u201399 (2010)","journal-title":"4OR-Q.\u00a0J. Oper. Res."},{"key":"9235_CR5","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s11590-009-0137-6","volume":"3","author":"H Hadda","year":"2009","unstructured":"Hadda, H.: A ( $\\frac 4 3 $ )-approximation algorithm for a special case of the two machine flow shop problem with several availability constraints. Optim. Lett. 3, 583\u2013592 (2009)","journal-title":"Optim. Lett."},{"key":"9235_CR6","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/s10288-010-0119-7","volume":"8","author":"H Hadda","year":"2010","unstructured":"Hadda, H.: An improved algorithm for the two machine flow shop problem with several availability constraints. 4OR-Q.\u00a0J. Oper. Res. 8, 271\u2013280 (2010)","journal-title":"4OR-Q.\u00a0J. Oper. Res."},{"key":"9235_CR7","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1007\/s11590-011-0281-7","volume":"6","author":"H Hadda","year":"2012","unstructured":"Hadda, H.: A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints. Optim. Lett. 6, 559\u2013569 (2012)","journal-title":"Optim. Lett."},{"key":"9235_CR8","doi-asserted-by":"crossref","first-page":"439","DOI":"10.1051\/ro:1999120","volume":"33","author":"M Haouari","year":"1999","unstructured":"Haouari, M., Daouas, T.: Optimal scheduling of the 3-machine assembly-type flow shop. RAIRO Oper. Res. 33, 439\u2013445 (1999)","journal-title":"RAIRO Oper. Res."},{"key":"9235_CR9","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1016\/S0377-2217(96)00312-8","volume":"103","author":"AMA Hariri","year":"1997","unstructured":"Hariri, A.M.A., Potts, C.N.: A branch and bound algorithm for the two-stage assembly scheduling problem. Eur. J. Oper. Res. 103, 547\u2013556 (1997)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR10","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson, S.M.: Optimal two- and three-stage production schedules with setup times included. Naval Res. Logist. Quart. 1, 61\u201368 (1954)","journal-title":"Naval Res. Logist. Quart."},{"key":"9235_CR11","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/S0377-2217(01)00083-2","volume":"136","author":"W Kubiak","year":"2002","unstructured":"Kubiak, W., Blazewicz, J., Formanowicz, P., Breit, J., Schmidt, G.: Two-machine flow shops with limited machine availability. Eur. J. Oper. Res. 136, 528\u2013540 (2002)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR12","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1016\/j.cor.2007.10.013","volume":"36","author":"MA Kubzin","year":"2009","unstructured":"Kubzin, M.A., Potts, C.N., Strusevich, V.A.: Approximation results for flow shop scheduling problems with machine availability constraints. Comput. Oper. Res. 36, 379\u2013390 (2009)","journal-title":"Comput. Oper. Res."},{"key":"9235_CR13","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0167-6377(96)00041-7","volume":"20","author":"CY Lee","year":"1997","unstructured":"Lee, C.Y.: Minimizing the makespan in the two-machine flow shop scheduling problem with an availability constraint. Oper. Res. Lett. 20, 129\u2013139 (1997)","journal-title":"Oper. Res. Lett."},{"key":"9235_CR14","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1016\/S0377-2217(97)00452-9","volume":"114","author":"CY Lee","year":"1999","unstructured":"Lee, C.Y., Two-machine flowshop scheduling with availability constraints. Eur. J. Oper. Res. 114, 420\u2013429 (1999)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR15","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1287\/mnsc.39.5.616","volume":"39","author":"CY Lee","year":"1993","unstructured":"Lee, C.Y., Cheng, T.C.E., Lin, B.M.T.: Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Manag. Sci. 39, 616\u2013625 (1993)","journal-title":"Manag. Sci."},{"key":"9235_CR16","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1002\/nav.10107","volume":"51","author":"CT Ng","year":"2004","unstructured":"Ng, C.T., Kovalyov, M.Y.: An FPTAS for shceduling a two-machine flowshop with one availability interval. Nav. Res. Logist. 51, 307\u2013315 (2004)","journal-title":"Nav. Res. Logist."},{"key":"9235_CR17","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1287\/opre.43.2.346","volume":"43","author":"CN Potts","year":"1995","unstructured":"Potts, C.N., Sevast\u2019janov, S.V., Strusevich, V.A., Van wassenhove, L.N., Zwaneveld, C.M.: The two-stage assembly scheduling problem: complexity and approximation. Oper. Res. 43, 346\u2013355 (1995)","journal-title":"Oper. Res."},{"key":"9235_CR18","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.cie.2009.04.014","volume":"58","author":"M Ying","year":"2010","unstructured":"Ying, M., Chengbin, C., Chunrong, Z.: A survey of scheduling with deterministic machine availability constraints. Comput. Ind. Eng. 58, 199\u2013211 (2010)","journal-title":"Comput. Ind. Eng."}],"container-title":["Journal of Mathematical Modelling and Algorithms in Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-013-9235-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10852-013-9235-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-013-9235-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,30]],"date-time":"2019-05-30T22:26:33Z","timestamp":1559255193000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10852-013-9235-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,8,24]]},"references-count":18,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2014,9]]}},"alternative-id":["9235"],"URL":"https:\/\/doi.org\/10.1007\/s10852-013-9235-7","relation":{},"ISSN":["2214-2487","2214-2495"],"issn-type":[{"value":"2214-2487","type":"print"},{"value":"2214-2495","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,8,24]]}}}