{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T09:59:08Z","timestamp":1770976748919,"version":"3.50.1"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2013,11,16]],"date-time":"2013-11-16T00:00:00Z","timestamp":1384560000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Math Model Algor"],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1007\/s10852-013-9245-5","type":"journal-article","created":{"date-parts":[[2013,11,15]],"date-time":"2013-11-15T10:47:47Z","timestamp":1384512467000},"page":"511-522","source":"Crossref","is-referenced-by-count":3,"title":["A PTAS for a Particular Case of the Two-machine Flow Shop with Limited Machine Availability"],"prefix":"10.1007","volume":"13","author":[{"given":"Hatem","family":"Hadda","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,11,16]]},"reference":[{"key":"9245_CR1","doi-asserted-by":"crossref","first-page":"1399","DOI":"10.1016\/j.cor.2004.09.034","volume":"33","author":"H Allaoui","year":"2006","unstructured":"Allaoui, H., Artiba, A.: Scheduling two-stage hybrid flow shop with availability constraints. Comput. Oper. Res. 33, 1399\u20131419 (2006)","journal-title":"Comput. Oper. Res."},{"key":"9245_CR2","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","volume":"1","author":"MR Garey","year":"1976","unstructured":"Garey, M.R., Johnson, D.S., Sethi, R.: The complexity of flow shop and job shop scheduling. Math. Oper. Res. 1, 117\u2013129 (1976)","journal-title":"Math. Oper. Res."},{"key":"9245_CR3","volume-title":"Computers and Intractability","author":"MR Garey","year":"1979","unstructured":"Garey, M.R., Johnson, D.S.: Computers and Intractability. Freeman, San Francisco (1979)"},{"key":"9245_CR4","unstructured":"Hadda, H.: A 4 3 $\\left (\\frac {4}{3}\\right )$ -approximation algorithm for a special case of the two machine flow shop problem with several availability constraints. Optim. Lett. 3, 583\u2013592 (2009)"},{"key":"9245_CR5","doi-asserted-by":"crossref","first-page":"271","DOI":"10.1007\/s10288-010-0119-7","volume":"8","author":"H Hadda","year":"2010","unstructured":"Hadda, H.: An improved algorithm for the two machine flow shop problem with several availability constraints. 4OR-Q. J. Oper. Res. 8, 271\u2013280 (2010)","journal-title":"4OR-Q. J. Oper. Res."},{"key":"9245_CR6","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1007\/s11590-011-0281-7","volume":"6","author":"H Hadda","year":"2011","unstructured":"Hadda, H.: A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints. Optim. Lett. 6, 559\u2013569 (2011)","journal-title":"Optim. Lett."},{"key":"9245_CR7","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10288-009-0102-3","volume":"8","author":"H Hadda","year":"2010","unstructured":"Hadda, H., Dridi, N., Hajri-Gabouj, S.: An improved heuristic for two-machine flow shop scheduling with an avilability constraint and nonresumable jobs. 4OR-Q. J. Oper. Res. 8, 87\u201399 (2010)","journal-title":"4OR-Q. J. Oper. Res."},{"key":"9245_CR8","author":"H Hadda","year":"2013","unstructured":"Hadda, H., Dridi, N., Hajri-Gabouj, S.: The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis. J. Math. Model. Algoritm. Oper. Res. (2013). doi: 10.1007\/s10852-013-9235-7","journal-title":"J. Math. Model. Algoritm. Oper. Res."},{"key":"9245_CR9","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1016\/S0377-2217(96)90070-3","volume":"89","author":"JA Hoogeveen","year":"1996","unstructured":"Hoogeveen, J.A., Lenstra, J.K., Veltman, B.: Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard. Eur. J. Oper. Res. 89, 172\u2013175 (1996)","journal-title":"Eur. J. Oper. Res."},{"key":"9245_CR10","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"SM Johnson","year":"1954","unstructured":"Johnson, S.M.: Optimal two- and three-stage production schedules with setup times included. Res. Log. Q. 1, 61\u201368 (1954)","journal-title":"Res. Log. Q."},{"key":"9245_CR11","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1016\/j.cor.2007.10.013","volume":"36","author":"MA Kubzin","year":"2009","unstructured":"Kubzin, M.A., Potts, C.N., Strusevich, V.A.: Approximation results for flow shop scheduling problems with machine availability constraints. Comput. Oper. Res. 36, 379\u2013390 (2009)","journal-title":"Comput. Oper. Res."},{"key":"9245_CR12","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/S0377-2217(01)00083-2","volume":"136","author":"W Kubiak","year":"2002","unstructured":"Kubiak, W., Blazewicz, J., Formanowicz, P., Breit, J., Schmidt, G.: Two-machine flow shops with limited machine availability. Eur. J. Oper. Res. 136, 528\u2013540 (2002)","journal-title":"Eur. J. Oper. Res."},{"key":"9245_CR13","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0167-6377(96)00041-7","volume":"20","author":"CY Lee","year":"1997","unstructured":"Lee, C.Y.: Minimizing the makespan in the two-machine flow shop scheduling problem with an availability constraint. Oper. Res. Lett. 20, 129\u2013139 (1997)","journal-title":"Oper. Res. Lett."},{"key":"9245_CR14","doi-asserted-by":"crossref","first-page":"420","DOI":"10.1016\/S0377-2217(97)00452-9","volume":"114","author":"CY Lee","year":"1999","unstructured":"Lee, C.Y.: Two-machine flowshop scheduling with availability constraints. Eur. J. Oper. Res. 114, 420\u2013429 (1999)","journal-title":"Eur. J. Oper. Res."},{"key":"9245_CR15","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1002\/nav.10107","volume":"51","author":"CT Ng","year":"2004","unstructured":"Ng, C.T., Kovalyov, M.Y.: An FPTAS for scheduling a two-machine flowshop with one unavailability interval. Nav. Res. Log. 51, 307\u2013315 (2004)","journal-title":"Nav. Res. Log."},{"key":"9245_CR16","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1016\/S0304-3975(98)00157-1","volume":"237","author":"P Schuurman","year":"2000","unstructured":"Schuurman, P., Woeginger, G.J.: A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem. Theor. Comput. Sci. 237, 105\u2013122 (2000)","journal-title":"Theor. Comput. Sci."},{"key":"9245_CR17","doi-asserted-by":"crossref","unstructured":"Williamson, D.P., Hall, L.A., Hoogeveen, J.A., Hurkens, C.AJ., Lenstra, J.K., Sevast\u2019janov, S.V., Shmoys, D.B.: Short shop schedules. Oper. Res. 45, 288\u2013294","DOI":"10.1287\/opre.45.2.288"}],"container-title":["Journal of Mathematical Modelling and Algorithms in Operations Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-013-9245-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10852-013-9245-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10852-013-9245-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T02:26:33Z","timestamp":1559269593000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10852-013-9245-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,11,16]]},"references-count":17,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2014,12]]}},"alternative-id":["9245"],"URL":"https:\/\/doi.org\/10.1007\/s10852-013-9245-5","relation":{},"ISSN":["2214-2487","2214-2495"],"issn-type":[{"value":"2214-2487","type":"print"},{"value":"2214-2495","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,11,16]]}}}