{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,4]],"date-time":"2022-04-04T00:34:44Z","timestamp":1649032484078},"reference-count":11,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2009,2,6]],"date-time":"2009-02-06T00:00:00Z","timestamp":1233878400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Comb Optim"],"published-print":{"date-parts":[[2010,10]]},"DOI":"10.1007\/s10878-009-9211-3","type":"journal-article","created":{"date-parts":[[2009,2,4]],"date-time":"2009-02-04T19:18:47Z","timestamp":1233775127000},"page":"285-306","source":"Crossref","is-referenced-by-count":2,"title":["On-line machine scheduling with batch setups"],"prefix":"10.1007","volume":"20","author":[{"given":"Lele","family":"Zhang","sequence":"first","affiliation":[]},{"given":"Andrew","family":"Wirth","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2009,2,6]]},"reference":[{"key":"9211_CR1","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A Allahverdi","year":"1999","unstructured":"Allahverdi A, Gupta JN, Aldowaisan T (1999) A review of scheduling research involving setup considerations. Omega, Int J Manag Sci 27:219\u2013239","journal-title":"Omega, Int J Manag Sci"},{"key":"9211_CR2","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A Allahverdi","year":"2008","unstructured":"Allahverdi A, Ng CT, Cheng TCE, Kovalyov MY (2008) A survey of scheduling problems with setup times or costs. Eur J Oper Res 187:985\u20131032","journal-title":"Eur J Oper Res"},{"key":"9211_CR3","doi-asserted-by":"crossref","first-page":"953","DOI":"10.1080\/15458830.1996.11770748","volume":"28","author":"TCE Cheng","year":"1996","unstructured":"Cheng TCE, Chen ZL, Kovalyov MY, Lin BMT (1996) Parallel-machine batching and scheduling to minimize total completion time. IIE Trans 28:953\u2013956","journal-title":"IIE Trans"},{"issue":"3","key":"9211_CR4","doi-asserted-by":"crossref","first-page":"426","DOI":"10.1287\/opre.37.3.426","volume":"37","author":"EG Coffman","year":"1989","unstructured":"Coffman EG, Nozari A, Yannakakis M (1989) Optimal scheduling of products with two subassembles on a single machine. Oper Res Lett 37(3):426\u2013436","journal-title":"Oper Res Lett"},{"key":"9211_CR5","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1007\/BF02248589","volume":"26","author":"EG Coffman","year":"1990","unstructured":"Coffman EG, Yannakakis M, Magazine MJ, Santos C (1990) Batch sizing and job sequencing on a single machine. Ann Oper Res 26:135\u2013147","journal-title":"Ann Oper Res"},{"key":"9211_CR6","first-page":"424","volume-title":"LNCS","author":"B Gfeller","year":"2006","unstructured":"Gfeller B, Peeters L, Weber B, Widmayer P (2006a) Online single machine batch scheduling. In: LNCS, vol 4162. Springer, Berlin, pp 424\u2013435"},{"key":"9211_CR7","first-page":"1","volume":"514","author":"B Gfeller","year":"2006","unstructured":"Gfeller B, Peeters L, Weber B, Widmayer P (2006b) Single machine batch scheduling with release times. Institute of Theoretical Computer Science. ETH Zurich, Tech Rep 514:1\u201323","journal-title":"ETH Zurich, Tech Rep"},{"key":"9211_CR8","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"CN Potts","year":"2000","unstructured":"Potts CN, Kovalyov MY (2000) Scheduling with batching: a review. Eur J Oper Res 120:228\u2013249","journal-title":"Eur J Oper Res"},{"key":"9211_CR9","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/0167-6377(85)90011-2","volume":"4","author":"C Santos","year":"1985","unstructured":"Santos C, Magazine MJ (1985) Batching in single operation manufacturing systems. Oper Res Lett 4:99\u2013103","journal-title":"Oper Res Lett"},{"key":"9211_CR10","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/0167-6377(92)90027-Z","volume":"11","author":"DF Shallcross","year":"1992","unstructured":"Shallcross DF (1992) A polynomial algorithm for a one machine batching problem. Oper Res Lett 11:213\u2013218","journal-title":"Oper Res Lett"},{"issue":"4","key":"9211_CR11","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"S Webster","year":"1995","unstructured":"Webster S, Baker KR (1995) Scheduling groups for jobs on a single machine. Oper Res 43(4):692\u2013703","journal-title":"Oper Res"}],"container-title":["Journal of Combinatorial Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-009-9211-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10878-009-9211-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-009-9211-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T00:18:13Z","timestamp":1559261893000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10878-009-9211-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,2,6]]},"references-count":11,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2010,10]]}},"alternative-id":["9211"],"URL":"https:\/\/doi.org\/10.1007\/s10878-009-9211-3","relation":{},"ISSN":["1382-6905","1573-2886"],"issn-type":[{"value":"1382-6905","type":"print"},{"value":"1573-2886","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,2,6]]}}}