{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,14]],"date-time":"2026-01-14T00:41:17Z","timestamp":1768351277780,"version":"3.49.0"},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2015,3,20]],"date-time":"2015-03-20T00:00:00Z","timestamp":1426809600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Comb Optim"],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1007\/s10878-015-9861-2","type":"journal-article","created":{"date-parts":[[2015,3,19]],"date-time":"2015-03-19T11:48:04Z","timestamp":1426765684000},"page":"949-966","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":24,"title":["Predictive-reactive scheduling for single surgical suite subject to random emergency surgery"],"prefix":"10.1007","volume":"30","author":[{"given":"Bing","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xingbao","family":"Han","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xianxia","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shaohua","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2015,3,20]]},"reference":[{"issue":"3","key":"9861_CR1","doi-asserted-by":"crossref","first-page":"921","DOI":"10.1016\/j.ejor.2009.04.011","volume":"201","author":"B Cardoen","year":"2010","unstructured":"Cardoen B, Demeulemeester E, Beli\u00ebn J (2010) Operating room planning and scheduling: a literature review. Eur J Oper Res 201(3):921\u2013932","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9861_CR2","doi-asserted-by":"crossref","first-page":"797","DOI":"10.1007\/s10878-010-9330-x","volume":"22","author":"BC Choi","year":"2011","unstructured":"Choi BC, Leung JYT, Pinedo ML (2011) Minimizing makespan in an ordered flow shop with machine-dependent processing times. J Comb Optim 22(4):797\u2013818","journal-title":"J Comb Optim"},{"issue":"4","key":"9861_CR3","doi-asserted-by":"crossref","first-page":"799","DOI":"10.1007\/s10878-012-9485-8","volume":"26","author":"J Dong","year":"2013","unstructured":"Dong J, Chen Y, Zhang A, Yang Q (2013) A new three-machine shop scheduling: complexity and approximation algorithm. J Comb Optim 26(4):799\u2013810","journal-title":"J Comb Optim"},{"issue":"1","key":"9861_CR4","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ijpe.2006.08.030","volume":"112","author":"H Fei","year":"2008","unstructured":"Fei H, Chu C, Meskens N, Artiba A (2008) Solving surgical cases assignment problem by a branch-and-price approach. Int J Prod Econ 112(1):96\u2013108","journal-title":"Int J Prod Econ"},{"issue":"2","key":"9861_CR5","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/j.cie.2009.02.012","volume":"58","author":"H Fei","year":"2010","unstructured":"Fei H, Meskens N, Chu C (2010) A planning and scheduling problem for an operating theatre using an open scheduling strategy. Comput Ind Eng 58(2):221\u2013230","journal-title":"Comput Ind Eng"},{"issue":"1","key":"9861_CR6","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/S0925-5273(03)00087-2","volume":"85","author":"A Guinet","year":"2003","unstructured":"Guinet A, Chaabane S (2003) Operating theatre planning. Int J Prod Econ 85(1):69\u201381","journal-title":"Int J Prod Econ"},{"issue":"3","key":"9861_CR7","doi-asserted-by":"crossref","first-page":"1038","DOI":"10.1016\/j.ejor.2006.08.022","volume":"185","author":"E Hans","year":"2008","unstructured":"Hans E, Wullink G, Van Houdenhoven M, Kazemier G (2008) Robust surgery loading. Eur J Oper Res 185(3):1038\u20131050","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9861_CR8","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1002\/nav.10060","volume":"50","author":"VN Hsu","year":"2003","unstructured":"Hsu VN, de Matta R, Lee CY (2003) Scheduling patients in an ambulatory surgical center. Nav Res Log 50(3):218\u2013238","journal-title":"Nav Res Log"},{"issue":"1","key":"9861_CR9","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1007\/s10479-010-0777-z","volume":"186","author":"O Lambrechts","year":"2011","unstructured":"Lambrechts O, Demeulemeester E, Herroelen W (2011) Time slack-based techniques for robust project scheduling subject to resource uncertainty. Ann Oper Res 186(1):443\u2013464","journal-title":"Ann Oper Res"},{"issue":"3","key":"9861_CR10","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1016\/j.ejor.2006.02.057","volume":"185","author":"M Lamiri","year":"2008","unstructured":"Lamiri M, Xie X, Dolgui A, Grimaud F (2008) A stochastic model for operating room planning with elective and emergency demand for surgery. Eur J Oper Res 185(3):1026\u20131037","journal-title":"Eur J Oper Res"},{"issue":"2","key":"9861_CR11","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1016\/j.ejor.2014.03.043","volume":"238","author":"S Lee","year":"2014","unstructured":"Lee S, Yih Y (2014) Reducing patient-flow delays in surgical suites through determining start-times of surgical cases. Eur J Oper Res 238(2):620\u2013629","journal-title":"Eur J Oper Res"},{"issue":"12","key":"9861_CR12","first-page":"2387","volume":"31","author":"Q Li","year":"2012","unstructured":"Li Q, Wang B, Wang X (2012) Predictable scheduling approach for single machine subject to random machine breakdown. Syst Eng Theory Pract 31(12):2387\u20132393","journal-title":"Syst Eng Theory Pract"},{"issue":"5","key":"9861_CR13","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1097\/00132586-199610000-00025","volume":"40","author":"A Macario","year":"1996","unstructured":"Macario A, Vitez T, Dunn B, McDonald T (1996) Where are the costs in perioperative care? Analysis of hospital costs and charges for inpatient surgical care. Surv Anesthesiol 40(5):283","journal-title":"Surv Anesthesiol"},{"issue":"5","key":"9861_CR14","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1007\/s10951-012-0275-z","volume":"15","author":"C Mannino","year":"2012","unstructured":"Mannino C, Nilssen EJ, Nordlander TE (2012) A pattern based, robust approach to cyclic master surgery scheduling. J Sched 15(5):553\u2013563","journal-title":"J Sched"},{"issue":"1","key":"9861_CR15","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1080\/095119299130443","volume":"12","author":"SV Mehta","year":"1999","unstructured":"Mehta SV (1999) Predictable scheduling of a single machine subject to breakdowns. Int J Comput Integr Manuf 12(1):15\u201338","journal-title":"Int J Comput Integr Manuf"},{"issue":"3","key":"9861_CR16","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1109\/70.678447","volume":"14","author":"SV Mehta","year":"1998","unstructured":"Mehta SV, Uzsoy RM (1998) Predictable scheduling of a job shop subject to breakdowns. IEEE Trans Robot Automat 14(3):365\u2013378","journal-title":"IEEE Trans Robot Automat"},{"issue":"9","key":"9861_CR17","doi-asserted-by":"crossref","first-page":"2807","DOI":"10.1016\/j.cor.2006.12.030","volume":"35","author":"Q Pan","year":"2008","unstructured":"Pan Q, Tasgetiren MF, Liang Y (2008) A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem. Comput Oper Res 35(9):2807\u20132839","journal-title":"Comput Oper Res"},{"issue":"8","key":"9861_CR18","doi-asserted-by":"crossref","first-page":"2498","DOI":"10.1016\/j.cor.2008.10.008","volume":"36","author":"Q Pan","year":"2009","unstructured":"Pan Q, Wang L, Qian B (2009) A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems. Comput Oper Res 36(8):2498\u20132511","journal-title":"Comput Oper Res"},{"issue":"3","key":"9861_CR19","doi-asserted-by":"crossref","first-page":"668","DOI":"10.1016\/j.ins.2010.10.009","volume":"181","author":"Q Pan","year":"2011","unstructured":"Pan Q, Wang L, Gao L, Li W (2011) An effective hybrid discrete differential evolution algorithm for the flow shop scheduling with intermediate buffers. Inf Sci 181(3):668\u2013685","journal-title":"Inf Sci"},{"issue":"3","key":"9861_CR20","doi-asserted-by":"crossref","first-page":"1011","DOI":"10.1016\/j.ejor.2006.03.059","volume":"185","author":"DN Pham","year":"2008","unstructured":"Pham DN, Klinkert A (2008) Surgical case scheduling as a generalized job shop scheduling problem. Eur J Oper Res 185(3):1011\u20131025","journal-title":"Eur J Oper Res"},{"issue":"4","key":"9861_CR21","doi-asserted-by":"crossref","first-page":"546","DOI":"10.1057\/jors.2013.112","volume":"65","author":"S Rachuba","year":"2013","unstructured":"Rachuba S, Werners B (2013) A robust approach for scheduling in hospitals using multiple objectives. J Oper Res Soc 65(4):546\u2013556","journal-title":"J Oper Res Soc"},{"issue":"2","key":"9861_CR22","doi-asserted-by":"crossref","first-page":"336","DOI":"10.1145\/62.65","volume":"31","author":"H R\u00f6ck","year":"1984","unstructured":"R\u00f6ck H (1984) The three-machine no-wait flow shop is NP-complete. J ACM 31(2):336\u2013345","journal-title":"J ACM"},{"issue":"3","key":"9861_CR23","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1016\/S0377-2217(99)00311-2","volume":"126","author":"I Sabuncuoglu","year":"2000","unstructured":"Sabuncuoglu I, Bay\u0131z M (2000) Analysis of reactive scheduling problems in a job shop environment. Eur J Oper Res 126(3):567\u2013586","journal-title":"Eur J Oper Res"},{"issue":"2","key":"9861_CR24","doi-asserted-by":"crossref","first-page":"646","DOI":"10.1016\/j.ijpe.2012.10.004","volume":"141","author":"A Saremi","year":"2013","unstructured":"Saremi A, Jula P, ElMekkawy T, Wang GG (2013) Appointment scheduling of outpatient surgical services in a multistage operating room department. Int J Prod Econ 141(2):646\u2013658","journal-title":"Int J Prod Econ"},{"issue":"4","key":"9861_CR25","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1007\/s10696-011-9111-6","volume":"24","author":"K Stuart","year":"2012","unstructured":"Stuart K, Kozan E (2012) Reactive scheduling model for the operating theatre. Flex Serv Manuf J 24(4):400\u2013421","journal-title":"Flex Serv Manuf J"},{"issue":"2","key":"9861_CR26","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1016\/j.orhc.2012.05.002","volume":"1","author":"J Essen Van","year":"2012","unstructured":"Van Essen J, Hans E, Hurink J, Oversberg A (2012) Minimizing the waiting time for emergency surgery. Oper Res Health Care 1(2):34\u201344","journal-title":"Oper Res Health Care"},{"issue":"5","key":"9861_CR27","first-page":"667","volume":"32","author":"B Wang","year":"2006","unstructured":"Wang B, Xi Y (2006) Rolling partial rescheduling with dual objectives for single machine subject to disruptions. Acta Autom Sin 32(5):667","journal-title":"Acta Autom Sin"},{"issue":"1","key":"9861_CR28","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0305-0548(93)90091-V","volume":"20","author":"SD Wu","year":"1993","unstructured":"Wu SD, Storer RH, Pei-Chann C (1993) One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Oper Res 20(1):1\u201314","journal-title":"Comput Oper Res"},{"issue":"6","key":"9861_CR29","doi-asserted-by":"crossref","first-page":"543","DOI":"10.1007\/s10916-007-9096-6","volume":"31","author":"G Wullink","year":"2007","unstructured":"Wullink G, Van Houdenhoven M, Hans EW, Van Oostrum JM, Van der Lans M, Kazemier G (2007) Closing emergency operating rooms improves efficiency. J Med Syst 31(6):543\u2013546","journal-title":"J Med Syst"},{"issue":"3","key":"9861_CR30","doi-asserted-by":"crossref","first-page":"1267","DOI":"10.1016\/j.ejor.2006.06.077","volume":"189","author":"B Yang","year":"2008","unstructured":"Yang B, Geunes J (2008) Predictive-reactive scheduling on a single resource with uncertain future jobs. Eur J Oper Res 189(3):1267\u20131283","journal-title":"Eur J Oper Res"},{"issue":"3","key":"9861_CR31","doi-asserted-by":"crossref","first-page":"545","DOI":"10.1007\/s10878-012-9535-2","volume":"27","author":"L Zhong","year":"2014","unstructured":"Zhong L, Luo S, Wu L, Xu L, Yang J, Tang G (2014) A two-stage approach for surgery scheduling. J Comb Optim 27(3):545\u2013556","journal-title":"J Comb Optim"}],"container-title":["Journal of Combinatorial Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-015-9861-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10878-015-9861-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-015-9861-2","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T04:23:26Z","timestamp":1559276606000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10878-015-9861-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,3,20]]},"references-count":31,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,11]]}},"alternative-id":["9861"],"URL":"https:\/\/doi.org\/10.1007\/s10878-015-9861-2","relation":{},"ISSN":["1382-6905","1573-2886"],"issn-type":[{"value":"1382-6905","type":"print"},{"value":"1573-2886","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,3,20]]}}}