{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T14:50:19Z","timestamp":1769957419299,"version":"3.49.0"},"reference-count":30,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2021,4,21]],"date-time":"2021-04-21T00:00:00Z","timestamp":1618963200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2021,4,21]],"date-time":"2021-04-21T00:00:00Z","timestamp":1618963200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Comb Optim"],"published-print":{"date-parts":[[2021,7]]},"DOI":"10.1007\/s10878-021-00733-1","type":"journal-article","created":{"date-parts":[[2021,4,21]],"date-time":"2021-04-21T19:32:01Z","timestamp":1619033521000},"page":"151-173","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Suboptimal sliding manifold For nonlinear supply chain with time delay"],"prefix":"10.1007","volume":"42","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7961-6275","authenticated-orcid":false,"given":"Sajjad Aslani","family":"Khiavi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hamid","family":"Khaloozadeh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fahimeh","family":"Soltanian","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2021,4,21]]},"reference":[{"issue":"1","key":"733_CR1","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1186\/2210-4690-2-4","volume":"2","author":"FM Asif","year":"2012","unstructured":"Asif FM, Bianchi C, Rashid A, Niclescu CM (2012) Performance analysis of the closed - loop supply chain. J Remanufacturing 2(1):1\u201321","journal-title":"J Remanufacturing"},{"issue":"5","key":"733_CR2","doi-asserted-by":"publisher","first-page":"499","DOI":"10.1080\/13873954.2019.1663876","volume":"25","author":"S Aslani","year":"2019","unstructured":"Aslani S, Khaloozadeh H, Soltanian F (2019) Nonlinear modelling and performance analysis of a closed-loop supply chain in the presence of stochastic noise. Math Comput Model Dyn Syst 25(5):499\u2013521","journal-title":"Math Comput Model Dyn Syst"},{"issue":"1","key":"733_CR3","first-page":"13","volume":"32","author":"S Aslani","year":"2021","unstructured":"Aslani S, Khaloozadeh H, Soltanian F (2021) Regulating bullwhip effect in supply chain with hybride recycling channels using inear quadraticguassian controller. Int J Ind Eng Prod Res 32(1):13\u201327","journal-title":"Int J Ind Eng Prod Res"},{"issue":"2","key":"733_CR4","first-page":"203","volume":"14","author":"S Aslani","year":"2021","unstructured":"Aslani S, Skandari S (2021) The design of inverse network DEA model for measuring the bullwhip effect in supply chains with uncertain demands. J Optim Ind Eng 14(2):203\u2013214","journal-title":"J Optim Ind Eng"},{"key":"733_CR5","doi-asserted-by":"crossref","unstructured":"Agaran, B., Walter, W., Buchanan, M, K. and Yurtseven. (2007) Regulating bullwhip effect in supply chain through modern control theory. IEEE Conference USA.","DOI":"10.1109\/PICMET.2007.4349573"},{"issue":"11","key":"733_CR6","doi-asserted-by":"publisher","first-page":"2543","DOI":"10.1080\/00207721.2014.999263","volume":"47","author":"Y Batmani","year":"2015","unstructured":"Batmani Y, Khaloozadeh H (2015) On the design of suboptimal sliding manifold for a class of nonlinear uncertain time-delay systems. Int J Syst Sci 47(11):2543\u20132552","journal-title":"Int J Syst Sci"},{"issue":"5","key":"733_CR7","first-page":"1","volume":"16","author":"Y Batmani","year":"2014","unstructured":"Batmani Y, Khaloozadeh H (2014) On the design of observe for nonlinear time-delay systems. Asian J Control 16(5):1\u201311","journal-title":"Asian J Control"},{"key":"733_CR8","doi-asserted-by":"publisher","first-page":"281","DOI":"10.1016\/S0925-5273(98)00079-6","volume":"55","author":"F Beamon","year":"1998","unstructured":"Beamon F, Benita M (1998) Supply chain design and analysis: models and method. Int J Prod Econ 55:281\u2013294","journal-title":"Int J Prod Econ"},{"key":"733_CR9","doi-asserted-by":"publisher","first-page":"436","DOI":"10.1287\/mnsc.46.3.436.12069","volume":"46","author":"F Chen","year":"2000","unstructured":"Chen F, Drezner Z, Ryan J, Simchi-levi D (2000) Quantifying the bullwhip effect in a simple supply chain: the impact of forecasting, lead time, and information. Manage Sci 46:436\u2013443","journal-title":"Manage Sci"},{"key":"733_CR10","doi-asserted-by":"publisher","first-page":"567","DOI":"10.1016\/S0377-2217(02)00369-7","volume":"147","author":"J Dejonckheere","year":"2003","unstructured":"Dejonckheere J, Disney SM, Lambrecht MR, Towill DR (2003) Measuring and avoiding the bullwhip effect. Eur J Oper Res 147:567\u2013590","journal-title":"Eur J Oper Res"},{"key":"733_CR11","first-page":"67","volume":"34","author":"JW Forrester","year":"1958","unstructured":"Forrester JW (1958) Industrial Dynamics, A major breakthrough for decision makers. Harv Bus Rev 34:67\u201396","journal-title":"Harv Bus Rev"},{"issue":"1","key":"733_CR12","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1007\/s13676-014-0043-7","volume":"3","author":"N Gao","year":"2014","unstructured":"Gao N, Ryan SM (2014) Robust design of a closed loop supply chain network for uncertain carbon regulations and random product flow. Euro J Transport Logist 3(1):5\u201334","journal-title":"Euro J Transport Logist"},{"key":"733_CR13","volume-title":"Model for integrated production planning and order selection","author":"J Geunes","year":"2002","unstructured":"Geunes J, Romeijin HE, Taaffe K (2002) Model for integrated production planning and order selection. Industrial Engineering Research, Orlando"},{"issue":"1","key":"733_CR14","doi-asserted-by":"publisher","first-page":"37","DOI":"10.1016\/j.ijpe.2011.09.007","volume":"136","author":"CH Glock","year":"2012","unstructured":"Glock CH (2012) Lead time reduction strategies in a single vendor single- buyer integrated inventory model with lot size dependent lead times and stochastic demand. Int J Prod Econ 136(1):37\u201344","journal-title":"Int J Prod Econ"},{"key":"733_CR15","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1016\/j.tre.2014.01.004","volume":"63","author":"J Heydari","year":"2014","unstructured":"Heydari J (2014) Lead time variation control using reliable shipment equipment: an incentive scheme for supply chain coordination. Transp Res Part E Logist Transp Rev 63:44\u201358","journal-title":"Transp Res Part E Logist Transp Rev"},{"key":"733_CR16","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ejor.2014.11.034","volume":"244","author":"P Jun","year":"2015","unstructured":"Jun P, Panos M, Pardalos X, Liu W, Fan S, Yang. (2015) Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan. Eur J Oper Res 244:13\u201325","journal-title":"Eur J Oper Res"},{"key":"733_CR17","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.omega.2017.12.003","volume":"82","author":"P Jun","year":"2019","unstructured":"Jun P, Xinbao L, Wenjuan F, Panos M, Pardalos S, Lu. (2019) A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers. Omega 82:55\u201369","journal-title":"Omega"},{"issue":"4","key":"733_CR18","doi-asserted-by":"publisher","first-page":"462","DOI":"10.1016\/j.jmsy.2014.04.002","volume":"33","author":"JK Jha","year":"2014","unstructured":"Jha JK, Shanker K (2014) An integrated inventory problem with transportation in a divergent supply chain under service level constraint. J Manufacturing Syst 33(4):462\u2013475","journal-title":"J Manufacturing Syst"},{"issue":"2","key":"733_CR19","doi-asserted-by":"publisher","first-page":"521","DOI":"10.1016\/j.ijpe.2009.01.002","volume":"118","author":"M Leng","year":"2009","unstructured":"Leng M, Parlar M (2009) Lead-time reduction in a two-level supply chain: non-cooperative equilibria versus coordination with a profit-sharing contract. Int J Prod Econ 118(2):521\u2013544","journal-title":"Int J Prod Econ"},{"key":"733_CR20","doi-asserted-by":"publisher","first-page":"707","DOI":"10.1016\/j.apm.2012.02.033","volume":"37","author":"Ch Li","year":"2013","unstructured":"Li Ch, Liu S (2013) A robust optimization approach to reduce the bullwhip effect of supply chains with vendor order placement lead time delays in an uncertain environment. Appl Math Model 37:707\u2013718","journal-title":"Appl Math Model"},{"key":"733_CR21","doi-asserted-by":"publisher","first-page":"2617","DOI":"10.1007\/s11071-014-1613-9","volume":"78","author":"T Li","year":"2014","unstructured":"Li T, Ma J (2014) Complexity analysis of the dual-channel supply chain model with delay decision. Nonlinear Dyn 78:2617\u20132626","journal-title":"Nonlinear Dyn"},{"issue":"3","key":"733_CR22","doi-asserted-by":"publisher","first-page":"858","DOI":"10.1016\/j.cie.2011.05.019","volume":"61","author":"Y Li","year":"2011","unstructured":"Li Y, Xuejun J, Ye F (2011) Supply chain coordination model with controllable lead time and service level constraint. Computers and Industrial Engineering 61(3):858\u2013864","journal-title":"Computers and Industrial Engineering"},{"issue":"1","key":"733_CR23","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1007\/s13727-012-0004-z","volume":"2","author":"S Mahajan","year":"2011","unstructured":"Mahajan S, Venugopal V (2011) Value of information sharing and lead time reduction in a supply chain with auto correlated demand. Technol Oper Manag 2(1):39\u201349","journal-title":"Technol Oper Manag"},{"issue":"1","key":"733_CR24","first-page":"190","volume":"6","author":"Z Michna","year":"2018","unstructured":"Michna Z, Nielsen P, Nielsen L (2018) The impact of stochastic lead times on the bullwhip effect \u2013 a theoretical insight. Prod Manuf Res 6(1):190\u2013200","journal-title":"Prod Manuf Res"},{"issue":"5","key":"733_CR25","doi-asserted-by":"publisher","first-page":"563","DOI":"10.1016\/j.tre.2009.12.004","volume":"46","author":"S Park","year":"2010","unstructured":"Park S, Lee T, Sung CS (2010) A three-level supply chain network design model with risk-pooling and lead times. Transp Res Part E Logist Transp Rev 46(5):563\u2013581","journal-title":"Transp Res Part E Logist Transp Rev"},{"key":"733_CR26","doi-asserted-by":"publisher","first-page":"487","DOI":"10.1016\/j.jprocont.2003.09.005","volume":"14","author":"L Pin-Ho","year":"2004","unstructured":"Pin-Ho L, Shan-Hill D, Shi Shang J (2004) Controller design and reduction of bullwhip for a model supply chain system using z-transform analysis. J Process Control 14:487\u2013499","journal-title":"J Process Control"},{"issue":"2","key":"733_CR27","doi-asserted-by":"publisher","first-page":"8","DOI":"10.1108\/01443579510080382","volume":"15","author":"RG Tersine","year":"1995","unstructured":"Tersine RG, Hummingbird EA (1995) Lead-time reduction: the search for competitive advantage. Int J Oper Prod Manag 15(2):8\u201318","journal-title":"Int J Oper Prod Manag"},{"key":"733_CR28","doi-asserted-by":"publisher","DOI":"10.3390\/e19020064","author":"Lou Wandong","year":"2017","unstructured":"Wandong Lou, Junhai M, Xueli Zh (2017) Bullwhip Entropy Analysis and Chaos Control in the Supply Chain with Sales Game and Consumer Returns. Entropy. https:\/\/doi.org\/10.3390\/e19020064","journal-title":"Entropy"},{"issue":"1","key":"733_CR29","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/S0925-5273(01)00207-9","volume":"77","author":"K Zimmer","year":"2002","unstructured":"Zimmer K (2002) Supply chain coordination with uncertain just-in time delivery. Int J Prod Econ 77(1):1\u201315","journal-title":"Int J Prod Econ"},{"issue":"3","key":"733_CR30","doi-asserted-by":"publisher","first-page":"590","DOI":"10.1016\/j.ejor.2011.07.007","volume":"215","author":"G Zhang","year":"2011","unstructured":"Zhang G, Shang J, Li W (2011) Collaborative production planning of supply chain under price and demand uncertainty. Eur J Oper Res 215(3):590\u2013603","journal-title":"Eur J Oper Res"}],"container-title":["Journal of Combinatorial Optimization"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-021-00733-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10878-021-00733-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-021-00733-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,7,12]],"date-time":"2021-07-12T05:11:12Z","timestamp":1626066672000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10878-021-00733-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,4,21]]},"references-count":30,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2021,7]]}},"alternative-id":["733"],"URL":"https:\/\/doi.org\/10.1007\/s10878-021-00733-1","relation":{},"ISSN":["1382-6905","1573-2886"],"issn-type":[{"value":"1382-6905","type":"print"},{"value":"1573-2886","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,4,21]]},"assertion":[{"value":"5 April 2021","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"21 April 2021","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}