{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T12:58:42Z","timestamp":1769950722120,"version":"3.49.0"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2025,5,1]],"date-time":"2025-05-01T00:00:00Z","timestamp":1746057600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2025,5,1]],"date-time":"2025-05-01T00:00:00Z","timestamp":1746057600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Comb Optim"],"published-print":{"date-parts":[[2025,5]]},"DOI":"10.1007\/s10878-025-01295-2","type":"journal-article","created":{"date-parts":[[2025,5,7]],"date-time":"2025-05-07T17:46:45Z","timestamp":1746640005000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["Scheduling problems with rejection in green manufacturing industry"],"prefix":"10.1007","volume":"49","author":[{"given":"Fanyu","family":"Kong","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jiaxin","family":"Song","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2448-2158","authenticated-orcid":false,"given":"Cuixia","family":"Miao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuzhong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2025,5,7]]},"reference":[{"key":"1295_CR1","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/j.ijpe.2010.09.030","volume":"143","author":"C Artigues","year":"2013","unstructured":"Artigues C, Lopez P, Hait A (2013) The energy scheduling problem: Industrial case-study and constraint propagation techniques. Int J Prod Econ 143:13\u201323","journal-title":"Int J Prod Econ"},{"key":"1295_CR2","doi-asserted-by":"publisher","first-page":"64","DOI":"10.1137\/S0895480196300522","volume":"13","author":"Y Bartal","year":"2000","unstructured":"Bartal Y, Leonardi S, Marchetti-Spaccamela A, Stougie L (2000) Multiprocessor scheduling with rejection. SIAM J Discrete Math 13:64\u201378","journal-title":"SIAM J Discrete Math"},{"key":"1295_CR3","doi-asserted-by":"publisher","first-page":"996","DOI":"10.1111\/itor.12566","volume":"28","author":"LP Cota","year":"2021","unstructured":"Cota LP, Coelho VN, Guimaraes FG, Souza M (2021) Bi-criteria formulation for green scheduling with unrelated parallel-machines with sequence-dependent setup times. Int T Oper Res 28:996\u20131017","journal-title":"Int T Oper Res"},{"key":"1295_CR4","first-page":"1","volume":"34","author":"E Efficiency","year":"2007","unstructured":"Efficiency E (2007) Tracking industrial energy efficiency and CO2 emissions. Int Energy Agency 34:1\u201312","journal-title":"Int Energy Agency"},{"key":"1295_CR5","volume-title":"Computers and intractability: A guide to the theory of NP-completeness","author":"MR Garey","year":"1979","unstructured":"Garey MR, Johnson DS (1979) Computers and intractability: A guide to the theory of NP-completeness. Freeman, San Francisco"},{"key":"1295_CR6","doi-asserted-by":"publisher","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham RL, Lawler EL, Lenstra JK, Kan AR (1979) Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann Discrete Math 5:287\u2013326","journal-title":"Ann Discrete Math"},{"key":"1295_CR7","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/S0167-6377(99)00066-8","volume":"26","author":"MM Guntzer","year":"2000","unstructured":"Guntzer MM, Jungnickel D (2000) Approximate minimization algorithms for the 0\/1 knapsack and subset-sum problem. Oper Res Lett 26:55\u201366","journal-title":"Oper Res Lett"},{"key":"1295_CR8","doi-asserted-by":"crossref","unstructured":"Imreh C, Noga J (1999) Scheduling with machine cost. In: International Workshop on Randomization and Approximation Techniques in Computer Science, Berlin. Springer, Berlin Heidelberg, Heidelberg, pp 168\u2013176","DOI":"10.1007\/978-3-540-48413-4_18"},{"key":"1295_CR9","doi-asserted-by":"publisher","first-page":"108949","DOI":"10.1016\/j.cie.2022.108949","volume":"176","author":"YW Jiang","year":"2023","unstructured":"Jiang YW, Tang X, Li K, Cheng T, Ji M (2023) Approximation algorithms for bi-objective parallel-machine scheduling in green manufacturing. Comput Ind Eng 176:108949","journal-title":"Comput Ind Eng"},{"key":"1295_CR10","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-24777-7","volume-title":"Knapsack Problems","author":"H Kellerer","year":"2004","unstructured":"Kellerer H, Pferschy U, Pisinger D (2004) Knapsack Problems. Springer, Berlin Heidelberg"},{"key":"1295_CR11","doi-asserted-by":"publisher","first-page":"321","DOI":"10.1016\/j.ijpe.2012.05.016","volume":"139","author":"J Leung","year":"2012","unstructured":"Leung J, Lee K, Pinedo ML (2012) Bi-criteria scheduling with machine assignment costs. Int J Prod Econ 139:321\u2013329","journal-title":"Int J Prod Econ"},{"key":"1295_CR12","doi-asserted-by":"publisher","first-page":"98","DOI":"10.1016\/j.jmsy.2015.11.006","volume":"38","author":"K Li","year":"2016","unstructured":"Li K, Zhang X, Leung J, Yang SL (2016) Parallel machine scheduling problems in green manufacturing industry. J Manuf Syst 38:98\u2013106","journal-title":"J Manuf Syst"},{"key":"1295_CR13","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1007\/s10951-012-0303-z","volume":"16","author":"D Shabtay","year":"2013","unstructured":"Shabtay D, Gaspar N, Kaspi M (2013) A survey on offline scheduling with rejection. J Scheduling 16:3\u201328","journal-title":"J Scheduling"},{"key":"1295_CR14","doi-asserted-by":"publisher","first-page":"1205","DOI":"10.1016\/j.jclepro.2016.07.206","volume":"137","author":"SJ Wang","year":"2016","unstructured":"Wang SJ, Liu M, Chu F, Chu CB (2016) Bi-objective optimization of a single-machine batch scheduling problem with energy cost consideration. J Clean Prod 137:1205\u20131215","journal-title":"J Clean Prod"},{"key":"1295_CR15","doi-asserted-by":"publisher","first-page":"585","DOI":"10.1109\/TEM.2011.2171055","volume":"59","author":"MB Yildirim","year":"2011","unstructured":"Yildirim MB, Mouzon G (2011) Single-machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm. IEEE T Eng Manage 59:585\u2013597","journal-title":"IEEE T Eng Manage"},{"key":"1295_CR16","doi-asserted-by":"publisher","first-page":"975","DOI":"10.1016\/j.ejor.2008.10.006","volume":"198","author":"LQ Zhang","year":"2009","unstructured":"Zhang LQ, Lu LF, Yuan JJ (2009) Single-machine scheduling with release dates and rejection. Eur J Oper Res 198:975\u2013978","journal-title":"Eur J Oper Res"},{"key":"1295_CR17","doi-asserted-by":"publisher","first-page":"1877","DOI":"10.1016\/j.tcs.2010.02.006","volume":"411","author":"LQ Zhang","year":"2010","unstructured":"Zhang LQ, Lu LF, Yuan JJ (2010) Single-machine scheduling under the job rejection constraint. Theor Comput Sci 411:1877\u20131882","journal-title":"Theor Comput Sci"}],"container-title":["Journal of Combinatorial Optimization"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-025-01295-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s10878-025-01295-2\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s10878-025-01295-2.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,23]],"date-time":"2025-05-23T15:34:38Z","timestamp":1748014478000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s10878-025-01295-2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,5]]},"references-count":17,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2025,5]]}},"alternative-id":["1295"],"URL":"https:\/\/doi.org\/10.1007\/s10878-025-01295-2","relation":{},"ISSN":["1382-6905","1573-2886"],"issn-type":[{"value":"1382-6905","type":"print"},{"value":"1573-2886","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,5]]},"assertion":[{"value":"28 March 2025","order":1,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"7 May 2025","order":2,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declartions"}},{"value":"The authors have no relevant financial or non-financial interests to disclose.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Conflict of interest"}}],"article-number":"63"}}