{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,14]],"date-time":"2026-02-14T07:03:57Z","timestamp":1771052637645,"version":"3.50.1"},"reference-count":28,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2014,4,18]],"date-time":"2014-04-18T00:00:00Z","timestamp":1397779200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1007\/s10898-014-0185-z","type":"journal-article","created":{"date-parts":[[2014,4,17]],"date-time":"2014-04-17T12:46:44Z","timestamp":1397738804000},"page":"555-582","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":49,"title":["A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines"],"prefix":"10.1007","volume":"63","author":[{"given":"Amina","family":"Lamghari","sequence":"first","affiliation":[]},{"given":"Roussos","family":"Dimitrakopoulos","sequence":"additional","affiliation":[]},{"given":"Jacques A.","family":"Ferland","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2014,4,18]]},"reference":[{"key":"185_CR1","unstructured":"Amaya, J., Espinoza, D., Goycoolea, M., Moreno, E., Prevost, T., Rubio, E.: A scalable approach to optimal block scheduling. In: Proceedings of APCOM, pp. 567\u2013575 (2009)"},{"key":"185_CR2","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1057\/jors.2012.26","volume":"64","author":"MWA Asad","year":"2013","unstructured":"Asad, M.W.A., Dimitrakopoulos, R.: Implementing a parametric maximum flow algorithm for optimum open pit mine design under uncertain supply and demand. J. Oper. Res. Soc. 64, 185\u2013197 (2013)","journal-title":"J. Oper. Res. Soc."},{"key":"185_CR3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/978-3-642-13036-6_1","volume":"6080","author":"D Bienstock","year":"2010","unstructured":"Bienstock, D., Zuckerberg, M.: Solving LP relaxations of large-scale precedence constrained problems. Lect. Notes Comput. Sci. 6080, 1\u201314 (2010)","journal-title":"Lect. Notes Comput. Sci."},{"key":"185_CR4","doi-asserted-by":"crossref","first-page":"1641","DOI":"10.1016\/j.cor.2009.12.008","volume":"37","author":"A Bley","year":"2010","unstructured":"Bley, A., Boland, N., Fricke, C., Froyland, G.: A strengthened formulation and cutting planes for the open pit mine production scheduling problem. Comput. Oper. Res. 37, 1641\u20131647 (2010)","journal-title":"Comput. Oper. Res."},{"key":"185_CR5","doi-asserted-by":"crossref","first-page":"1064","DOI":"10.1016\/j.cor.2007.12.006","volume":"36","author":"N Boland","year":"2009","unstructured":"Boland, N., Dumitrescu, I., Froyland, G., Gleixner, A.M.: LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Comput. Oper. Res. 36, 1064\u20131089 (2009)","journal-title":"Comput. Oper. Res."},{"key":"185_CR6","unstructured":"Boland, N., Dumitrescu, I., Froyland, G.: A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology, Optimization Online. http:\/\/www.optimization-online.org\/DB_FILE\/2008\/10\/2123.pdf . Accessed 21 Oct 2013 (2008)"},{"key":"185_CR7","doi-asserted-by":"crossref","first-page":"642","DOI":"10.1016\/j.ejor.2012.05.029","volume":"212","author":"A Lamghari","year":"2012","unstructured":"Lamghari, A., Dimitrakopoulos, R.: A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. Eur. J. Oper. Res. 212, 642\u2013652 (2012)","journal-title":"Eur. J. Oper. Res."},{"key":"185_CR8","doi-asserted-by":"crossref","first-page":"444","DOI":"10.1287\/opre.48.3.444.12431","volume":"48","author":"J Brimberg","year":"2000","unstructured":"Brimberg, J., Hansen, P., Mladenovic, N., Taillard, E.: Improvements and comparison of heuristics for solving the multisource Weber problem. Oper. Res. 48, 444\u2013460 (2000)","journal-title":"Oper. Res."},{"key":"185_CR9","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1023\/A:1024835022186","volume":"27","author":"L Caccetta","year":"2003","unstructured":"Caccetta, L., Hill, S.P.: An application of branch and cut to open pit mine scheduling. J. Glob. Optim. 27, 349\u2013365 (2003)","journal-title":"J. Glob. Optim."},{"key":"185_CR10","unstructured":"Chatterjee, S., Lamghari, A., Dimitrakopoulos, R.: A two-phase heuristic method for constrained pushback design. In: Castro, R., Emery, X., Kuyvenhoven, R. (eds.) Proceedings of MININ 2010, Conference on Mining Innovation. Santiago, Chile, pp. 195\u2013204 (2010)"},{"key":"185_CR11","doi-asserted-by":"crossref","first-page":"517","DOI":"10.1287\/opre.1120.1050","volume":"60","author":"R Chicoisne","year":"2012","unstructured":"Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., Rubio, E.: A new algorithm for the open-pit mine production scheduling problem. Oper. Res. 60, 517\u2013528 (2012)","journal-title":"Oper. Res."},{"key":"185_CR12","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1007\/s11590-011-0306-2","volume":"5","author":"C Cullenbine","year":"2011","unstructured":"Cullenbine, C., Wood, R., Newman, A.: A sliding time window heuristic for open pit mine block sequencing. Optim. Lett. 5, 365\u2013377 (2011)","journal-title":"Optim. Lett."},{"key":"185_CR13","unstructured":"Dagdelen, K., Johnson, T.B.: Optimum open pit mine production scheduling by lagrangian parameterization. In: Proceedings of 19th International APCOM Symposium, pp. 127\u2013142. Littleton, CO (1986)"},{"key":"185_CR14","first-page":"A21","volume":"103","author":"B Denby","year":"1994","unstructured":"Denby, B., Schofield, D.: Open-pit design and scheduling by use of genetic algorithms. Trans. Inst. Min. Metall. 103, A21\u2013A26 (1994)","journal-title":"Trans. Inst. Min. Metall."},{"key":"185_CR15","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1007\/s10479-012-1258-3","volume":"206","author":"D Espinoza","year":"2013","unstructured":"Espinoza, D., Goycoolea, M., Moreno, E., Newman, A.: MineLib: a library of open pit mining problems. Ann. Oper. Res. 206, 93\u2013114 (2013)","journal-title":"Ann. Oper. Res."},{"key":"185_CR16","volume-title":"Autonomous Robots and Agents","author":"JA Ferland","year":"2007","unstructured":"Ferland, J.A., Amaya, J., Djuimo, M.S.: Application of a particle swarm algorithm to the capacitated open pit mining problem. In: Mukhopadhyay, S., Sen Gupta, G. (eds.) Autonomous Robots and Agents. Springer, Berlin (2007)"},{"key":"185_CR17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/BF01553529","volume":"5","author":"M Gershon","year":"1987","unstructured":"Gershon, M.: Heuristic approaches for mine planning and production scheduling. Int. J. Min. Geol. Eng. 5, 1\u201313 (1987)","journal-title":"Int. J. Min. Geol. Eng."},{"key":"185_CR18","doi-asserted-by":"crossref","first-page":"449","DOI":"10.1016\/S0377-2217(00)00100-4","volume":"130","author":"P Hansen","year":"2001","unstructured":"Hansen, P., Mladenovic, N.: Variable neighborhood search: principles and applications. Eur. J. Oper. Res. 130, 449\u2013467 (2001)","journal-title":"Eur. J. Oper. Res."},{"key":"185_CR19","doi-asserted-by":"crossref","first-page":"992","DOI":"10.1287\/opre.1080.0524","volume":"56","author":"DC Hochbaum","year":"2008","unstructured":"Hochbaum, D.C.: The pseudoflow algorithm: a new algorithm for the maximum-flow problem. Oper. Res. 56, 992\u20131009 (2008)","journal-title":"Oper. Res."},{"key":"185_CR20","unstructured":"IBM: IBM ILOG AMPL version 12.2 users guide: standard (command-line) version including CPLEX directives (2010)"},{"key":"185_CR21","unstructured":"Johnson, T.: Optimum production scheduling. In: Proceedings of the 8th international symposium on computers and operations research, pp. 539\u2013562. Salt Lake City (1969)"},{"key":"185_CR22","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1016\/j.endm.2010.05.052","volume":"36","author":"E Moreno","year":"2010","unstructured":"Moreno, E., Espinoza, D., Goycoolea, M.: Large-scale multi-period precedence constrained knapsack problem: a mining application. Electron. Notes Discret. Math. 36, 407\u2013414 (2010)","journal-title":"Electron. Notes Discret. Math."},{"key":"185_CR23","doi-asserted-by":"crossref","first-page":"222","DOI":"10.1287\/inte.1090.0492","volume":"40","author":"AM Newman","year":"2010","unstructured":"Newman, A.M., Rubio, E., Caro, R., Weintraub, A., Eurek, K.: A review of operations research in mine planning. Interfaces 40, 222\u2013245 (2010)","journal-title":"Interfaces"},{"key":"185_CR24","doi-asserted-by":"crossref","first-page":"1153","DOI":"10.1016\/j.ejor.2005.12.035","volume":"177","author":"S Ramazan","year":"2007","unstructured":"Ramazan, S.: The new fundamental tree algorithm for production scheduling of open pit mines. Eur. J. Oper. Res. 177, 1153\u20131166 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"185_CR25","first-page":"73","volume":"316","author":"S Ramazan","year":"2004","unstructured":"Ramazan, S., Dimitrakopoulos, R.: Recent applications of operations research in open pit mining. Trans. Soc. Min. Metall. Explor. 316, 73\u201378 (2004)","journal-title":"Trans. Soc. Min. Metall. Explor."},{"key":"185_CR26","first-page":"1","volume":"36","author":"H Sevim","year":"1998","unstructured":"Sevim, H., Lei, D.: The problem of production planning in open pit mines. INFOR 36, 1\u201312 (1998)","journal-title":"INFOR"},{"key":"185_CR27","first-page":"247","volume":"7","author":"B Tolwinski","year":"1996","unstructured":"Tolwinski, B., Underwood, R.: A scheduling algorithm for open pit mines. IMA J. Math. Appl. Bus. Ind. 7, 247\u2013270 (1996)","journal-title":"IMA J. Math. Appl. Bus. Ind."},{"key":"185_CR28","volume-title":"Four-X User Manual","author":"J Whittle","year":"1998","unstructured":"Whittle, J.: Four-X User Manual. Whittle Programming Pty Ltd., Melbourne (1998)"}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-014-0185-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10898-014-0185-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-014-0185-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,3,26]],"date-time":"2019-03-26T23:13:52Z","timestamp":1553642032000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10898-014-0185-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,4,18]]},"references-count":28,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2015,11]]}},"alternative-id":["185"],"URL":"https:\/\/doi.org\/10.1007\/s10898-014-0185-z","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,4,18]]}}}