{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,17]],"date-time":"2026-06-17T03:02:38Z","timestamp":1781665358151,"version":"3.54.5"},"reference-count":16,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2015,4,8]],"date-time":"2015-04-08T00:00:00Z","timestamp":1428451200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[2016,10]]},"DOI":"10.1007\/s10898-015-0298-z","type":"journal-article","created":{"date-parts":[[2015,4,7]],"date-time":"2015-04-07T12:43:14Z","timestamp":1428410594000},"page":"263-290","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":26,"title":["Two-stage, single-lot, lot streaming problem for a $$1+2$$ 1 + 2 hybrid flow shop"],"prefix":"10.1007","volume":"66","author":[{"given":"Ming","family":"Cheng","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Subhash C.","family":"Sarin","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Sanchit","family":"Singh","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2015,4,8]]},"reference":[{"issue":"3","key":"298_CR1","doi-asserted-by":"crossref","first-page":"736","DOI":"10.1016\/j.cor.2011.05.020","volume":"39","author":"S Carpov","year":"2012","unstructured":"Carpov, S., Carlier, J., Nace, D., Sirdey, R.: Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage. Comput. Oper. Res. 39(3), 736\u2013745 (2012)","journal-title":"Comput. Oper. Res."},{"key":"298_CR2","volume-title":"Fundamental Methods of Mathematical Economics","author":"AC Chiang","year":"1984","unstructured":"Chiang, A.C.: Fundamental Methods of Mathematical Economics, 3rd edn. McGraw-Hill, New York (1984)","edition":"3"},{"issue":"10","key":"298_CR3","first-page":"813","volume":"29","author":"R DeVor","year":"1997","unstructured":"DeVor, R., Graves, R., Mills, J.J.: Agile manufacturing research: accomplishments and opportunities. IIE Trans. 29(10), 813\u2013823 (1997)","journal-title":"IIE Trans."},{"issue":"4","key":"298_CR4","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1057\/jors.1988.63","volume":"39","author":"JN Gupta","year":"1988","unstructured":"Gupta, J.N.: Two-stage, hybrid flowshop scheduling problem. J. Oper. Res. Soc. 39(4), 359\u2013364 (1988)","journal-title":"J. Oper. Res. Soc."},{"issue":"7","key":"298_CR5","doi-asserted-by":"crossref","first-page":"1489","DOI":"10.1080\/00207549108948025","volume":"29","author":"JN Gupta","year":"1991","unstructured":"Gupta, J.N., Tunc, E.A.: Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. Int. J. Prod. Res. 29(7), 1489 (1991)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"298_CR6","doi-asserted-by":"crossref","first-page":"415","DOI":"10.1016\/0377-2217(94)90407-3","volume":"77","author":"JN Gupta","year":"1994","unstructured":"Gupta, J.N., Tunc, E.A.: Scheduling a two-stage hybrid flowshop with separable setup and removal times. Eur. J. Oper. Res. 77(3), 415\u2013428 (1994)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"298_CR7","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1016\/S0377-2217(96)90070-3","volume":"89","author":"JA Hoogeveen","year":"1996","unstructured":"Hoogeveen, J.A., Lenstra, J.K., Veltman, B.: Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard. Eur. J. Oper. Res. 89(1), 172\u2013175 (1996)","journal-title":"Eur. J. Oper. Res."},{"issue":"4","key":"298_CR8","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1109\/70.88060","volume":"5","author":"A Kusiak","year":"1989","unstructured":"Kusiak, A.: Aggregate scheduling of a flexible machining and assembly system. IEEE Trans. Robot. Autom. 5(4), 451\u2013459 (1989)","journal-title":"IEEE Trans. Robot. Autom."},{"issue":"1\u20132","key":"298_CR9","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/S0360-8352(99)00023-6","volume":"37","author":"R Linn","year":"1999","unstructured":"Linn, R., Zhang, W.: Hybrid flow shop scheduling: A survey. Comput. Ind. Eng. 37(1\u20132), 57\u201361 (1999)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"298_CR10","doi-asserted-by":"crossref","first-page":"1171","DOI":"10.1016\/j.ejor.2006.06.066","volume":"187","author":"J Liu","year":"2008","unstructured":"Liu, J.: Single-job lot streaming in m+1 two-stage hybrid flowshops. Eur. J. Oper. Res. 187(3), 1171\u20131183 (2008)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"298_CR11","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2009.09.024","volume":"205","author":"R Ruiz","year":"2010","unstructured":"Ruiz, R., Vazquez-Rodriguez, J.A.: The hybrid flow shop scheduling problem. Eur. J. Oper. Res. 205(1), 1\u201318 (2010)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"298_CR12","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1016\/0377-2217(89)90208-7","volume":"43","author":"C Sriskandarajah","year":"1989","unstructured":"Sriskandarajah, C., Sethi, S.P.: Scheduling algorithms for flexible flowshops: worst and average case performance. Eur. J. Oper. Res. 43(2), 143\u2013160 (1989)","journal-title":"Eur. J. Oper. Res."},{"issue":"11","key":"298_CR13","doi-asserted-by":"crossref","first-page":"3037","DOI":"10.1080\/00207549608905076","volume":"34","author":"H Tsubone","year":"1996","unstructured":"Tsubone, H., Ohba, M., Uetake, T.: The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop. Int. J. Prod. Res. 34(11), 3037\u20133053 (1996)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"298_CR14","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1287\/opre.36.3.445","volume":"36","author":"RJ Wittrock","year":"1988","unstructured":"Wittrock, R.J.: An adaptable scheduling algorithm for flexible flow lines. Oper. Res. 36(3), 445\u2013453 (1988)","journal-title":"Oper. Res."},{"key":"298_CR15","first-page":"49","volume":"9","author":"W Zhang","year":"2003","unstructured":"Zhang, W., Liu, J., Linn, R.J.: Model and heuristics for lot streaming of one job in m-1 hybrid flowshops. Int. J. Oper. Quant. Manag. 9, 49\u201364 (2003)","journal-title":"Int. J. Oper. Quant. Manag."},{"issue":"2","key":"298_CR16","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1016\/j.ijpe.2004.04.005","volume":"96","author":"W Zhang","year":"2005","unstructured":"Zhang, W., Yin, C., Liu, J., Linn, R.J.: Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops. Int. J. Prod. Econ. 96(2), 189\u2013200 (2005)","journal-title":"Int. J. Prod. Econ."}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-015-0298-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10898-015-0298-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-015-0298-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-015-0298-z","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T04:59:09Z","timestamp":1559278749000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10898-015-0298-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,4,8]]},"references-count":16,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2016,10]]}},"alternative-id":["298"],"URL":"https:\/\/doi.org\/10.1007\/s10898-015-0298-z","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,4,8]]}}}