{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,8]],"date-time":"2026-03-08T17:11:23Z","timestamp":1772989883665,"version":"3.50.1"},"reference-count":26,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2017,2,21]],"date-time":"2017-02-21T00:00:00Z","timestamp":1487635200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[2017,8]]},"DOI":"10.1007\/s10898-017-0500-6","type":"journal-article","created":{"date-parts":[[2017,2,21]],"date-time":"2017-02-21T13:45:15Z","timestamp":1487684715000},"page":"851-878","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":30,"title":["A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning"],"prefix":"10.1007","volume":"68","author":[{"given":"Chang","family":"Fang","sequence":"first","affiliation":[]},{"given":"Xinbao","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Panos M.","family":"Pardalos","sequence":"additional","affiliation":[]},{"given":"Jianyu","family":"Long","sequence":"additional","affiliation":[]},{"given":"Jun","family":"Pei","sequence":"additional","affiliation":[]},{"given":"Chao","family":"Zuo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,2,21]]},"reference":[{"issue":"8","key":"500_CR1","doi-asserted-by":"crossref","first-page":"2373","DOI":"10.1080\/00207541003692021","volume":"49","author":"E Akcali","year":"2011","unstructured":"Akcali, E., Cetinkaya, S.: Quantitative models for inventory and production planning in closed-loop supply chains. Int. J. Prod. Res. 49(8), 2373\u20132407 (2011)","journal-title":"Int. J. Prod. Res."},{"key":"500_CR2","volume-title":"Constrained Optimization and Lagrangian Multiplier Methods","author":"DP Bertsekas","year":"1982","unstructured":"Bertsekas, D.P.: Constrained Optimization and Lagrangian Multiplier Methods. Academic Press, New York (1982)"},{"issue":"5\u20138","key":"500_CR3","doi-asserted-by":"crossref","first-page":"1187","DOI":"10.1007\/s00170-013-5538-0","volume":"71","author":"M Chen","year":"2014","unstructured":"Chen, M., Abrishami, P.: A mathematical model for production planning in hybrid manufacturing\u2013remanufacturing systems. Int. J. Adv. Manuf. Technol. 71(5\u20138), 1187\u20131196 (2014)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"7","key":"500_CR4","doi-asserted-by":"crossref","first-page":"781","DOI":"10.1016\/S0305-0548(00)00076-9","volume":"29","author":"ZL Chen","year":"2002","unstructured":"Chen, Z.L., Li, S.L., Tirupati, D.: A scenario-based stochastic programming approach for technology and capacity planning. Comput. Oper. Res. 29(7), 781\u2013806 (2002)","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"500_CR5","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(97)00230-0","volume":"103","author":"M Fleischmann","year":"1997","unstructured":"Fleischmann, M., BloemhofRuwaard, J.M., Dekker, R., et al.: Quantitative models for reverse logistics: a review. Eur. J. Oper. Res. 103(1), 1\u201317 (1997)","journal-title":"Eur. J. Oper. Res."},{"issue":"10","key":"500_CR6","doi-asserted-by":"crossref","first-page":"1447","DOI":"10.1057\/jors.2012.106","volume":"64","author":"SH Han","year":"2013","unstructured":"Han, S.H., Dong, M.Y., Lu, S.X., et al.: Production planning for hybrid remanufacturing and manufacturing system with component recovery. J. Oper. Res. Soc. 64(10), 1447\u20131460 (2013)","journal-title":"J. Oper. Res. Soc."},{"issue":"2","key":"500_CR7","doi-asserted-by":"crossref","first-page":"486","DOI":"10.1016\/j.ijpe.2008.09.015","volume":"118","author":"CI Hsu","year":"2009","unstructured":"Hsu, C.I., Li, H.C.: An integrated plant capacity and production planning model for high-tech manufacturing firms with economies of scale. Int. J. Prod. Econ. 118(2), 486\u2013500 (2009)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"500_CR8","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1080\/00207543.2013.838330","volume":"52","author":"O Kaya","year":"2014","unstructured":"Kaya, O., Bagci, F., Turkay, M.: Planning of capacity, production and inventory decisions in a generic reverse supply chain under uncertain demand and returns. Int. J. Prod. Res. 52(1), 270\u2013282 (2014)","journal-title":"Int. J. Prod. Res."},{"issue":"1","key":"500_CR9","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/j.ijpe.2010.10.026","volume":"135","author":"JP Kenne","year":"2012","unstructured":"Kenne, J.P., Dejax, P., Gharbi, A.: Production planning of a hybrid manufacturing\u2013remanufacturing system under uncertainty within a closed-loop supply chain. Int. J. Prod. Econ. 135(1), 81\u201393 (2012)","journal-title":"Int. J. Prod. Econ."},{"issue":"6","key":"500_CR10","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1080\/09537287.2011.561815","volume":"23","author":"M Lage","year":"2012","unstructured":"Lage, M., Godinho, M.: Production planning and control for remanufacturing: literature review and analysis. Prod. Plan. Control 23(6), 419\u2013435 (2012)","journal-title":"Prod. Plan. Control"},{"issue":"13","key":"500_CR11","doi-asserted-by":"crossref","first-page":"3657","DOI":"10.1080\/00207540701837029","volume":"47","author":"CB Li","year":"2009","unstructured":"Li, C.B., Liu, F., Cao, H.J., Wang, Q.L.: A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system. Int. J. Prod. Res. 47(13), 3657\u20133668 (2009)","journal-title":"Int. J. Prod. Res."},{"issue":"2","key":"500_CR12","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1016\/j.ijpe.2008.11.005","volume":"117","author":"J Li","year":"2009","unstructured":"Li, J., Gonzales, M., Zhu, Y.: A hybrid simulation optimization method for production planning of dedicated remanufacturing. Int. J. Prod. Econ. 117(2), 286\u2013301 (2009)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"500_CR13","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1016\/j.ijpe.2004.11.017","volume":"105","author":"YJ Li","year":"2007","unstructured":"Li, Y.J., Chen, J., Cai, X.Q.: Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing. Int. J. Prod. Econ. 105(2), 301\u2013317 (2007)","journal-title":"Int. J. Prod. Econ."},{"issue":"2","key":"500_CR14","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1016\/j.omega.2012.03.007","volume":"41","author":"SS Liu","year":"2013","unstructured":"Liu, S.S., Papageorgiou, L.G.: Multiobjective optimisation of production, distribution and capacity planning of global supply chains in the process industry. Omega 41(2), 369\u2013382 (2013)","journal-title":"Omega"},{"issue":"6","key":"500_CR15","doi-asserted-by":"crossref","first-page":"1568","DOI":"10.1080\/00207543.2011.558128","volume":"50","author":"A Lusa","year":"2012","unstructured":"Lusa, A., Matinez-costa, C., Mas-Machura, M.: An integral planning model that includes production, selling price, cash flow management and flexible capacity. Int. J. Prod. Res. 50(6), 1568\u20131581 (2012)","journal-title":"Int. J. Prod. Res."},{"issue":"4","key":"500_CR16","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1002\/nav.20219","volume":"54","author":"Y Merzifonluoglu","year":"2007","unstructured":"Merzifonluoglu, Y., Geunes, J., Romeijn, H.E.: Integrated capacity, demand, and production planning with subcontracting and overtime options. Nav. Res. Logist. 54(4), 433\u2013447 (2007)","journal-title":"Nav. Res. Logist."},{"issue":"4","key":"500_CR17","doi-asserted-by":"crossref","first-page":"717","DOI":"10.1007\/s10845-011-0619-0","volume":"24","author":"MA Naeem","year":"2013","unstructured":"Naeem, M.A., Dias, D.J., Tibrewal, R., et al.: Production planning optimization for manufacturing and remanufacturing system in stochastic environment. J. Intell. Manuf. 24(4), 717\u2013728 (2013)","journal-title":"J. Intell. Manuf."},{"issue":"3","key":"500_CR18","doi-asserted-by":"crossref","first-page":"810","DOI":"10.1016\/j.ejor.2008.10.018","volume":"198","author":"ZD Pan","year":"2009","unstructured":"Pan, Z.D., Tang, J.F., Liu, O.: Capacitated dynamic lot sizing problems in closed-loop supply chain. Eur. J. Oper. Res. 198(3), 810\u2013821 (2009)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"500_CR19","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1287\/moor.1.2.97","volume":"1","author":"RT Rockafellar","year":"1976","unstructured":"Rockafellar, R.T.: Augmented Lagrangians and application of the proximal point algorithm in convex programming. Math. Oper. Res. 1(2), 97\u2013116 (1976)","journal-title":"Math. Oper. Res."},{"issue":"1","key":"500_CR20","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1287\/moor.16.1.119","volume":"16","author":"RT Rockafellar","year":"1991","unstructured":"Rockafellar, R.T., Wets, R.J.B.: Scenarios and policy aggregation in optimization under uncertainty. Math. Oper. Res. 16(1), 119\u2013147 (1991)","journal-title":"Math. Oper. Res."},{"issue":"3","key":"500_CR21","doi-asserted-by":"crossref","first-page":"641","DOI":"10.1016\/j.cor.2010.08.008","volume":"38","author":"JM Shi","year":"2011","unstructured":"Shi, J.M., Zhang, G.Q., Sha, J.C.: Optimal production planning for a multi-product closed loop system with uncertain demand and return. Comput. Oper. Res. 38(3), 641\u2013650 (2011)","journal-title":"Comput. Oper. Res."},{"issue":"9","key":"500_CR22","doi-asserted-by":"crossref","first-page":"1977","DOI":"10.1016\/j.cor.2011.09.007","volume":"39","author":"LX Tang","year":"2012","unstructured":"Tang, L.X., Che, P., Liu, J.Y.: A stochastic production planning problem with nonlinear cost. Comput. Oper. Res. 39(9), 1977\u20131987 (2012)","journal-title":"Comput. Oper. Res."},{"issue":"5","key":"500_CR23","doi-asserted-by":"crossref","first-page":"738","DOI":"10.1287\/mnsc.42.5.738","volume":"42","author":"H Tempelmeier","year":"1996","unstructured":"Tempelmeier, H., Derstroff, M.: A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times. Manage. Sci. 42(5), 738\u2013757 (1996)","journal-title":"Manage. Sci."},{"issue":"2","key":"500_CR24","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1016\/S0377-2217(97)00108-2","volume":"102","author":"E vanderLaan","year":"1997","unstructured":"vanderLaan, E., Salomon, M.: Production planning and inventory control with remanufacturing and disposal. Eur. J. Oper. Res. 102(2), 264\u2013278 (1997)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"500_CR25","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1057\/jors.2012.28","volume":"64","author":"MK Zanjani","year":"2013","unstructured":"Zanjani, M.K., Nourelfath, M., Ait-Kadi, D.: A scenario decomposition approach for stochastic production planning in sawmills. J. Oper. Res. Soc. 64(1), 48\u201359 (2013)","journal-title":"J. Oper. Res. Soc."},{"issue":"5\u20138","key":"500_CR26","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1007\/s00170-010-2948-0","volume":"54","author":"J Zhang","year":"2011","unstructured":"Zhang, J., Liu, X., Tu, Y.L.: A capacitated production planning problem for closed-loop supply chain with remanufacturing. Int. J. Adv. Manuf. Technol. 54(5\u20138), 757\u2013766 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10898-017-0500-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-017-0500-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-017-0500-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,7,13]],"date-time":"2017-07-13T11:30:11Z","timestamp":1499945411000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10898-017-0500-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,2,21]]},"references-count":26,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2017,8]]}},"alternative-id":["500"],"URL":"https:\/\/doi.org\/10.1007\/s10898-017-0500-6","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,2,21]]}}}