{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,23]],"date-time":"2026-02-23T20:12:34Z","timestamp":1771877554073,"version":"3.50.1"},"reference-count":25,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,6,1]],"date-time":"2017-06-01T00:00:00Z","timestamp":1496275200000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71501058"],"award-info":[{"award-number":["71501058"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71601065"],"award-info":[{"award-number":["71601065"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[2018,5]]},"DOI":"10.1007\/s10898-017-0536-7","type":"journal-article","created":{"date-parts":[[2017,6,1]],"date-time":"2017-06-01T01:17:23Z","timestamp":1496279843000},"page":"147-163","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":36,"title":["Serial-batching group scheduling with release times and the combined effects of deterioration and truncated job-dependent learning"],"prefix":"10.1007","volume":"71","author":[{"given":"Wenjuan","family":"Fan","sequence":"first","affiliation":[]},{"given":"Jun","family":"Pei","sequence":"additional","affiliation":[]},{"given":"Xinbao","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Panos M.","family":"Pardalos","sequence":"additional","affiliation":[]},{"given":"Min","family":"Kong","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,6,1]]},"reference":[{"issue":"11\u201312","key":"536_CR1","doi-asserted-by":"crossref","first-page":"1221","DOI":"10.1007\/s00170-008-1512-7","volume":"41","author":"JB Wang","year":"2009","unstructured":"Wang, J.B., Jiang, Y., Wang, G.: Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning. Int. J. Adv. Manuf. Technol. 41(11\u201312), 1221\u20131226 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"536_CR2","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1007\/s00170-008-1667-2","volume":"43","author":"JB Wang","year":"2009","unstructured":"Wang, J.B., Gao, W.J., Wang, L.Y., Wang, D.: Single machine group scheduling with general linear deterioration to minimize the makespan. Int. J. Adv. Manuf. Technol. 43, 146\u2013150 (2009)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"2","key":"536_CR3","doi-asserted-by":"crossref","first-page":"326","DOI":"10.1016\/j.cie.2009.11.008","volume":"58","author":"TCE Cheng","year":"2010","unstructured":"Cheng, T.C.E., Lee, W.-C., Wu, C.-C.: Scheduling problems with deteriorating jobs and learning effects including proportional setup times. Comput. Ind. Eng. 58(2), 326\u2013331 (2010)","journal-title":"Comput. Ind. Eng."},{"key":"536_CR4","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1007\/s10479-012-1111-8","volume":"196","author":"W-H Kuo","year":"2012","unstructured":"Kuo, W.-H.: Single-machine group scheduling with time-dependent learning effect and position-based setup time learning effect. Ann. Oper. Res. 196, 349\u2013359 (2012)","journal-title":"Ann. Oper. Res."},{"key":"536_CR5","doi-asserted-by":"crossref","first-page":"643","DOI":"10.1007\/s00170-011-3639-1","volume":"60","author":"JB Wang","year":"2012","unstructured":"Wang, J.B., Huang, X., Wu, Y.B., Ji, P.: Group scheduling with independent setup times, ready times, and deteriorating job processing times. Int. J. Adv. Manuf. Technol. 60, 643\u2013649 (2012)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"536_CR6","doi-asserted-by":"crossref","first-page":"2995","DOI":"10.1016\/j.apm.2012.07.029","volume":"37","author":"S-J Yang","year":"2013","unstructured":"Yang, S.-J.: Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time. Appl. Math. Model. 37, 2995\u20133005 (2013)","journal-title":"Appl. Math. Model."},{"key":"536_CR7","doi-asserted-by":"crossref","first-page":"4593","DOI":"10.1016\/j.apm.2014.12.041","volume":"39","author":"S-W Yang","year":"2015","unstructured":"Yang, S.-W., Wan, L., Yin, N.: Research on single machine SLK\/DIF due window assignment problem with learning effect and deteriorating jobs. Appl. Math. Model. 39, 4593\u20134598 (2015)","journal-title":"Appl. Math. Model."},{"key":"536_CR8","doi-asserted-by":"crossref","first-page":"5001","DOI":"10.1016\/j.apm.2011.12.038","volume":"36","author":"C-C Wu","year":"2012","unstructured":"Wu, C.-C., Wu, W.-H., Hsu, P.-H., Lai, K.: A two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning function. Appl. Math. Model. 36, 5001\u20135014 (2012)","journal-title":"Appl. Math. Model."},{"key":"536_CR9","doi-asserted-by":"publisher","DOI":"10.1007\/s10878-015-9984-5","author":"H He","year":"2015","unstructured":"He, H., Liu, M., Wang, J.B.: Resource constrained scheduling with general truncated job-dependent learning effect. J. Comb. Optim. (2015). doi:\n                        10.1007\/s10878-015-9984-5","journal-title":"J. Comb. Optim."},{"key":"536_CR10","doi-asserted-by":"crossref","first-page":"937","DOI":"10.1007\/s00521-015-1910-3","volume":"27","author":"Y-B Wu","year":"2016","unstructured":"Wu, Y.-B., Wang, J.-J.: Single-machine scheduling with truncated sum-of-processing-times-based learning effect including proportional delivery times. Neural. Comput. Appl. 27, 937\u2013943 (2016)","journal-title":"Neural. Comput. Appl."},{"key":"536_CR11","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1007\/s12190-014-0777-2","volume":"47","author":"Y-P Niu","year":"2015","unstructured":"Niu, Y.-P., Wang, J., Yin, N.: Scheduling problems with effects of deterioration and truncated job-dependent learning. J. Appl. Math. Comput. 47, 315\u2013325 (2015)","journal-title":"J. Appl. Math. Comput."},{"key":"536_CR12","doi-asserted-by":"crossref","first-page":"1857","DOI":"10.1007\/s11590-011-0433-9","volume":"7","author":"JB Wang","year":"2013","unstructured":"Wang, J.B., Wang, X.-Y., Sun, L.-H., Sun, L.-Y.: Scheduling jobs with truncated exponential learning functions. Optim. Lett. 7, 1857\u20131873 (2013)","journal-title":"Optim. Lett."},{"key":"536_CR13","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1057\/jors.2012.46","volume":"64","author":"C-C Wu","year":"2013","unstructured":"Wu, C.-C., Yin, Y., Cheng, S.-R.: Single-machine and two-machine flowshop scheduling problems with truncated position-based learning functions. J. Oper. Res. Soc. 64, 147\u2013156 (2013)","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"536_CR14","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1007\/s10898-015-0320-5","volume":"67","author":"J Pei","year":"2017","unstructured":"Pei, J., Liu, X., Pardalos, P.M., Migdalas, A., Yang, S.: Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine. J. Glob. Optim. 67(1), 251\u2013262 (2017)","journal-title":"J. Glob. Optim."},{"issue":"1","key":"536_CR15","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ejor.2014.11.034","volume":"244","author":"J Pei","year":"2015","unstructured":"Pei, J., Pardalos, P.M., Liu, X., Fan, W., Yang, S.: Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan. Eur. J. Oper. Res. 244(1), 13\u201325 (2015)","journal-title":"Eur. J. Oper. Res."},{"key":"536_CR16","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1007\/s10479-015-1824-6","volume":"249","author":"J Pei","year":"2017","unstructured":"Pei, J., Liu, X., Pardalos, P.M., Fan, W., Yang, S.: Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times. Ann. Oper. Res. 249, 175\u2013195 (2017)","journal-title":"Ann. Oper. Res."},{"key":"536_CR17","doi-asserted-by":"publisher","DOI":"10.1007\/s11590-016-1074-9","author":"J Pei","year":"2016","unstructured":"Pei, J., Liu, X., Pardalos, P.M., Li, K., Fan, W., Migdalas, A.: Single-machine serial-batching scheduling with a machine availability constraint, position-dependent processing time, and time-dependent set-up time. Optim. Lett. (2016). doi:\n                        10.1007\/s11590-016-1074-9","journal-title":"Optim. Lett."},{"issue":"9","key":"536_CR18","doi-asserted-by":"crossref","first-page":"2718","DOI":"10.1016\/j.cor.2005.10.014","volume":"34","author":"H Xuan","year":"2007","unstructured":"Xuan, H., Tang, L.X.: Scheduling a hybrid flowshop with batch production at the last stage. Comput. Oper. Res. 34(9), 2718\u20132733 (2007)","journal-title":"Comput. Oper. Res."},{"key":"536_CR19","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"RL Graham","year":"1979","unstructured":"Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation indeterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287\u2013326 (1979)","journal-title":"Ann. Discret. Math."},{"issue":"11","key":"536_CR20","doi-asserted-by":"crossref","first-page":"1097","DOI":"10.1016\/S0305-0548(97)00031-2","volume":"24","author":"P Hansen","year":"1997","unstructured":"Hansen, P., Mladenovi\u0107, N.: Variable neighborhood search. Comput. Oper. Res. 24(11), 1097\u20131100 (1997)","journal-title":"Comput. Oper. Res."},{"key":"536_CR21","doi-asserted-by":"crossref","unstructured":"Hansen, P., Mladenovi\u0107, N., P\u00e9rez, J.A.M.: Variable neighbourhood search: methods and applications. 4OR 175(4), 367\u2013407 (2008)","DOI":"10.1007\/s10288-008-0089-1"},{"key":"536_CR22","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.ins.2015.05.022","volume":"320","author":"L Wang","year":"2015","unstructured":"Wang, L., Ni, H., Yang, R., Pardalos, P.M., Du, X., Fei, M.: An adaptive simplified human learning optimization algorithm. Inf. Sci. 320, 126\u2013139 (2015)","journal-title":"Inf. Sci."},{"key":"536_CR23","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/j.cie.2016.10.015","volume":"102","author":"H Xia","year":"2016","unstructured":"Xia, H., Li, X., Gao, L.: A hybrid genetic algorithm with variable neighborhood search for dynamic integrated process planning and scheduling. Comput. Ind. Eng. 102, 99\u2013112 (2016)","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"536_CR24","doi-asserted-by":"crossref","first-page":"700","DOI":"10.1016\/j.ejor.2013.08.039","volume":"233","author":"P Borges","year":"2014","unstructured":"Borges, P., Eid, T., Bergseng, E.: Applying simulated annealing using different methods for the neighborhood search in forest planning problems. Eur. J. Oper. Res. 233(3), 700\u2013710 (2014)","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"536_CR25","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1007\/s00500-014-1262-4","volume":"19","author":"X Liang","year":"2015","unstructured":"Liang, X., Li, W., Zhang, Y., Zhou, M.: An adaptive particle swarm optimization method based on clustering. Soft Comput. 19(2), 431\u2013448 (2015)","journal-title":"Soft Comput."}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10898-017-0536-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-017-0536-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-017-0536-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,4,18]],"date-time":"2018-04-18T08:27:17Z","timestamp":1524040037000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10898-017-0536-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,6,1]]},"references-count":25,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2018,5]]}},"alternative-id":["536"],"URL":"https:\/\/doi.org\/10.1007\/s10898-017-0536-7","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,6,1]]}}}