{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T22:01:11Z","timestamp":1761948071547},"reference-count":32,"publisher":"Springer Science and Business Media LLC","issue":"11","license":[{"start":{"date-parts":[[2015,9,18]],"date-time":"2015-09-18T00:00:00Z","timestamp":1442534400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Med Syst"],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1007\/s10916-015-0349-5","type":"journal-article","created":{"date-parts":[[2015,9,18]],"date-time":"2015-09-18T11:07:59Z","timestamp":1442574479000},"update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":15,"title":["Simulation-Based Optimization for Surgery Scheduling in Operation Theatre Management Using Response Surface Method"],"prefix":"10.1007","volume":"39","author":[{"given":"Feng","family":"Liang","sequence":"first","affiliation":[]},{"given":"Yuanyuan","family":"Guo","sequence":"additional","affiliation":[]},{"given":"Richard Y. K.","family":"Fung","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2015,9,18]]},"reference":[{"issue":"1","key":"349_CR1","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1007\/s10729-006-9005-4","volume":"10","author":"B Denton","year":"2007","unstructured":"Denton, B., Viapiano, J., and Vogl, A., Optimization of surgery sequencing and scheduling decisions under uncertainty. Health Care Manag Sci 10(1):13\u201324, 2007.","journal-title":"Health Care Manag Sci"},{"issue":"1","key":"349_CR2","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1007\/s10729-010-9143-6","volume":"14","author":"F Guerriero","year":"2011","unstructured":"Guerriero, F., and Guido, R., Operational research in the management of the operating theatre: A survey. Health Care Manag. Sci. 14(1):89\u2013114, 2011.","journal-title":"Health Care Manag. Sci."},{"issue":"2","key":"349_CR3","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/s10729-007-9011-1","volume":"10","author":"A Testi","year":"2007","unstructured":"Testi, A., T\u00e0nfani, E., and Torre, G., A three-phase approach for operating theatre schedules. Health Care Manag. Sci. 10(2):163\u2013172, 2007.","journal-title":"Health Care Manag. Sci."},{"issue":"3","key":"349_CR4","doi-asserted-by":"crossref","first-page":"541","DOI":"10.1016\/S0377-2217(01)00219-3","volume":"140","author":"J Blake","year":"2002","unstructured":"Blake, J., and Carter, M., A goal programming approach to strategic resource allocation in acute care hospitals. Eur. J. Oper. Res. 140(3):541\u2013561, 2002.","journal-title":"Eur. J. Oper. Res."},{"issue":"5","key":"349_CR5","doi-asserted-by":"crossref","first-page":"1425","DOI":"10.1213\/01.ANE.0000149898.45044.3D","volume":"100","author":"F Dexter","year":"2005","unstructured":"Dexter, F., Ledolter, J., and Wachtel, R., Tactical decision making for selective expansion of operating room resources incorporating financial criteria and uncertainty in sub-specialties future workloads. Anesth. Analg. 100(5):1425\u20131432, 2005.","journal-title":"Anesth. Analg."},{"issue":"1","key":"349_CR6","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1213\/01.ane.0000289641.92927.b9","volume":"106","author":"R Wachtel","year":"2008","unstructured":"Wachtel, R., and Dexter, F., Tactical increases in operating room block time for capacity planning should not be based on utilization. Anesth. Analg. 106(1):215\u2013226, 2008.","journal-title":"Anesth. Analg."},{"issue":"5","key":"349_CR7","doi-asserted-by":"crossref","first-page":"663","DOI":"10.1057\/palgrave.jors.2602596","volume":"60","author":"B Zhang","year":"2009","unstructured":"Zhang, B., Murali, P., Dessouky, M., et al., A mixed integer programming approach for allocating operating room capacity. J. Oper. Res. Soc. 60(5):663\u2013673, 2009.","journal-title":"J. Oper. Res. Soc."},{"issue":"2","key":"349_CR8","doi-asserted-by":"crossref","first-page":"1185","DOI":"10.1016\/j.ejor.2005.06.063","volume":"176","author":"J Beli\u00ebn","year":"2007","unstructured":"Beli\u00ebn, J., Demeulemeester, E., and Cardoen, B., Building cyclic master surgery schedules with levelled resulting bed occupancy: A case study. Eur. J. Oper. Res. 176(2):1185\u20131204, 2007.","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"349_CR9","doi-asserted-by":"crossref","first-page":"355","DOI":"10.1007\/s00291-006-0068-x","volume":"30","author":"J Oostrum","year":"2008","unstructured":"Oostrum, J., Houdenhoven, M., Hurink, J., et al., A master surgical scheduling approach for cyclic scheduling in operating room departments. OR Spectr. 30(2):355\u2013374, 2008.","journal-title":"OR Spectr."},{"issue":"2","key":"349_CR10","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1007\/s10729-008-9080-9","volume":"12","author":"I Adan","year":"2009","unstructured":"Adan, I., Bekkers, J., Dellaert, N., et al., Patient mix optimisation and stochastic resource requirements: A case study in cardiothoracic surgery planning. Health Care Manag. Sci. 12(2):129\u2013141, 2009.","journal-title":"Health Care Manag. Sci."},{"issue":"2","key":"349_CR11","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1093\/imaman\/dps033","volume":"24","author":"C Banditori","year":"2013","unstructured":"Banditori, C., Cappanera, P., and Visintin, F., A combined optimization\u2013simulation approach to the master surgical scheduling problem. IMA J. Manag. Math. 24(2):155\u2013187, 2013.","journal-title":"IMA J. Manag. Math."},{"issue":"1","key":"349_CR12","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1016\/j.cor.2013.11.007","volume":"44","author":"S Choi","year":"2014","unstructured":"Choi, S., and Wilhelm, W., On capacity allocation for operating rooms. Comput. Oper. Res. 44(1):174\u2013184, 2014.","journal-title":"Comput. Oper. Res."},{"key":"349_CR13","volume-title":"Operating room management","author":"R Gabel","year":"1999","unstructured":"Gabel, R., Kulli, J., Stephen Lee, B., et al., Operating room management. Butterworth-Heinemann, London, 1999."},{"issue":"6","key":"349_CR14","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1023\/A:1005548727003","volume":"24","author":"I Ozkarahan","year":"2000","unstructured":"Ozkarahan, I., Allocation of surgeries to operating rooms using goal programming. J. Med. Syst. 24(6):339\u2013378, 2000.","journal-title":"J. Med. Syst."},{"issue":"1","key":"349_CR15","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1016\/S0925-5273(03)00087-2","volume":"85","author":"A Guinet","year":"2003","unstructured":"Guinet, A., and Chaabane, S., Operating theatre planning. Int. J. Prod. Econ. 85(1):69\u201381, 2003.","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"349_CR16","doi-asserted-by":"crossref","first-page":"1026","DOI":"10.1016\/j.ejor.2006.02.057","volume":"185","author":"M Lamiri","year":"2008","unstructured":"Lamiri, M., Xie, X., Dolgui, A., and Grimaud, F., A stochastic model for operating room planning with elective and emergency demand for surgery. Eur. J. Oper. Res. 185(3):1026\u20131037, 2008.","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"349_CR17","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.ijpe.2006.08.030","volume":"112","author":"H Fei","year":"2008","unstructured":"Fei, H., Chu, C., Meskens, N., and Artiba, A., Solving surgical cases assignment problem by a branch-and-price approach. Int. J. Prod. Econ. 112(1):96\u2013108, 2008.","journal-title":"Int. J. Prod. Econ."},{"issue":"3","key":"349_CR18","doi-asserted-by":"crossref","first-page":"1038","DOI":"10.1016\/j.ejor.2006.08.022","volume":"185","author":"E Hans","year":"2008","unstructured":"Hans, E., Wullink, G., Houdenhoven, M., et al., Robust surgery loading. Eur. J. Oper. Res. 185(3):1038\u20131050, 2008.","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"349_CR19","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1007\/s00291-011-0279-7","volume":"34","author":"I Marques","year":"2012","unstructured":"Marques, I., Captivo, M., and Pato, M., An integer programming approach to elective surgery scheduling. OR Spectr. 34(2):407\u2013427, 2012.","journal-title":"OR Spectr."},{"issue":"3","key":"349_CR20","doi-asserted-by":"crossref","first-page":"1191","DOI":"10.1007\/s10916-010-9648-z","volume":"36","author":"C Rizk","year":"2012","unstructured":"Rizk, C., and Arnaout, J., ACO for the surgical cases assignment problem. J. Med. Syst. 36(3):1191\u20131199, 2012.","journal-title":"J. Med. Syst."},{"issue":"2","key":"349_CR21","doi-asserted-by":"crossref","first-page":"1185","DOI":"10.1016\/j.ejor.2005.06.063","volume":"176","author":"J Beli\u00ebn","year":"2007","unstructured":"Beli\u00ebn, J., and Demeulemeester, E., Building cyclic master surgery schedules with leveled resulting bed occupancy. Eur. J. Oper. Res. 176(2):1185\u20131204, 2007.","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"349_CR22","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1002\/nav.10060","volume":"50","author":"VN Hsu","year":"2003","unstructured":"Hsu, V. N., de Matta, R., and Lee, C. Y., Scheduling patients in an ambulatory operation theatre. Nav. Res. Logist. 50(3):218\u2013238, 2003.","journal-title":"Nav. Res. Logist."},{"issue":"1","key":"349_CR23","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1213\/00000539-200201000-00027","volume":"94","author":"JT Blake","year":"2002","unstructured":"Blake, J. T., Dexter, F., and Donald, J., Operating room manager\u2019s use of integer programming for assigning block time to surgical groups: A case study. Anesth. Analg. 94(1):143\u2013148, 2002.","journal-title":"Anesth. Analg."},{"issue":"2","key":"349_CR24","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1007\/s10729-010-9145-4","volume":"14","author":"TR Rohleder","year":"2011","unstructured":"Rohleder, T. R., Lewkonia, P., Bischak, D. P., et al., Using simulation modeling to improve patient flow at an outpatient orthopedic clinic. Health Care Manag. Sci. 14(2):135\u2013145, 2011.","journal-title":"Health Care Manag. Sci."},{"issue":"3","key":"349_CR25","doi-asserted-by":"crossref","first-page":"936","DOI":"10.1016\/j.ejor.2008.10.025","volume":"198","author":"MA Ahmed","year":"2009","unstructured":"Ahmed, M. A., and Alkhamis, T. M., Simulation optimization for an emergency department healthcare unit in Kuwait. Eur. J. Oper. Res. 198(3):936\u2013942, 2009.","journal-title":"Eur. J. Oper. Res."},{"issue":"2","key":"349_CR26","doi-asserted-by":"crossref","first-page":"646","DOI":"10.1016\/j.ijpe.2012.10.004","volume":"141","author":"A Saremi","year":"2013","unstructured":"Saremi, A., Jula, P., ElMekkawy, T., et al., Appointment scheduling of outpatient surgical services in a multistage operating room department. Int. J. Prod. Econ. 141(2):646\u2013658, 2013.","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"349_CR27","first-page":"21","volume":"54","author":"R Aringhieri","year":"2015","unstructured":"Aringhieri, R., Landa, P., Soriano, P., et al., A two level meta heuristic for the operating room scheduling and assignment problem. Comput. Oper. Res. 54(1):21\u201334, 2015.","journal-title":"Comput. Oper. Res."},{"issue":"1","key":"349_CR28","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1016\/j.ejor.2013.10.040","volume":"235","author":"S Choi","year":"2014","unstructured":"Choi, S., and Wilhelm, W., An approach to optimize block surgical schedules. Eur. J. Oper. Res. 235(1):138\u2013148, 2014.","journal-title":"Eur. J. Oper. Res."},{"issue":"9","key":"349_CR29","doi-asserted-by":"crossref","first-page":"2165","DOI":"10.1016\/j.cor.2012.11.004","volume":"40","author":"R Aringhieri","year":"2013","unstructured":"Aringhieri, R., T\u00e0nfani, E., and Testi, A., Operations research for health care delivery. Comput. Oper. Res. 40(9):2165\u20132166, 2013.","journal-title":"Comput. Oper. Res."},{"issue":"08","key":"349_CR30","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1016\/j.cie.2014.07.022","volume":"78","author":"R M\u2019Hallah","year":"2014","unstructured":"M\u2019Hallah, R., and Al-Roomi, A. H., The planning and scheduling of operating rooms: A simulation approach. Comput. Ind. Eng. 78(08):235\u2013248, 2014.","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"349_CR31","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1287\/opre.25.1.45","volume":"25","author":"SS Panwalkar","year":"1977","unstructured":"Panwalkar, S. S., and Iskander, W., A survey of scheduling rules. Oper. Res. 25(1):45\u201361, 1977.","journal-title":"Oper. Res."},{"issue":"1","key":"349_CR32","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1111\/j.2517-6161.1951.tb00067.x","volume":"13","author":"GEP Box","year":"1951","unstructured":"Box, G. E. P., and Wilson, K. B., On the experimental attainment of optimum conditions. J. R. Stat. Soc. Ser. B 13(1):1\u201345, 1951.","journal-title":"J. R. Stat. Soc. Ser. B"}],"container-title":["Journal of Medical Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10916-015-0349-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10916-015-0349-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10916-015-0349-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,11]],"date-time":"2024-06-11T06:07:38Z","timestamp":1718086058000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10916-015-0349-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,9,18]]},"references-count":32,"journal-issue":{"issue":"11","published-print":{"date-parts":[[2015,11]]}},"alternative-id":["349"],"URL":"https:\/\/doi.org\/10.1007\/s10916-015-0349-5","relation":{},"ISSN":["0148-5598","1573-689X"],"issn-type":[{"value":"0148-5598","type":"print"},{"value":"1573-689X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,9,18]]},"article-number":"159"}}