{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,13]],"date-time":"2026-06-13T10:15:36Z","timestamp":1781345736624,"version":"3.54.1"},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2005,1,1]],"date-time":"2005-01-01T00:00:00Z","timestamp":1104537600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2005,1]]},"DOI":"10.1007\/s10951-005-5315-5","type":"journal-article","created":{"date-parts":[[2005,2,15]],"date-time":"2005-02-15T06:50:20Z","timestamp":1108450220000},"page":"49-74","source":"Crossref","is-referenced-by-count":46,"title":["Scheduling Parallel Machines for the Customer Order Problem"],"prefix":"10.1007","volume":"8","author":[{"given":"Jaehwan","family":"Yang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Marc E.","family":"Posner","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","reference":[{"key":"CR1","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1080\/07408178808966147","volume":"20","author":"K. R. Baker","year":"1988","unstructured":"Baker, K. R. ?Scheduling the production of components at a common facility,?IIE Trans., 20, 32?35 (1988).","journal-title":"IIE Trans."},{"key":"CR2","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1002\/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO;2-7","volume":"43","author":"J. D. Blocher","year":"1996","unstructured":"Blocher, J. D. and D. Chhajed, ?The customer order lead time problem on parallel machines,?Naval Res. Logist., 43, 629?654 (1996).","journal-title":"Naval Res. Logist."},{"key":"CR3","doi-asserted-by":"crossref","first-page":"951","DOI":"10.1111\/j.1540-5915.1998.tb00883.x","volume":"29","author":"J. D. Blocher","year":"1998","unstructured":"Blocher, J. D. D. Chhajed and M. Leung ?Customer order scheduling in a general job shop environment,?Dec. Sci., 29, 951?981 (1998).","journal-title":"Dec. Sci."},{"key":"CR4","doi-asserted-by":"crossref","first-page":"426","DOI":"10.1287\/opre.37.3.426","volume":"37","author":"E. G. Coffman","year":"1989","unstructured":"Coffman, E. G. A. Nozari and M. Yannakakis ?Optimal scheduling of products with two subassemblies on a single machine,?Opns. Res., 37, 426?436 (1989).","journal-title":"Opns. Res."},{"key":"CR5","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/0191-2615(89)90001-5","volume":"23B","author":"C. F. Daganzo","year":"1989","unstructured":"Daganzo, C. F. ?The crane scheduling problem,?Transpn. Res.-B, 23B, 159?175 1989","journal-title":"Transpn. Res.-B"},{"key":"CR6","doi-asserted-by":"crossref","first-page":"250","DOI":"10.1016\/S0377-2217(99)00154-X","volume":"120","author":"A. E. Gerodimos","year":"2000","unstructured":"Gerodimos, A. E. C. A. Glass and C. N. Potts ?Scheduling the production of two-component jobs on a single machine,?Euro. J. Opnl. Res., 120, 250?259 (2000).","journal-title":"Euro. J. Opnl. Res."},{"key":"CR7","doi-asserted-by":"crossref","first-page":"1563","DOI":"10.1002\/j.1538-7305.1966.tb01709.x","volume":"45","author":"R. L. Graham","year":"1966","unstructured":"Graham, R. L. ?Bounds for certain multiprocess anomalies,?Bell Sys. Tech. J., 45, 1563?1581 (1966).","journal-title":"Bell Sys. Tech. J."},{"key":"CR8","doi-asserted-by":"crossref","first-page":"416","DOI":"10.1137\/0117039","volume":"17","author":"R. L. Graham","year":"1969","unstructured":"Graham, R. L. ?Bounds on multiprocessing timing anomalies,? SIAM J. Appl. Math., 17, 416?429 (1969).","journal-title":"SIAM J. Appl. Math."},{"key":"CR9","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R. L. Graham","year":"1979","unstructured":"Graham, R. L. E. L. Lawler J. K. Lenstra andA. H. G. Rinnooy Kan ?Optimization and approximation in deterministic machine scheduling: A survey,?Ann. Disc. Math., 5, 287?326 (1979).","journal-title":"Ann. Disc. Math."},{"key":"CR10","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1023\/A:1018913902852","volume":"70","author":"J. N. D. Gupta","year":"1997","unstructured":"Gupta, J. N. D. J. C. Ho and A. A. van der Veen ?Single machine hierarchical scheduling with customer orders and multiple job classes,?Ann. Oper. Res., 70, 127?143 (1997).","journal-title":"Ann. Oper. Res."},{"key":"CR11","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-48403-2","volume-title":"Batching and Scheduling: Models and Methods for Several Problem Classes","author":"C. Jordan","year":"1996","unstructured":"Jordan, C. Batching and Scheduling: Models and Methods for Several Problem Classes, Springer, New York, 1996."},{"key":"CR12","first-page":"177","volume":"3","author":"F. M. Julien","year":"1990","unstructured":"Julien, F. M. and M. J. Magazine ?Scheduling customer orders: An alternative production scheduling approach,?J. Mfg. Oper. Mgt., 3, 177?199 (1990).","journal-title":"J. Mfg. Oper. Mgt."},{"key":"CR13","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/0191-2615(90)90014-P","volume":"24B","author":"R. L. Peterkofsky","year":"1990","unstructured":"Peterkofsky, R. L. and C. F. Daganzo, ?A branch and bound solution method for the crane scheduling problem,?Transpn. Res.-B, 24B, 159?172 (1990).","journal-title":"Transpn. Res.-B"},{"key":"CR14","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1057\/jors.1992.66","volume":"43","author":"C. N. Potts","year":"1992","unstructured":"Potts, C. N. and L. N. Van Wassenhove ?Integrating scheduling with batching and lot-sizing: A review of algorithm and complexity,?J. Opnl. Res. Soc., 43, 395?406 (1992).","journal-title":"J. Opnl. Res. Soc."},{"key":"CR15","first-page":"99","volume":"4","author":"C. Santos","year":"1985","unstructured":"Santos, C. and M. Magazine ?Batching in single operation manufacturing systems,?OR Lett., 4, 99?103 (1985).","journal-title":"OR Lett."},{"key":"CR16","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1080\/07408179308964278","volume":"25","author":"R. G. Vickson","year":"1993","unstructured":"Vickson, R. G. M. J. Magazine and C. A. Santos ?Batching and sequencing of components at a single facility,?IIE Trans., 25, 65?70 (1993).","journal-title":"IIE Trans."},{"key":"CR17","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"C. Webster","year":"1995","unstructured":"Webster, C. and K. R. Baker ?Scheduling groups of jobs on a single machine,?Opns. Res., 43, 692?703 (1995).","journal-title":"Opns. Res."}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-005-5315-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-005-5315-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-005-5315-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:37Z","timestamp":1559453977000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-005-5315-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,1]]},"references-count":17,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2005,1]]}},"alternative-id":["5315"],"URL":"https:\/\/doi.org\/10.1007\/s10951-005-5315-5","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2005,1]]}}}