{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T22:09:25Z","timestamp":1770502165429,"version":"3.49.0"},"reference-count":15,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2007,2,1]],"date-time":"2007-02-01T00:00:00Z","timestamp":1170288000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2007,2,14]]},"DOI":"10.1007\/s10951-006-0005-5","type":"journal-article","created":{"date-parts":[[2007,2,3]],"date-time":"2007-02-03T03:01:04Z","timestamp":1170471664000},"page":"87-95","source":"Crossref","is-referenced-by-count":27,"title":["A note on the two machine job shop with the weighted late work criterion"],"prefix":"10.1007","volume":"10","author":[{"given":"Jacek","family":"Blazewicz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Erwin","family":"Pesch","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ma\u0142gorzata","family":"Sterna","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Frank","family":"Werner","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,2,1]]},"reference":[{"issue":"6","key":"5_CR1","first-page":"415","volume":"3","author":"J. Blazewicz","year":"1984","unstructured":"Blazewicz, J., \u201cScheduling preemptible tasks on parallel processors with information loss,\u201d Recherche Technique et Science Informatiques, 3(6), 415\u2013420 (1984).","journal-title":"Recherche Technique et Science Informatiques"},{"key":"5_CR2","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-04363-9","volume-title":"Scheduling Computer and Manufacturing Processes","author":"J. Blazewicz","year":"2001","unstructured":"Blazewicz, J., K. Ecker, E. Pesch, G. Schmidt, and J. Weglarz, Scheduling Computer and Manufacturing Processes. 2nd edn. Springer, Berlin, Heidelberg, New York, 2001.","edition":"2nd"},{"key":"5_CR3","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1016\/0020-0190(87)90145-1","volume":"24","author":"J. Blazewicz","year":"1987","unstructured":"Blazewicz. J. and G. Finke, \u201cMinimizing mean weighted execution time loss on identical and uniform processors,\u201d Information Processing Letters, 24, 259\u2013263 (1987).","journal-title":"Information Processing Letters"},{"key":"5_CR4","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0166-218X(03)00339-1","volume":"134","author":"J. Blazewicz","year":"2004","unstructured":"Blazewicz, J., E. Pesch, M. Sterna, and F. Werner, \u201cOpen shop scheduling problems with late work criteria,\u201d Discrete Applied Mathematics, 134, 1\u201324 (2004).","journal-title":"Discrete Applied Mathematics"},{"issue":"2","key":"5_CR5","doi-asserted-by":"crossref","first-page":"408","DOI":"10.1016\/j.ejor.2004.04.011","volume":"165","author":"J. Blazewicz","year":"2005","unstructured":"Blazewicz, J., E. Pesch, M. Sterna, and F. Werner, \u201cThe two-machine flow-shop problem with weighted late work criterion and common due date,\u201d European Journal of Operational Research, 165(2), 408\u2013415 (2005).","journal-title":"European Journal of Operational Research"},{"key":"5_CR6","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03612-9","volume-title":"Scheduling Algorithms","author":"P. Brucker","year":"1998","unstructured":"Brucker, P., Scheduling Algorithms. 2nd edn. Springer, Berlin, Heidelberg, New York, 1998.","edition":"2nd"},{"key":"5_CR7","volume-title":"Computers and Intractability","author":"M. R. Garey","year":"1979","unstructured":"Garey, M. R. and D. S. Johnson, Computers and Intractability. W.H. Freeman and Co., San Francisco (1979)."},{"key":"5_CR8","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1002\/nav.3800030307","volume":"3","author":"J. R. Jackson","year":"1956","unstructured":"Jackson, J. R., \u201cAn extension of Johnson\u2019s results on job shop scheduling,\u201d Naval Research Logistics Quarterly, 3, 201\u2013203 (1956).","journal-title":"Naval Research Logistics Quarterly"},{"key":"5_CR9","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S. M. Johnson","year":"1954","unstructured":"Johnson, S. M., \u201cOptimal two- and three-stage production schedules with setup times included,\u201d Naval Research Logistics Quarterly, 1, 61\u201368 (1954).","journal-title":"Naval Research Logistics Quarterly"},{"issue":"5","key":"5_CR10","doi-asserted-by":"crossref","first-page":"277","DOI":"10.1016\/0167-6377(94)90041-8","volume":"16","author":"J. Jozefowska","year":"1994","unstructured":"Jozefowska, J., B. Jurisch, and W. Kubiak, \u201cScheduling shops to minimize the weighted number of late jobs,\u201d Operation Research Letters, 16(5), 277\u2013283 (1994).","journal-title":"Operation Research Letters"},{"key":"5_CR11","unstructured":"Leung, J. Y. T., \u201cMinimizing total weighted error for imprecise computation tasks and related problems,\u201d in: J. Y. T. Leung (ed.), Handbook of Scheduling: Algorithms, Models, and Performance Analysis. CRC Press, Boca Raton, 2004; Chapter 34:1\u201316."},{"key":"5_CR12","volume-title":"Operation Scheduling with Applications in Manufacturing and Services","author":"M. Pinedo","year":"1999","unstructured":"Pinedo, M. and X. Chao, Operation Scheduling with Applications in Manufacturing and Services. Irwin\/McGraw-Hill, Boston (1999)."},{"issue":"3","key":"5_CR13","doi-asserted-by":"crossref","first-page":"586","DOI":"10.1287\/opre.40.3.586","volume":"40","author":"C. N. Potts","year":"1991","unstructured":"Potts, C. N. and L. N. van Wassenhove, \u201cSingle machine scheduling to minimize total late work,\u201d Operations Research, 40(3), 586\u2013595 (1991).","journal-title":"Operations Research"},{"key":"5_CR14","unstructured":"Sterna, M., Problems and Algorithms in Non-Classical Shop Scheduling. Scientific Publishers of the Polish Academy of Sciences, Poznan (2000)."},{"key":"5_CR15","volume-title":"Late Work Scheduling in Shop Systems","author":"M. Sterna","year":"2006","unstructured":"Sterna, M., Late Work Scheduling in Shop Systems. Publishing House of Poznan University of Technology, Poznan (2006)."}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-006-0005-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-006-0005-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-006-0005-5","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:38Z","timestamp":1559468378000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-006-0005-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,2,1]]},"references-count":15,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2007,2,14]]}},"alternative-id":["5"],"URL":"https:\/\/doi.org\/10.1007\/s10951-006-0005-5","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,2,1]]}}}