{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,6]],"date-time":"2025-12-06T04:52:49Z","timestamp":1764996769367},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2006,2,1]],"date-time":"2006-02-01T00:00:00Z","timestamp":1138752000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2006,2]]},"DOI":"10.1007\/s10951-006-5592-7","type":"journal-article","created":{"date-parts":[[2006,1,9]],"date-time":"2006-01-09T13:57:20Z","timestamp":1136815040000},"page":"35-48","source":"Crossref","is-referenced-by-count":25,"title":["Two Machine Scheduling under Disruptions with Transportation Considerations"],"prefix":"10.1007","volume":"9","author":[{"given":"Chung-Yee","family":"Lee","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Joseph Y-T.","family":"Leung","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Gang","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","reference":[{"key":"5592_CR1","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1007\/BF00288977","volume":"26","author":"I. Adiri","year":"1989","unstructured":"Adiri, I., J. Bruno, E. Frostig, and A. H. G. Rinnooy Kan, \u201cSingle Machine Flow-Time Scheduling with a Single Breakdown,\u201d Acta Informatica, 26, 679\u2013696 (1989).","journal-title":"Acta Informatica"},{"key":"5592_CR2","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/S0377-2217(97)00396-2","volume":"112","author":"M. S. Akturk","year":"1999","unstructured":"Akturk, M. S. and E. Gorgulu, \u201cMatch-up Scheduling under a Machine Breakdown,\u201d European Journal of Operational Research, 112, 81\u201397 (1999).","journal-title":"European Journal of Operational Research"},{"key":"5592_CR3","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1023\/A:1009772208981","volume":"5","author":"M. F. Arguello","year":"1997","unstructured":"Arguello, M. F., J. F. Bard, and G. Yu, \u201cA GRASP for Aircraft Routing in Response to Groundings and Delays,\u201d Journal on Combinatorial Optimization 5, 211\u2013228 (1997).","journal-title":"Journal on Combinatorial Optimization"},{"key":"5592_CR4","unstructured":"Aytug, H., M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy, \u201cExecuting Production Schedules in the Face of Uncertainties: A Review and Some Future Directions,\u201d to appear in European Journal of Operational Research (2002)."},{"key":"5592_CR5","doi-asserted-by":"crossref","first-page":"470","DOI":"10.1287\/opre.39.3.470","volume":"39","author":"J. C. Bean","year":"1991","unstructured":"Bean, J. C., J. R. Birge, J. Mittenthal, and C.E. Noon, \u201cMatchup Scheduling with Multiple Resources, Release Dates and Disruptions,\u201d Operations Research, 39, 470\u2013483 (1991).","journal-title":"Operations Research"},{"key":"5592_CR6","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1016\/0167-6377(88)90056-9","volume":"7","author":"J. Birge","year":"1988","unstructured":"Birge, J. and K. D. Glazebrook, \u201cAssessing the Effects of Machine Breakdowns in Stochastic Scheduling,\u201d Operations Research Letters, 7, 267\u2013271 (1988).","journal-title":"Operations Research Letters"},{"key":"5592_CR7","doi-asserted-by":"crossref","first-page":"661","DOI":"10.1002\/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO;2-3","volume":"37","author":"J. Birge","year":"1990","unstructured":"Birge, J., J. B. G. Frenk, J. Mittenthal, and A. H. G. Rinnooy Kan, \u201cSingle-Machine Scheduling Subject to Stochastic Breakdowns,\u201d Naval Research Logistics, 37, 661\u2013677 (1990).","journal-title":"Naval Research Logistics"},{"key":"5592_CR8","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-04363-9","volume-title":"Scheduling Computer and Manufacturing Processes","author":"J. Blazewicz","year":"2001","unstructured":"Blazewicz J., K. Ecker, G. Schmidt, and J. Weglarz, Scheduling Computer and Manufacturing Processes, 2nd Edition, Springer-Verlag, Berlin (2001).","edition":"2nd Edition"},{"key":"5592_CR9","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-662-03612-9","volume-title":"Scheduling Algorithm","author":"P. Brucker","year":"1998","unstructured":"Brucker, P., Scheduling Algorithm, 2nd Edition, Springer-Verlag, Berlin (1998).","edition":"2nd Edition"},{"key":"5592_CR10","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/0377-2217(93)90236-G","volume":"70","author":"C. -L. Chen","year":"1993","unstructured":"Chen, C. -L. and R. L. Bulfin, \u201cComplexity of Single Machine, Multi-Criteria Scheduling Problems,\u201d European Journal of Operational Research, 70, 115\u2013125 (1993).","journal-title":"European Journal of Operational Research"},{"key":"5592_CR11","first-page":"40","volume":"28","author":"J. J. Clausen","year":"2001","unstructured":"Clausen, J. J., J. Hansen, J. Larsen, and A. Larsen, \u201cDisruption Management,\u201d ORMS Today, 28, 40\u201343 (2001).","journal-title":"ORMS Today"},{"key":"5592_CR12","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1017\/S0269964800002138","volume":"5","author":"E. Frostig","year":"1991","unstructured":"Frostig, E., \u201cA Note on Stochastic Scheduling on a Single Machine Scheduling Subject to Breakdown-The Preemptive Repeat Model,\u201d Probability in the Engineering and Informational Sciences, 5, pp. 349\u2013354 (1991).","journal-title":"Probability in the Engineering and Informational Sciences"},{"key":"5592_CR13","volume-title":"Computers and Intractability: A Guide to the Theory of NP-Completeness","author":"M. R. Garey","year":"1979","unstructured":"Garey, M. R. and D. S. Johnson, Computers and Intractability: A Guide to the Theory of NP-Completeness, Freeman, San Francisco (1979)."},{"key":"5592_CR14","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1002\/1520-6750(198706)34:3<319::AID-NAV3220340303>3.0.CO;2-5","volume":"34","author":"K. D. Glazebrook","year":"1987","unstructured":"Glazebrook, K. D., \u201cEvaluating the Effects of Machine Breakdowns in Stochastic Scheduling Problems,\u201d Naval Research Logistics, 34, 319\u2013335 (1987).","journal-title":"Naval Research Logistics"},{"key":"5592_CR15","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1023\/A:1020959218072","volume":"3","author":"B. Golany","year":"2002","unstructured":"Golany, B., Y. Xia, J. Yang, and G. Yu, \u201cAn Iterative Goal-Programming Procedure for Operational Recovery Problems,\u201d Journal of Optimization and Engineering, 3, 109\u2013127 (2002).","journal-title":"Journal of Optimization and Engineering"},{"key":"5592_CR16","doi-asserted-by":"crossref","first-page":"845","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#","volume":"46","author":"G. H. Graves","year":"1999","unstructured":"Graves, G. H. and C. -Y. Lee, \u201cScheduling Maintenance and Semiresumable Jobs on a Single Machine,\u201d Naval Research Logistics, 46, 845\u2013863 (1999).","journal-title":"Naval Research Logistics"},{"key":"5592_CR17","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1287\/opre.49.1.134.11192","volume":"49","author":"N. G. Hall","year":"2001","unstructured":"Hall, N. G., M. A. Lesaoana, and C. N. Potts, \u201cScheduling with Fixed Delivery Dates,\u201d Operations Research, 49, 134\u2013144 (2001).","journal-title":"Operations Research"},{"key":"5592_CR18","first-page":"385","volume":"51","author":"N. G. Hall","year":"2003","unstructured":"Hall, N. G. and C. N. Potts, \u201cSupply Chain Scheduling: Batching and Delivery,\u201d Operations Research, 51, 385\u2013407 (2003).","journal-title":"Operations Research"},{"key":"5592_CR19","unstructured":"Hurink, J. and S. Knust, \u201cFlow-shop Problems with Transportation Times and a Single Robot,\u201d Preprints 1998, Fachbereich Mathematik\/Informatik, Universitat Osnabruck (1998)."},{"key":"5592_CR20","doi-asserted-by":"crossref","first-page":"266","DOI":"10.1287\/trsc.27.3.266","volume":"27","author":"A. I. Z. Jarrah","year":"1993","unstructured":"Jarrah, A. I. Z., G. Yu, N. Krishnamurthy, and A. Rakshit, \u201cA Decision Support Framework for Airline Flight Cancellations and Delays,\u201d Transportation Science, 27, 266\u2013280 (1993).","journal-title":"Transportation Science"},{"key":"5592_CR21","doi-asserted-by":"crossref","first-page":"266","DOI":"10.1080\/07408178908966231","volume":"21","author":"C.-Y. Lee","year":"1989","unstructured":"Lee, C.-Y., \u201cA Solution to the Multiple Set\u2014Up Problem with Dynamic Demand,\u201d IIE Transactions, 21, 266\u2013270 (1989).","journal-title":"IIE Transactions"},{"key":"5592_CR22","unstructured":"Lee, C.-Y., \u201cMachine Scheduling with Availability Constraints,\u201d in Handbook of Scheduling: Algorithms, Models, and Performance Analysis, Joseph Leung (Ed.), CRC Press 22.1\u201322.13 (2004)."},{"key":"5592_CR23","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1002\/1099-1425(200101\/02)4:1<3::AID-JOS57>3.0.CO;2-D","volume":"4","author":"C. -Y. Lee","year":"2001","unstructured":"Lee, C. -Y. and Z. L. Chen, \u201cMachine Scheduling with Transportation Considerations,\u201d Journal of Scheduling, 4, 3\u201324 (2001).","journal-title":"Journal of Scheduling"},{"key":"5592_CR24","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1016\/S0377-2217(00)00088-6","volume":"135","author":"C. -Y. Lee","year":"2001","unstructured":"Lee, C. -Y. and C. -S. Lin, \u201cMachine Scheduling with Maintenance and Repair Rate-Modifying Activities,\u201d European Journal of Operational Research, 135, 491\u2013513 (2001).","journal-title":"European Journal of Operational Research"},{"key":"5592_CR25","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1002\/1520-6750(199202)39:1<53::AID-NAV3220390105>3.0.CO;2-C","volume":"39","author":"V. J. Leon","year":"1992","unstructured":"Leon, V. J. and S. D. Wu, \u201cOn Scheduling with Ready-Times, Due-Dates and Vacations,\u201d Naval Res. Logist. 39, 53\u201365 (1992).","journal-title":"Naval Res. Logist."},{"key":"5592_CR26","doi-asserted-by":"crossref","first-page":"1451","DOI":"10.1080\/00207549408957010","volume":"32","author":"V. J. Leon","year":"1994","unstructured":"Leon, V. J., S. D. Wu, and R. H. Storer, \u201cA Game-Theoretic Control Approach for Job Shops in the Presence of Disruption,\u201d International Journal of Production Research, 32, 1451\u20131476 (1994).","journal-title":"International Journal of Production Research"},{"key":"5592_CR27","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1287\/trsc.31.4.298","volume":"31","author":"S. Luo","year":"1997","unstructured":"Luo, S. and G. Yu, \u201cOn the Airline Schedule Perturbation Problem Caused by the Ground Delay Program,\u201d Transportation Science, 31, 298\u2013311 (1997).","journal-title":"Transportation Science"},{"key":"5592_CR28","volume-title":"Scheduling: Theory, Algorithms and Systems","author":"M. L. Pinedo","year":"2002","unstructured":"Pinedo, M. L., Scheduling: Theory, Algorithms and Systems, 2nd Edition, Prentice-Hall, Englewood Cliffs, NJ (2002).","edition":"2nd Edition"},{"key":"5592_CR29","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1017\/S0269964800000619","volume":"2","author":"M. L. Pinedo","year":"1988","unstructured":"Pinedo, M. L. and E. Rammouz, \u201cA Note on Stochastic Scheduling Machine Subject to Breakdown and Repair,\u201d Probability in the Engineering and Informational Sciences, 2, 41\u201349 (1988).","journal-title":"Probability in the Engineering and Informational Sciences"},{"key":"5592_CR30","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1057\/palgrave.jors.2600791","volume":"50","author":"X. Qi","year":"1999","unstructured":"Qi, X., T. Chen, and F. Tu, \u201cScheduling the Maintenance on a Single Machine,\u201d Journal of the Operational Research Society, 50, 1071\u20131078 (1999).","journal-title":"Journal of the Operational Research Society"},{"key":"5592_CR31","unstructured":"Qi, X., J. F. Bard, and G. Yu, \u201cDisruption Management for Machine Scheduling,\u201d International Journal of Production Economics, accepted for publication (2005)."},{"key":"5592_CR32","unstructured":"Qin, S. Z. and G. Yu, \u201cFab-wide Control and Disruption Management in High-Volume Semiconductor Manufacturing,\u201d NSF Grant 04\u2013532 (2004)."},{"key":"5592_CR33","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","volume":"121","author":"G. Schmidt","year":"2000","unstructured":"Schmidt, G., \u201cScheduling with Limited Machine Availability,\u201d European Journal of Operational Research, 121, 1\u201315 (2000).","journal-title":"European Journal of Operational Research"},{"key":"5592_CR34","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1016\/0377-2217(84)90207-8","volume":"15","author":"D. Teodorovic","year":"1984","unstructured":"Teodorovic, D. and S. Guberinic, \u201cOptimal Dispatching Strategy on an Airline Network after a Schedule Perturbation,\u201d European Journal of Operational Research, 15, 178\u2013182 (1984).","journal-title":"European Journal of Operational Research"},{"key":"5592_CR35","first-page":"181","volume":"32","author":"B. Thengvall","year":"2000","unstructured":"Thengvall, B., J. F. Bard, and G. Yu, \u201cBalancing User Preferences for Aircraft Recovery during Airline Irregular Operations,\u201d IIE Transaction, 32, 181\u2013193 (2000).","journal-title":"IIE Transaction"},{"key":"5592_CR36","unstructured":"\u201cTrial by Fire: A Blaze in Albuquerque Sets Off Major Crisis,\u201d The Wall Street Journal, 1\/29\/2001, Page A1."},{"key":"5592_CR37","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1023\/A:1018955111939","volume":"70","author":"A. T. Unal","year":"1997","unstructured":"Unal, A. T., R. Uzsoy, and A. S. Kiran, \u201cRescheduling on a Single Machine with Part-Type Dependent Setup Times and Deadlines,\u201d Annals of Operations Research, 70, 93\u2013113 (1997).","journal-title":"Annals of Operations Research"},{"key":"5592_CR38","unstructured":"Vieira, G. E., J. Herrmann, and E. Lin, \u201cRescheduling Manufacturing Systems: A Framework of Strategies Policies, and Methods,\u201d Working Paper, The Institute of Systems Research, The University of Maryland (2002)."},{"key":"5592_CR39","doi-asserted-by":"crossref","first-page":"405","DOI":"10.1016\/0191-2615(96)00013-6","volume":"30","author":"S. Yan","year":"1996","unstructured":"Yan, S. and D. Yang, \u201cA Decision Support Framework for Handling Schedule Perturbations,\u201d Transportation Research\u2014Part B: Methodology, 30, 405\u2013419 (1996).","journal-title":"Transportation Research\u2014Part B: Methodology"},{"key":"5592_CR40","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1287\/inte.33.1.5.12720","volume":"33","author":"G. Yu","year":"2003","unstructured":"Yu, G., M. Arguello, S. McCowan, M. Song, and A. White, \u201cA New Era for Crew Recovery at Continental Airlines,\u201d Interfaces, 33, 5\u201322 (2003).","journal-title":"Interfaces"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-006-5592-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-006-5592-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-006-5592-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:38Z","timestamp":1559468378000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-006-5592-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2006,2]]},"references-count":40,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2006,2]]}},"alternative-id":["5592"],"URL":"https:\/\/doi.org\/10.1007\/s10951-006-5592-7","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2006,2]]}}}