{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,21]],"date-time":"2026-05-21T09:52:53Z","timestamp":1779357173373,"version":"3.51.4"},"reference-count":18,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2007,10,20]],"date-time":"2007-10-20T00:00:00Z","timestamp":1192838400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2007,10,25]]},"DOI":"10.1007\/s10951-007-0041-9","type":"journal-article","created":{"date-parts":[[2007,10,19]],"date-time":"2007-10-19T09:15:52Z","timestamp":1192785352000},"page":"353-364","source":"Crossref","is-referenced-by-count":23,"title":["Batching and scheduling in a multi-machine flow shop"],"prefix":"10.1007","volume":"10","author":[{"given":"C. T.","family":"Ng","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mikhail Y.","family":"Kovalyov","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2007,10,20]]},"reference":[{"key":"41_CR1","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1080\/07408170490245487","volume":"36","author":"J. Bukchin","year":"2004","unstructured":"Bukchin, J., & Masin, M. (2004). Multi-objective lot splitting for a single product m-machine flow shop line. IIE Transactions, 36, 191\u2013202.","journal-title":"IIE Transactions"},{"key":"41_CR2","first-page":"953","volume":"34","author":"J. Bukchin","year":"2002","unstructured":"Bukchin, J., Tzur, M., & Jaffe, M. (2002). Lot splitting to minimize average flow-time in a two machine flow shop. IIE Transactions, 34, 953\u2013970.","journal-title":"IIE Transactions"},{"key":"41_CR3","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1002\/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO;2-#","volume":"47","author":"T. C. E. Cheng","year":"2000","unstructured":"Cheng, T. C. E., Lin, B. M. T., & Toker, A. (2000). Makespan minimization in the two-machine flowshop batch scheduling problem. Naval Research Logistics, 47, 128\u2013144.","journal-title":"Naval Research Logistics"},{"key":"41_CR4","doi-asserted-by":"crossref","unstructured":"Chin, H. N., & Chang, J. H. (2005, to appear). Cost models for lot streaming in a multistage flow shop, Omega.","DOI":"10.1016\/j.omega.2004.05.006"},{"key":"41_CR5","doi-asserted-by":"crossref","first-page":"120","DOI":"10.1287\/ijoc.13.2.120.10521","volume":"13","author":"C. A. Glass","year":"2001","unstructured":"Glass, C. A., Potts, C. N., & Strusevich, V. A. (2001). Scheduling batches with sequential job processing for two-machine flow and open shops. INFORMS Journal on Computing, 13, 120\u2013137.","journal-title":"INFORMS Journal on Computing"},{"key":"41_CR6","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/j.omega.2003.09.014","volume":"32","author":"F. Huq","year":"2004","unstructured":"Huq, F., Cutright, K., & Martin, C. (2004). Employee scheduling and makespan minimization in a flow shop with multiprocessor work stations: a case study. Omega, 32, 121\u2013129.","journal-title":"Omega"},{"key":"41_CR7","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S. M. Johnson","year":"1954","unstructured":"Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1, 61\u201368.","journal-title":"Naval Research Logistics Quarterly"},{"key":"41_CR8","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/S0925-5273(99)00115-2","volume":"66","author":"A. A. Kalir","year":"2000","unstructured":"Kalir, A. A., & Sarin, S. C. (2000). Evaluation of potential benefits of lot streaming in flow shop systems. International Journal of Production Economics, 66, 131\u2013142.","journal-title":"International Journal of Production Economics"},{"key":"41_CR9","doi-asserted-by":"crossref","first-page":"522","DOI":"10.1002\/nav.20013","volume":"51","author":"C.-L. Li","year":"2004","unstructured":"Li, C.-L., & Xiao, W.-Q. (2004). Lot streaming with supplier-manufacturer coordination. Naval Research Logistics, 51, 522\u2013542.","journal-title":"Naval Research Logistics"},{"key":"41_CR10","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1016\/j.ejor.2003.09.010","volume":"161","author":"G. Mosheiov","year":"2004","unstructured":"Mosheiov, G., & Oron, D. (2004). A note on flow-shop and job-shop batch scheduling with identical processing-time jobs. European Journal of Operational Research, 161, 285\u2013291.","journal-title":"European Journal of Operational Research"},{"key":"41_CR11","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1002\/nav.20028","volume":"51","author":"G. Mosheiov","year":"2004","unstructured":"Mosheiov, G., Oron, D., & Ritov, Y. (2004). Flow-shop batch scheduling with identical processing-time jobs. Naval Research Logistics, 51, 783\u2013799.","journal-title":"Naval Research Logistics"},{"key":"41_CR12","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C. N. Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: a review. European Journal of Operational Research, 120, 228\u2013249.","journal-title":"European Journal of Operational Research"},{"key":"41_CR13","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1057\/jors.1992.66","volume":"43","author":"C. N. Potts","year":"1992","unstructured":"Potts, C. N., & Van Wassenhove, L. N. (1992). Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society, 43, 395\u2013406.","journal-title":"Journal of the Operational Research Society"},{"key":"41_CR14","volume-title":"Scheduling theory. Group technologies","author":"V. S. Tanaev","year":"1998","unstructured":"Tanaev, V. S., Kovalyov, M. Y., & Shafransky, Y. M. (1998). Scheduling theory. Group technologies. Minsk: IEC NASB (in Russian)."},{"key":"41_CR15","volume-title":"Scheduling theory. One-stage systems","author":"V. S. Tanaev","year":"1994","unstructured":"Tanaev, V. S., Gordon, V. S., & Shafransky, Y. M. (1994). Scheduling theory. One-stage systems. Dordrect: Kluwer Academic."},{"key":"41_CR16","volume-title":"Scheduling theory. Multi-stage systems","author":"V. S. Tanaev","year":"1995","unstructured":"Tanaev, V. S., Sotskov, Y. N., & Strusevich, V. A. (1995). Scheduling theory. Multi-stage systems. Dordrecht: Kluwer Academic."},{"key":"41_CR17","doi-asserted-by":"crossref","first-page":"1065","DOI":"10.1287\/opre.41.6.1065","volume":"41","author":"D. Trietsch","year":"1993","unstructured":"Trietsch, D., & Baker, K. R. (1993). Basic techniques for lot streaming. Operations Research, 41, 1065\u20131076.","journal-title":"Operations Research"},{"key":"41_CR18","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"S. Webster","year":"1995","unstructured":"Webster, S., & Baker, K. R. (1995). Scheduling groups of jobs on a single machine. Operations Research, 43, 692\u2013703.","journal-title":"Operations Research"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-007-0041-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-007-0041-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-007-0041-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:40Z","timestamp":1559453980000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-007-0041-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,10,20]]},"references-count":18,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2007,10,25]]}},"alternative-id":["41"],"URL":"https:\/\/doi.org\/10.1007\/s10951-007-0041-9","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,10,20]]}}}