{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,3]],"date-time":"2026-07-03T06:10:07Z","timestamp":1783059007194,"version":"3.54.6"},"reference-count":40,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2007,11,27]],"date-time":"2007-11-27T00:00:00Z","timestamp":1196121600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2008,2]]},"DOI":"10.1007\/s10951-007-0049-1","type":"journal-article","created":{"date-parts":[[2007,11,26]],"date-time":"2007-11-26T14:12:21Z","timestamp":1196086341000},"page":"29-47","source":"Crossref","is-referenced-by-count":50,"title":["A multi-criteria approach for scheduling semiconductor wafer fabrication facilities"],"prefix":"10.1007","volume":"11","author":[{"given":"Michele E.","family":"Pfund","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hari","family":"Balasubramanian","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"John W.","family":"Fowler","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Scott J.","family":"Mason","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Oliver","family":"Rose","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"297","published-online":{"date-parts":[[2007,11,27]]},"reference":[{"key":"49_CR1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., Balas, E., & Zawack, D. (1988). The Shifting Bottleneck procedure for job shop scheduling. Management Science, 34, 391\u2013401.","journal-title":"Management Science"},{"key":"49_CR2","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1023\/A:1009750409895","volume":"1","author":"E. Balas","year":"1998","unstructured":"Balas, E., Lancia, G., Serafini, P., & Vazacopoulos, A. (1998). Job shop scheduling with deadlines. Journal of Combinatorial Optimization, 1, 329\u2013353.","journal-title":"Journal of Combinatorial Optimization"},{"issue":"1","key":"49_CR3","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1287\/mnsc.41.1.94","volume":"41","author":"E. Balas","year":"1995","unstructured":"Balas, E., Lenstra, J. K., & Vazacopoulos, A. (1995). The one-machine problem with delayed precedence constraints and its use in job shop scheduling. Management Science, 41(1), 94\u2013109.","journal-title":"Management Science"},{"issue":"2","key":"49_CR4","doi-asserted-by":"crossref","first-page":"262","DOI":"10.1287\/mnsc.44.2.262","volume":"44","author":"E. Balas","year":"1998","unstructured":"Balas, E., & Vazacopoulos, A. (1998). Guided local search with shifting bottleneck for job shop scheduling. Management Science, 44(2), 262\u2013275.","journal-title":"Management Science"},{"key":"49_CR5","first-page":"520","volume-title":"Proceedings of the 2nd multidisciplinary international conference on scheduling: theory and applications","author":"E. Balas","year":"2005","unstructured":"Balas, E., Simonetti, N., & Vazacopoulos, A. (2005). Job shop scheduling with set-up times, deadlines, and precedence constraints. In Proceedings of the 2nd multidisciplinary international conference on scheduling: theory and applications (pp. 520\u2013532). New York: MISTA."},{"key":"49_CR6","unstructured":"Balasubramanian, H., Fowler, J. W., & Pfund, M. E. (2006). Single machine bicriteria scheduling using the apparent tardiness cost heuristic. In Industrial engineering research conference, Orlando, FL, USA."},{"key":"49_CR7","unstructured":"Chen, Y., Fowler, J. W., Pfund, M. E., & Montgomery, D. C. (2007a). Methodologies for parameterization of composite dispatching rules ASUIE-ORPS-2007-019. Industrial Engineering, Arizona State University. http:\/\/ie.fulton.asu.edu\/research\/workingpaper\/wps.php"},{"key":"49_CR8","unstructured":"Chen, Y., Pfund, M. E., Montgomery, D. C., Fowler, J. W., & Callarman, T. E. (2007b). Robust scaling parameters for composite dispatching rules ASUIE-ORPS-2007-020. Industrial Engineering, Arizona State University. http:\/\/ie.fulton.asu.edu\/research\/workingpaper\/wps.php"},{"key":"49_CR9","doi-asserted-by":"crossref","first-page":"1087","DOI":"10.1016\/S0305-0548(02)00059-X","volume":"30","author":"J. K. Cochran","year":"2003","unstructured":"Cochran, J. K., Horng, S. M., & Fowler, J. W. (2003). A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers and Operations Research, 30, 1087\u20131102.","journal-title":"Computers and Operations Research"},{"key":"49_CR10","doi-asserted-by":"crossref","first-page":"939","DOI":"10.1080\/0020754021000030402","volume":"41","author":"R. Dabbas","year":"2003","unstructured":"Dabbas, R., Fowler, J., Rollier, D., & McCarville, D. (2003). Multiple response optimization using mixture-designed experiments and desirability functions in semiconductor scheduling. International Journal of Production Research, 41, 939\u2013961.","journal-title":"International Journal of Production Research"},{"key":"49_CR11","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1080\/00207549308956766","volume":"31","author":"S. Dauz\u00e8re-P\u00e9r\u00e8s","year":"1993","unstructured":"Dauz\u00e8re-P\u00e9r\u00e8s, S., & Lasserre, J. B. (1993). A modified Shifting Bottleneck procedure for the job shop scheduling. International Journal of Production Research, 31, 923\u2013932.","journal-title":"International Journal of Production Research"},{"key":"49_CR12","doi-asserted-by":"crossref","first-page":"214","DOI":"10.1080\/00224065.1980.11980968","volume":"12","author":"G. Derringer","year":"1980","unstructured":"Derringer, G., & Suich, R. (1980). Simultaneous optimization of several response variables. Journal of Quality Technology, 12, 214\u2013219.","journal-title":"Journal of Quality Technology"},{"key":"49_CR13","doi-asserted-by":"crossref","unstructured":"El Adl, M. K., Rodriguez, A. A., & Tsakalis, K. S. (1996). Hierarchical modeling and control of re-entrant semiconductor manufacturing facilities. In Proceedings of the 35th conference on decision and control, Kobe, Japan.","DOI":"10.1109\/CDC.1996.572810"},{"key":"49_CR14","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1080\/01969720290040759","volume":"33","author":"S. C. Esquivel","year":"2002","unstructured":"Esquivel, S. C., Ferrero, S. W., & Gallard, R. H. (2002). Parameter settings and representations in Pareto-based optimization for job shop scheduling. Cybernetics and Systems, 33, 559\u2013578.","journal-title":"Cybernetics and Systems"},{"key":"49_CR15","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/0360-8352(88)90075-7","volume":"15","author":"B. L. Foote","year":"1988","unstructured":"Foote, B. L., Ravindran, A., & Lashine, S. (1988). Computational feasibility of multi-criteria models of production, planning and scheduling. Computers and Industrial Engineering, 15, 129\u2013138.","journal-title":"Computers and Industrial Engineering"},{"key":"49_CR16","unstructured":"Fowler, J., & Pfund, M. (2001). State of the art scheduling survey results. Semiconductor Research Corporation Publication Number P003240"},{"key":"49_CR17","unstructured":"Fowler, J. W., Feigin, G., & Leachman, R. (1995). Semiconductor manufacturing Testbed: data sets. Arizona State University"},{"key":"49_CR18","unstructured":"Gadkari, A., Pfund, M. E., Fowler, J. W., & Chen, Y. Scheduling jobs on parallel machines with setup times and ready times, Computers and Industrial Engineering, to appear (2007)"},{"key":"49_CR19","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R. L. Graham","year":"1979","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"49_CR20","doi-asserted-by":"crossref","unstructured":"Hoogeveen, H. (2005). Multicriteria Scheduling, European Journal of Operational Research, 167(3).","DOI":"10.1016\/j.ejor.2004.07.011"},{"issue":"5","key":"49_CR21","doi-asserted-by":"crossref","first-page":"666","DOI":"10.1057\/jors.1996.78","volume":"47","author":"H. H. Holtsclaw","year":"1996","unstructured":"Holtsclaw, H. H., & Uzsoy, R. (1996). Machine criticality measures and subproblem solution procedures in shifting bottleneck methods: a computational study. Journal of the Operational Research Society, 47(5), 666\u2013677.","journal-title":"Journal of the Operational Research Society"},{"key":"49_CR22","doi-asserted-by":"crossref","unstructured":"Iima, H., Hara, T., Ichimi, N., & Sannomiya, N. (1999). Autonomous decentralized scheduling algorithm for a job-shop scheduling problem with complicated constraints. In Proceedings of the 1999 4th international symposium on autonomous decentralized systems (pp. 366-369), Tokyo, Japan.","DOI":"10.1109\/ISADS.1999.838461"},{"issue":"9","key":"49_CR23","doi-asserted-by":"crossref","first-page":"2215","DOI":"10.1080\/00207549308956854","volume":"31","author":"K. Itoh","year":"1993","unstructured":"Itoh, K., Huang, D., & Enkawa, T. (1993). Twofold look-ahead search for multi-criterion job shop scheduling. International Journal of Production Research, 31(9), 2215\u20132234.","journal-title":"International Journal of Production Research"},{"key":"49_CR24","doi-asserted-by":"crossref","first-page":"252","DOI":"10.1016\/0377-2217(95)00353-3","volume":"90","author":"Ph. Ivens","year":"1996","unstructured":"Ivens, Ph., & Lambrecht, M. (1996). Extending the Shifting Bottleneck procedure to real-life applications. European Journal of Operational Research, 90, 252\u2013268.","journal-title":"European Journal of Operational Research"},{"key":"49_CR25","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1016\/S0378-4754(02)00019-8","volume":"60","author":"I. Kacem","year":"2002","unstructured":"Kacem, I., Hammadi, S., & Borne, P. (2002). Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation, 60, 245\u2013276.","journal-title":"Mathematics and Computers in Simulation"},{"key":"49_CR26","volume-title":"Simulation modeling and analysis","author":"A. M. Law","year":"2000","unstructured":"Law, A. M., & Kelton, W. D. (2000). Simulation modeling and analysis. Boston: Mcgraw-Hill."},{"key":"49_CR27","doi-asserted-by":"crossref","unstructured":"Lee, Y. H., & Pinedo, M. Scheduling jobs in parallel machines with sequence dependent setup times, European Journal of Operational Research, 100, 464\u2013474","DOI":"10.1016\/S0377-2217(95)00376-2"},{"issue":"3","key":"49_CR28","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1002\/jos.102","volume":"5","author":"S. J. Mason","year":"2002","unstructured":"Mason, S. J., Fowler, J. W., & Carlyle, W. M. (2002). A modified Shifting Bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5(3), 247\u2013262.","journal-title":"Journal of Scheduling"},{"issue":"10","key":"49_CR29","doi-asserted-by":"crossref","first-page":"1943","DOI":"10.1080\/00207540412331331399","volume":"43","author":"S. J. Mason","year":"2005","unstructured":"Mason, S. J., Fowler, J. W., Carlyle, W. M., & Montgomery, D. C. (2005). Heuristics for minimizing total weighted tardiness in complex job shops. International Journal of Production Research, 43(10), 1943\u20131963.","journal-title":"International Journal of Production Research"},{"key":"49_CR30","volume-title":"Response surface methodology","author":"R. Myers","year":"1995","unstructured":"Myers, R., & Montgomery, D. (1995). Response surface methodology. New York: Wiley."},{"key":"49_CR31","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/0377-2217(93)E0140-S","volume":"81","author":"A. Nagar","year":"1995","unstructured":"Nagar, A., Haddock, J., & Heragu, S. (1995). Multiple and bicriteria scheduling: a literature survey. European Journal of Operational Research, 81, 88\u2013104.","journal-title":"European Journal of Operational Research"},{"key":"49_CR32","unstructured":"Neacy, E., Brown, S., & McKiddie, R. Measurement and improvement of manufacturing capacity (MIMAC) survey and interview results. SEMATECH Technology Transfer #94052374A-XFR (1994)"},{"key":"49_CR33","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1142\/S0960313192000157","volume":"2","author":"I. M. Ovacik","year":"1992","unstructured":"Ovacik, I. M., & Uzsoy, R. (1992). A Shifting Bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronic Manufacturing, 2, 119\u2013134.","journal-title":"Journal of Electronic Manufacturing"},{"key":"49_CR34","volume-title":"Operations scheduling with applications in manufacturing and services","author":"M. L. Pinedo","year":"1999","unstructured":"Pinedo, M. L., & Chao, X. (1999). Operations scheduling with applications in manufacturing and services. New York: Irwin\/McGraw-Hill."},{"key":"49_CR35","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1002\/(SICI)1520-6750(199902)46:1<1::AID-NAV1>3.0.CO;2-#","volume":"46","author":"M. L. Pinedo","year":"1999","unstructured":"Pinedo, M. L., & Singer, M. (1999). A Shifting Bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Naval Research Logistics, 46, 1\u201317.","journal-title":"Naval Research Logistics"},{"key":"49_CR36","unstructured":"Rose, O., M\u00f6nch, L., & Sturm, R. (2002). Testing, comparison and implementation issues. In Proceedings of the 12th international conference on flexible automation and intelligent manufacturing, Dresden, Germany."},{"key":"49_CR37","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1023\/A:1018955929512","volume":"83","author":"M. Schutten","year":"1998","unstructured":"Schutten, M. (1998). Practical job shop scheduling. Annals of Operational Research, 83, 161\u2013177.","journal-title":"Annals of Operational Research"},{"key":"49_CR38","unstructured":"Semiconductor Industry Association (SIA) (2005). The international technology roadmap for semiconductors. http:\/\/public.itrs.net\/ ."},{"key":"49_CR39","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/S0305-0548(99)00098-2","volume":"28","author":"M. Singer","year":"2001","unstructured":"Singer, M. (2001). Decomposition methods for large job shops. Computers and Operation Research, 28, 193\u2013207.","journal-title":"Computers and Operation Research"},{"key":"49_CR40","volume-title":"Multicriteria scheduling: theory, models and algorithms","author":"V. T. T\u2019kindt","year":"2006","unstructured":"T\u2019kindt, V. T., & Billaut, J.-C. (2006). Multicriteria scheduling: theory, models and algorithms (2nd ed.). Berlin: Springer.","edition":"2"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-007-0049-1.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-007-0049-1\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-007-0049-1","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:40Z","timestamp":1559468380000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-007-0049-1"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,11,27]]},"references-count":40,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2008,2]]}},"alternative-id":["49"],"URL":"https:\/\/doi.org\/10.1007\/s10951-007-0049-1","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,11,27]]}}}