{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,4]],"date-time":"2026-03-04T08:11:55Z","timestamp":1772611915236,"version":"3.50.1"},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2008,6,4]],"date-time":"2008-06-04T00:00:00Z","timestamp":1212537600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2008,12]]},"DOI":"10.1007\/s10951-008-0071-y","type":"journal-article","created":{"date-parts":[[2008,6,3]],"date-time":"2008-06-03T16:03:55Z","timestamp":1212509035000},"page":"421-432","source":"Crossref","is-referenced-by-count":4,"title":["Makespan distribution of permutation flowshop schedules"],"prefix":"10.1007","volume":"11","author":[{"given":"Feng","family":"Jin","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jatinder N. D.","family":"Gupta","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shi-ji","family":"Song","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Cheng","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2008,6,4]]},"reference":[{"key":"71_CR1","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-642-80693-3","volume-title":"Sequencing theory","author":"S. Ashour","year":"1972","unstructured":"Ashour, S. (1972). Sequencing theory. New York: Springer."},{"issue":"1\u20134","key":"71_CR2","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1016\/0360-8352(89)90087-9","volume":"17","author":"M. A. Azim","year":"1989","unstructured":"Azim, M. A., Moras, R. G., & Smith, M. L. (1989). Antithetic sequences in flow shop scheduling. Computers and Industrial Engineering, 17(1\u20134), 353\u2013358.","journal-title":"Computers and Industrial Engineering"},{"issue":"3","key":"71_CR3","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1108\/01443579510080553","volume":"15","author":"J. Caffrey","year":"1995","unstructured":"Caffrey, J., & Hitchings, G. (1995). Makespan distributions in flow shop scheduling. International Journal of Operations and Production Management, 15(3), 50\u201358.","journal-title":"International Journal of Operations and Production Management"},{"key":"71_CR4","volume-title":"Theory of scheduling","author":"R. W. Conway","year":"1967","unstructured":"Conway, R. W., Maxwell, W. L., & Miller, L. W. (1967). Theory of scheduling. New York: Wiley."},{"issue":"3","key":"71_CR5","doi-asserted-by":"crossref","first-page":"397","DOI":"10.1090\/S0002-9947-1954-0063603-9","volume":"76","author":"K. L. Chung","year":"1954","unstructured":"Chung, K. L. (1954). Contributions to the theory of Markov chains, II. Transactions of the American Mathematical Society, 76(3), 397\u2013419.","journal-title":"Transactions of the American Mathematical Society"},{"key":"71_CR6","doi-asserted-by":"crossref","first-page":"1273","DOI":"10.1287\/mnsc.23.12.1273","volume":"23","author":"D. G. Dennenbring","year":"1977","unstructured":"Dennenbring, D. G. (1977). Procedures for estimating optimal solution value for large combinatorial problems. Management Science, 23, 1273\u20131283.","journal-title":"Management Science"},{"key":"71_CR7","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1002\/nav.3800150207","volume":"15","author":"S. E. Elmaghraby","year":"1968","unstructured":"Elmaghraby, S. E. (1968). The machine sequencing problem\u2014review and extensions. Naval Research Logistics Quarterly, 15, 205\u2013232.","journal-title":"Naval Research Logistics Quarterly"},{"key":"71_CR8","doi-asserted-by":"crossref","first-page":"1243","DOI":"10.1057\/palgrave.jors.2601784","volume":"55","author":"J. Framinan","year":"2004","unstructured":"Framinan, J., Gupta, J. N. D., & Leisten, R. (2004). A review and classification of heuristics for the permutation flowshop with makespan objective. Journal of Operational Research Society, 55, 1243\u20131255.","journal-title":"Journal of Operational Research Society"},{"key":"71_CR9","volume-title":"Computers and intractability: a\u00a0guide to the theory of NP-completeness","author":"M. R. Garey","year":"1979","unstructured":"Garey, M. R., & Johnson, D. S. (1979). Computers and intractability: a\u00a0guide to the theory of NP-completeness. San Francisco: Freeman."},{"key":"71_CR10","volume-title":"Industrial scheduling","author":"B. Giffler","year":"1963","unstructured":"Giffler, B., Thompson, G. L., & Van\u00a0Ness, V. (1963). Numerical experience with linear and Monte Carlo algorithms for solving scheduling problems. In J. F. Muth & G. L. Thompson (Eds.), Industrial scheduling. Englewood Cliffs: Prentice Hall."},{"key":"71_CR11","first-page":"363","volume-title":"Disaggregation problems in manufacturing and service organizations","author":"J. N. D. Gupta","year":"1979","unstructured":"Gupta, J. N. D. (1979). A\u00a0review of flowshop scheduling research. In L. P. Ritzman, L. J. Krajewski, W. L. Berry, S. M. Goodman, S.\u00a0T.\u00a0Hardy, & L.\u00a0D.\u00a0Vitt (Eds.), Disaggregation problems in manufacturing and service organizations (pp. 363\u2013388). The Hague: Nijhoff."},{"key":"71_CR12","doi-asserted-by":"crossref","first-page":"699","DOI":"10.1016\/j.ejor.2005.02.001","volume":"169","author":"J. N. D. Gupta","year":"2006","unstructured":"Gupta, J. N. D., & Stafford, E. F. (2006). Flowshop scheduling research after five decades. European Journal of Operational Research, 169, 699\u2013711.","journal-title":"European Journal of Operational Research"},{"key":"71_CR13","unstructured":"Gupta, J. N. D., Smith, M. L., Martz, H. F., & Dudek, R. A. (1968). Monte Carlo experimentation with flowshop scheduling problem (Sequencing Research Report # QT-103-68). Department of Industrial Engineering, Texas Technological College, Lubbock, TX."},{"issue":"14","key":"71_CR14","doi-asserted-by":"crossref","first-page":"2895","DOI":"10.1080\/0020754050056417","volume":"43","author":"S. R. Hejazi","year":"2005","unstructured":"Hejazi, S. R., & Saghafian, S. (2005). Flowshop scheduling problems with makespan criterion: a review. International Journal of Production Research, 43(14), 2895\u20132929.","journal-title":"International Journal of Production Research"},{"key":"71_CR15","unstructured":"Heller, J. (1959). Combinatorial, probabilistic, and statistical aspects of an MxJ scheduling problem (AEC Research and Development Report # NYO-2540). Institute of Mathematical Sciences, New York University, New York, NY."},{"issue":"2","key":"71_CR16","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1287\/opre.8.2.178","volume":"8","author":"J. Heller","year":"1960","unstructured":"Heller, J. (1960). Some numerical experiments for MxJ flow shop and its decision-theoretical aspects. Operations Research, 8(2), 178\u2013184.","journal-title":"Operations Research"},{"key":"71_CR17","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","volume":"1","author":"S. M. Johnson","year":"1954","unstructured":"Johnson, S. M. (1954). Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1, 61\u201368.","journal-title":"Naval Research Logistics Quarterly"},{"issue":"8","key":"71_CR18","doi-asserted-by":"crossref","first-page":"780","DOI":"10.1080\/095372897234678","volume":"18","author":"R. G. Moras","year":"1997","unstructured":"Moras, R. G., Smith, M. L., Kumar, K. S., & Azim, M. A. (1997). Analysis of antithetic sequences in flow shop scheduling to minimize makespan. Production Planning and Control, 18(8), 780\u2013787.","journal-title":"Production Planning and Control"},{"issue":"1","key":"71_CR19","doi-asserted-by":"crossref","first-page":"160","DOI":"10.1016\/0377-2217(95)00037-2","volume":"91","author":"E. Nowicki","year":"1996","unstructured":"Nowicki, E., & Smutnicki, C. (1996). A fast tabu search algorithm for the permutation flow-shop problem. European Journal of Operational Research, 91(1), 160\u2013175.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"71_CR20","doi-asserted-by":"crossref","first-page":"654","DOI":"10.1016\/j.ejor.2004.08.021","volume":"169","author":"E. Nowicki","year":"2006","unstructured":"Nowicki, E., & Smutnicki, C. (2006). Some aspects of scatter search in the flow-shop problem. European Journal of Operational Research, 169(2), 654\u2013666.","journal-title":"European Journal of Operational Research"},{"key":"71_CR21","unstructured":"Nugent, C. E. (1964). On sampling approaches to the solution of n- by-m static sequencing problem. PhD dissertation, Cornell University, Ithaca, NY."},{"issue":"4","key":"71_CR22","first-page":"215","volume":"18","author":"S. S. Panwalker","year":"1981","unstructured":"Panwalker, S. S., & Charles, O. E. (1981). Analysis of the left tail for the makespan distribution in flowshop problems. Opsearch, Journal of Operational Research Society of India, 18(4), 215\u2013220.","journal-title":"Opsearch, Journal of Operational Research Society of India"},{"key":"71_CR23","unstructured":"Pulle, C. V. (1976). An analysis of inter-relationship of multiple criteria in a flowshop with set-up sequence dependence. PhD dissertation, Texas Tech University, Lubbock, TX."},{"key":"71_CR24","volume-title":"Machine scheduling problems: classification, complexity and computations","author":"A. H. G. Rinnooy Kan","year":"1977","unstructured":"Rinnooy Kan, A. H. G. (1977). Machine scheduling problems: classification, complexity and computations. The Hague: Nijhoff."},{"issue":"1","key":"71_CR25","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1016\/0377-2217(90)90090-X","volume":"47","author":"E. Taillard","year":"1990","unstructured":"Taillard, E. (1990). Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research, 47(1), 65\u201374.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"71_CR26","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1016\/0377-2217(93)90182-M","volume":"64","author":"E. Taillard","year":"1993","unstructured":"Taillard, E. (1993). Benchmarks for basic scheduling problems. European Journal of Operational Research, 64(2), 278\u2013285.","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"71_CR27","doi-asserted-by":"crossref","first-page":"98","DOI":"10.1287\/ijoc.14.2.98.120","volume":"14","author":"J. P. Watson","year":"2002","unstructured":"Watson, J. P., Barbulescu, L., Whitley, L. D., & Howe, A. E. (2002). Contrasting structured and random permutation flow-shop scheduling problems: search-space topology and algorithm performance. INFORMS Journal on Computing, 14(2), 98\u2013123.","journal-title":"INFORMS Journal on Computing"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-008-0071-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-008-0071-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-008-0071-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:41Z","timestamp":1559468381000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-008-0071-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,6,4]]},"references-count":27,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2008,12]]}},"alternative-id":["71"],"URL":"https:\/\/doi.org\/10.1007\/s10951-008-0071-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2008,6,4]]}}}