{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,25]],"date-time":"2025-09-25T22:53:52Z","timestamp":1758840832466},"reference-count":31,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2009,3,19]],"date-time":"2009-03-19T00:00:00Z","timestamp":1237420800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2009,12]]},"DOI":"10.1007\/s10951-009-0107-y","type":"journal-article","created":{"date-parts":[[2009,3,18]],"date-time":"2009-03-18T16:10:36Z","timestamp":1237392636000},"page":"595-606","source":"Crossref","is-referenced-by-count":9,"title":["A cyclic approach to large-scale short-term planning in chemical batch production"],"prefix":"10.1007","volume":"12","author":[{"given":"Norbert","family":"Trautmann","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Christoph","family":"Schwindt","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2009,3,19]]},"reference":[{"key":"107_CR1","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1002\/jos.91","volume":"5","author":"J. C. Beck","year":"2002","unstructured":"Beck, J. C. (2002). Heuristics for scheduling with inventory: dynamic focus via constraint criticality. Journal of Scheduling, 5, 43\u201369.","journal-title":"Journal of Scheduling"},{"key":"107_CR2","doi-asserted-by":"crossref","first-page":"1029","DOI":"10.1080\/002075400189004","volume":"38","author":"F. Bl\u00f6mer","year":"2000","unstructured":"Bl\u00f6mer, F., & G\u00fcnther, H. O. (2000). LP-based heuristics for scheduling chemical batch processes. International Journal of Production Research, 38, 1029\u20131051.","journal-title":"International Journal of Production Research"},{"key":"107_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24804-0","volume-title":"Scheduling algorithms","author":"P. Brucker","year":"2004","unstructured":"Brucker, P. (2004). Scheduling algorithms. Berlin: Springer."},{"key":"107_CR4","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1023\/A:1018959704264","volume":"96","author":"P. Brucker","year":"2000","unstructured":"Brucker, P., & Hurink, J. (2000). Solving a chemical batch scheduling problem by local search. Annals of Operations Research, 96, 17\u201336.","journal-title":"Annals of Operations Research"},{"key":"107_CR5","doi-asserted-by":"crossref","first-page":"1752","DOI":"10.1016\/j.compchemeng.2005.02.037","volume":"29","author":"R. E. Burkard","year":"2005","unstructured":"Burkard, R. E., & Hatzl, J. (2005). Review, extensions and computational comparison of MILP formulations for scheduling of batch processes. Computers & Chemical Engineering, 29, 1752\u20131769.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR6","doi-asserted-by":"crossref","first-page":"2059","DOI":"10.1021\/ie000683r","volume":"40","author":"P. Castro","year":"2001","unstructured":"Castro, P., Barbosa-P\u00f3voa, A. P., & Matos, H. (2001). An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Industrial & Engineering Chemistry Research, 40, 2059\u20132068.","journal-title":"Industrial & Engineering Chemistry Research"},{"key":"107_CR7","doi-asserted-by":"crossref","first-page":"3346","DOI":"10.1021\/ie0203781","volume":"42","author":"P. Castro","year":"2003","unstructured":"Castro, P., Barbosa-P\u00f3voa, A. P., & Matos, H. (2003). Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations: a case study approach. Industrial & Engineering Chemistry Research, 42, 3346\u20133360.","journal-title":"Industrial & Engineering Chemistry Research"},{"key":"107_CR8","doi-asserted-by":"crossref","first-page":"2109","DOI":"10.1016\/j.compchemeng.2004.05.002","volume":"28","author":"C. A. Floudas","year":"2004","unstructured":"Floudas, C. A., & Lin, X. (2004). Continuous-time versus discrete-time approaches for scheduling of chemical processes: a\u00a0review. Computers & Chemical Engineering, 28, 2109\u20132129.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR9","volume-title":"Dekompositionsverfahren f\u00fcr die ressourcenbeschr\u00e4nkte Projektplanung","author":"K. Gentner","year":"2005","unstructured":"Gentner, K. (2005). Dekompositionsverfahren f\u00fcr die ressourcenbeschr\u00e4nkte Projektplanung. Aachen: Shaker."},{"key":"107_CR10","volume-title":"Handbook of scheduling: algorithms, models, and performance analysis (Chap.\u00a048)","author":"K. Gentner","year":"2004","unstructured":"Gentner, K., Neumann, K., Schwindt, C., & Trautmann, N. (2004). Batch production scheduling in the process industries. In J. Y. T. Leung (Ed.), Handbook of scheduling: algorithms, models, and performance analysis (Chap.\u00a048). Boca Raton: CRC Press."},{"key":"107_CR11","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1007\/s00291-002-0098-y","volume":"24","author":"M. Grunow","year":"2002","unstructured":"Grunow, M., G\u00fcnther, H. O., & Lehmann, M. (2002). Campaign planning for multi-stage batch processes in the chemical industry. OR Spectrum, 24, 281\u2013314.","journal-title":"OR Spectrum"},{"key":"107_CR12","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1016\/S0098-1354(00)00468-3","volume":"24","author":"S. J. Honkomp","year":"2000","unstructured":"Honkomp, S. J., Lombardo, S., Rosen, O., & Pekny, J. F. (2000). The curse of reality: why process scheduling optimization problems are difficult in practice. Computers & Chemical Engineering, 24, 323\u2013328.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR13","doi-asserted-by":"crossref","first-page":"4341","DOI":"10.1021\/ie970927g","volume":"37","author":"M. G. Ierapetritou","year":"1998","unstructured":"Ierapetritou, M. G., & Floudas, C. A. (1998). Effective continuous-time formulation for short-term scheduling, 1: multipurpose batch processes. Industrial & Engineering Chemistry Research, 37, 4341\u20134359.","journal-title":"Industrial & Engineering Chemistry Research"},{"key":"107_CR14","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1007\/s00291-002-0101-7","volume":"24","author":"J. Kallrath","year":"2002","unstructured":"Kallrath, J. (2002). Planning and scheduling in the process industry. OR Spectrum, 24, 219\u2013250.","journal-title":"OR Spectrum"},{"key":"107_CR15","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/0098-1354(93)80015-F","volume":"17","author":"E. Kondili","year":"1993","unstructured":"Kondili, E., Pantelides, C. C., & Sargent, R. W. H. (1993). A general algorithm for short-term scheduling of batch operations, I: MILP formulation. Computers & Chemical Engineering, 17, 211\u2013227.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR16","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/S0004-3702(02)00362-4","volume":"143","author":"P. Laborie","year":"2003","unstructured":"Laborie, P. (2003). Algorithms for propagating resource constraints in AI planning and scheduling: existing approaches and new results. Artificial Intelligence, 143, 151\u2013188.","journal-title":"Artificial Intelligence"},{"key":"107_CR17","doi-asserted-by":"crossref","first-page":"1921","DOI":"10.1016\/j.compchemeng.2004.03.016","volume":"28","author":"C. T. Maravelias","year":"2004","unstructured":"Maravelias, C. T., & Grossmann, I. E. (2004). A hybrid MILP\/CP decomposition approach for the continuous time scheduling of multipurpose batch plants. Computers & Chemical Engineering, 28, 1921\u20131949.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR18","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1016\/0895-7177(94)90210-0","volume":"20","author":"S. T. McCormick","year":"1994","unstructured":"McCormick, S. T., & Rao, U. S. (1994). Some complexity results in cyclic scheduling. Mathematical and Computer Modelling, 20, 107\u2013122.","journal-title":"Mathematical and Computer Modelling"},{"key":"107_CR19","doi-asserted-by":"crossref","first-page":"913","DOI":"10.1016\/j.compchemeng.2006.02.008","volume":"30","author":"C. A. M\u00e9ndez","year":"2006","unstructured":"M\u00e9ndez, C. A., Cerd\u00e1, J., Grossmann, I. E., Harjunkoski, I., & Fahl, M. (2006). State-of-the-art review of optimization methods for short-term scheduling of batch processes. Computers & Chemical Engineering, 30, 913\u2013946.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR20","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1007\/s001860200251","volume":"56","author":"K. Neumann","year":"2002","unstructured":"Neumann, K., & Schwindt, C. (2002). Project scheduling with inventory constraints. Mathematical Methods of Operations Research, 56, 513\u2013533.","journal-title":"Mathematical Methods of Operations Research"},{"key":"107_CR21","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1007\/s00291-002-0100-8","volume":"24","author":"K. Neumann","year":"2002","unstructured":"Neumann, K., Schwindt, C., & Trautmann, N. (2002). Advanced production scheduling for batch plants in process industries. OR Spectrum, 24, 251\u2013279.","journal-title":"OR Spectrum"},{"key":"107_CR22","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project scheduling with time windows and scarce resources","author":"K. Neumann","year":"2003","unstructured":"Neumann, K., Schwindt, C., & Zimmermann, J. (2003). Project scheduling with time windows and scarce resources. Berlin: Springer."},{"key":"107_CR23","volume-title":"Scheduling: theory, algorithms, and systems","author":"M. Pinedo","year":"2002","unstructured":"Pinedo, M. (2002). Scheduling: theory, algorithms, and systems. Upper Saddle River: Prentice Hall."},{"key":"107_CR24","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C. N. Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: a review. European Journal of Operational Research, 120, 228\u2013249.","journal-title":"European Journal of Operational Research"},{"key":"107_CR25","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1007\/978-3-642-17022-5_15","volume-title":"Operations research proceedings 2003","author":"C. Schwindt","year":"2004","unstructured":"Schwindt, C., & Trautmann, N. (2004). A priority-rule based method for batch production scheduling in the process industries. In D. Ahr, R. Fahrion, M. Oswald, & G. Reinelt (Eds.), Operations research proceedings 2003 (pp.\u00a0111\u2013118). Berlin: Springer."},{"key":"107_CR26","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1007\/978-3-8350-9064-4_13","volume-title":"Perspectives on operations research","author":"C. Schwindt","year":"2006","unstructured":"Schwindt, C., & Trautmann, N. (2006). A cyclic approach to large-scale short-term planning of multi-purpose batch plants. In M.\u00a0Morlock, C.\u00a0Schwindt, N. Trautmann, & J. Zimmermann (Eds.), Perspectives on operations research (pp.\u00a0225\u2013238). Wiesbaden: Deutscher Universit\u00e4ts-Verlag."},{"key":"107_CR27","doi-asserted-by":"crossref","unstructured":"Schwindt, C., Fink, R., & Trautmann, N. (2007). A priority-rule based method for scheduling in chemical batch production. In Proceedings of the international conference on industrial engineering and engineering management (pp.\u00a01347\u20131351), Singapore.","DOI":"10.1109\/IEEM.2007.4419412"},{"key":"107_CR28","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/0098-1354(93)80016-G","volume":"17","author":"N. Shah","year":"1993","unstructured":"Shah, N., Pantelides, C. C., & Sargent, R. W. H. (1993a). A general algorithm for short-term scheduling of batch operations, II: computational issues. Computers & Chemical Engineering, 17, 229\u2013244.","journal-title":"Computers & Chemical Engineering"},{"key":"107_CR29","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1007\/BF02023176","volume":"42","author":"N. Shah","year":"1993","unstructured":"Shah, N., Pantelides, C. C., & Sargent, R. W. H. (1993b). Optimal periodic scheduling of multipurpose batch plants. Annals of Operations Research, 42, 193\u2013228.","journal-title":"Annals of Operations Research"},{"key":"107_CR30","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1016\/S0377-2217(99)00301-X","volume":"126","author":"C. H. Timpe","year":"2000","unstructured":"Timpe, C. H., & Kallrath, J. (2000). Optimal planning in large multi-site production networks. European Journal of Operational Research, 126, 422\u2013435.","journal-title":"European Journal of Operational Research"},{"key":"107_CR31","doi-asserted-by":"crossref","first-page":"2271","DOI":"10.1016\/j.compchemeng.2004.04.002","volume":"28","author":"D. Wu","year":"2004","unstructured":"Wu, D., & Ierapetitrou, M. (2004). Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation. Computers & Chemical Engineering, 28, 2271\u20132286.","journal-title":"Computers & Chemical Engineering"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-009-0107-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-009-0107-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-009-0107-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:42Z","timestamp":1559453982000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-009-0107-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,3,19]]},"references-count":31,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2009,12]]}},"alternative-id":["107"],"URL":"https:\/\/doi.org\/10.1007\/s10951-009-0107-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,3,19]]}}}