{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,15]],"date-time":"2026-03-15T03:25:07Z","timestamp":1773545107092,"version":"3.50.1"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2010,11,24]],"date-time":"2010-11-24T00:00:00Z","timestamp":1290556800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1007\/s10951-010-0207-8","type":"journal-article","created":{"date-parts":[[2010,11,23]],"date-time":"2010-11-23T18:25:09Z","timestamp":1290536709000},"page":"557-569","source":"Crossref","is-referenced-by-count":36,"title":["Exact methods for the resource levelling problem"],"prefix":"10.1007","volume":"14","author":[{"given":"Thorsten","family":"Gather","sequence":"first","affiliation":[]},{"given":"J\u00fcrgen","family":"Zimmermann","sequence":"additional","affiliation":[]},{"given":"Jan-Hendrik","family":"Bartels","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2010,11,24]]},"reference":[{"key":"207_CR1","volume-title":"Construction performance control by networks","author":"H. Ahuja","year":"1976","unstructured":"Ahuja, H. (1976). Construction performance control by networks. New York: John Wiley and Sons."},{"key":"207_CR2","volume-title":"Network flows","author":"R. Ahuja","year":"1993","unstructured":"Ahuja, R., Magnanti, T., & Orlin, J. (1993). Network flows. Englewood Cliffs: Prentice Hall."},{"key":"207_CR3","first-page":"50","volume":"4","author":"F. Ballestin","year":"2007","unstructured":"Ballestin, F., Schwindt, C., & Zimmermann, J. (2007). Resource leveling in make-to-order production: modeling and heuristic solution method. International Journal of Operations Research, 4, 50\u201362.","journal-title":"International Journal of Operations Research"},{"key":"207_CR4","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1016\/0377-2217(94)90380-8","volume":"78","author":"M. Bandelloni","year":"1994","unstructured":"Bandelloni, M., Tucci, M., & Rinaldi, R. (1994). Optimal resource leveling using non-serial dynamic programming. European Journal of Operations Research, 78, 162\u2013178.","journal-title":"European Journal of Operations Research"},{"issue":"2","key":"207_CR5","first-page":"76","volume":"13","author":"A. Burgess","year":"1962","unstructured":"Burgess, A., & Killebrew, J. (1962). Variation in activity level on a cyclical arrow diagram. Journal of Industrial Engineering, 13(2), 76\u201383.","journal-title":"Journal of Industrial Engineering"},{"issue":"2","key":"207_CR6","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1061\/(ASCE)0733-9364(1989)115:2(302)","volume":"115","author":"S. Easa","year":"1989","unstructured":"Easa, S. (1989). Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), 302\u2013316.","journal-title":"Journal of Construction Engineering and Management"},{"key":"207_CR7","unstructured":"Engelhardt, H., & Zimmermann, J. (1998). Lower bounds and exact methods for resource levelling problems. Report WIOR 517, University of Karlsruhe."},{"key":"207_CR8","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1007\/PL00013356","volume":"23","author":"B. Franck","year":"2001","unstructured":"Franck, B., Neumann, K., & Schwindt, C. (2001). Truncated branch-and-bound, schedule construction, and schedule improvement procedures for resource-constrained project scheduling. OR Spektrum, 23, 297\u2013324.","journal-title":"OR Spektrum"},{"key":"207_CR9","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1137\/0207024","volume":"7","author":"H. Gabow","year":"1978","unstructured":"Gabow, H., & Myers, E. (1978). Finding all spanning trees of directed and undirected graphs. SIAM Journal on Computing, 7, 280\u2013287.","journal-title":"SIAM Journal on Computing"},{"issue":"1","key":"207_CR10","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1061\/JCCEAZ.0000122","volume":"91","author":"R. Galbreath","year":"1965","unstructured":"Galbreath, R. (1965). Computer program for leveling resource usage. Journal of the Construction Division, 91(1), 107\u2013124.","journal-title":"Journal of the Construction Division"},{"key":"207_CR11","volume-title":"Precedence and arrow networks for construction","author":"R. Harris","year":"1978","unstructured":"Harris, R. (1978). Precedence and arrow networks for construction. New York: John Wiley and Sons."},{"key":"207_CR12","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1061\/(ASCE)0733-9364(1990)116:2(199)","volume":"116","author":"R. Harris","year":"1990","unstructured":"Harris, R. (1990). Packing method for resource leveling (pack). Journal of Construction Engineering and Management, 116, 39\u201343.","journal-title":"Journal of Construction Engineering and Management"},{"key":"207_CR13","volume-title":"Project scheduling: recent models, algorithms and applications","author":"R. Kolisch","year":"1999","unstructured":"Kolisch, R., Schwindt, C., & Sprecher, A. (1999). Benchmark instances for project scheduling problems. In J. W\u0119glarz (Ed.), Project scheduling: recent models, algorithms and applications. Boston: Kluwer Academic."},{"key":"207_CR14","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1016\/S0377-2217(99)00498-1","volume":"127","author":"K. Neumann","year":"2000","unstructured":"Neumann, K., & Zimmermann, J. (2000). Procedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operations Research, 127, 425\u2013443.","journal-title":"European Journal of Operations Research"},{"key":"207_CR15","doi-asserted-by":"crossref","first-page":"441","DOI":"10.1007\/s001860000092","volume":"52","author":"K. Neumann","year":"2000","unstructured":"Neumann, K., N\u00fcbel, H., & Schwindt, C. (2000). Active and stable project scheduling. Mathematical Methods of Operations Research, 52, 441\u2013465.","journal-title":"Mathematical Methods of Operations Research"},{"key":"207_CR16","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24800-2","volume-title":"Project scheduling with time windows and scarce resources","author":"K. Neumann","year":"2003","unstructured":"Neumann, K., Schwindt, C., & Zimmermann, J. (2003). Project scheduling with time windows and scarce resources. Berlin: Springer."},{"key":"207_CR17","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-663-08764-9","volume-title":"Minimierung der Ressourcenkosten f\u00fcr Projekte mit planungsabh\u00e4ngigen Zeitfenstern","author":"H. N\u00fcbel","year":"1999","unstructured":"N\u00fcbel, H. (1999). Minimierung der Ressourcenkosten f\u00fcr Projekte mit planungsabh\u00e4ngigen Zeitfenstern. Wiesbaden: Gabler."},{"key":"207_CR18","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1007\/PL00013357","volume":"23","author":"H. N\u00fcbel","year":"2001","unstructured":"N\u00fcbel, H. (2001). The resource renting problem subject to temporal constraints. OR Spektrum, 23, 359\u2013381.","journal-title":"OR Spektrum"},{"key":"207_CR19","first-page":"268","volume-title":"Project planning by network analysis: proceedings of the 2nd international congress","author":"R. Petrovic","year":"1969","unstructured":"Petrovic, R. (1969). On optimization of resource leveling in project plans. In H. J. Lombaers (Ed.), Project planning by network analysis: proceedings of the 2nd international congress (pp.\u00a0268\u2013273). Amsterdam: North-Holland."},{"key":"207_CR20","volume-title":"Les problemes d ordonnancement","author":"B. Roy","year":"1964","unstructured":"Roy, B. (1964). Les problemes d ordonnancement. Paris: Dunod."},{"key":"207_CR21","volume-title":"A management guide to PERT\/CPM","author":"J. Wiest","year":"1977","unstructured":"Wiest, J., & Levy, F. (1977). A management guide to PERT\/CPM. Englewood Cliffs: Prentice Hall."},{"key":"207_CR22","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-322-81390-9","volume-title":"Ablauforientiertes Projektmanagement: Modelle, Verfahren und Anwendungen","author":"J. Zimmermann","year":"2001","unstructured":"Zimmermann, J. (2001). Ablauforientiertes Projektmanagement: Modelle, Verfahren und Anwendungen. Wiesbaden: Gabler."}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-010-0207-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-010-0207-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-010-0207-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,11,14]],"date-time":"2021-11-14T00:48:35Z","timestamp":1636850915000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-010-0207-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,11,24]]},"references-count":22,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2011,12]]}},"alternative-id":["207"],"URL":"https:\/\/doi.org\/10.1007\/s10951-010-0207-8","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,11,24]]}}}