{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,9]],"date-time":"2024-06-09T10:09:24Z","timestamp":1717927764966},"reference-count":16,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2010,12,29]],"date-time":"2010-12-29T00:00:00Z","timestamp":1293580800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2012,4]]},"DOI":"10.1007\/s10951-010-0215-8","type":"journal-article","created":{"date-parts":[[2010,12,28]],"date-time":"2010-12-28T17:10:37Z","timestamp":1293556237000},"page":"165-179","source":"Crossref","is-referenced-by-count":14,"title":["Single-machine scheduling with advanced process control constraints"],"prefix":"10.1007","volume":"15","author":[{"given":"Yiwei","family":"Cai","sequence":"first","affiliation":[]},{"given":"Erhan","family":"Kutanoglu","sequence":"additional","affiliation":[]},{"given":"John","family":"Hasenbein","sequence":"additional","affiliation":[]},{"given":"Joe","family":"Qin","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2010,12,29]]},"reference":[{"issue":"1","key":"215_CR1","doi-asserted-by":"crossref","first-page":"78","DOI":"10.1109\/TSM.2005.863211","volume":"9","author":"R. P. Good","year":"2006","unstructured":"Good, R. P., & Qin, S. J. (2006). On the stability of MIMO EWMA run-to-run controllers with metrology delay. IEEE Transactions on Semiconductor Manufacturing, 9(1), 78\u201386.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"215_CR2","volume-title":"43rd IEEE conference on decision and control","author":"C. A. Harrison","year":"2004","unstructured":"Harrison, C. A., Good, R. P., Kadosh, D., & Qin, S. J. (2004). A multi-step supervisory control strategy for semiconductor device manufacturing. In 43rd IEEE conference on decision and control."},{"issue":"2","key":"215_CR3","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1109\/66.492820","volume":"9","author":"Y. F. Hung","year":"1996","unstructured":"Hung, Y. F., & Leachman, R. C. (1996). A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing, 9(2), 257\u2013269.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"2","key":"215_CR4","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1109\/TSM.2010.2045666","volume":"23","author":"Y. D. Kim","year":"2010","unstructured":"Kim, Y. D., Joo, B. J., & Choi, S. Y. (2010). Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing, 23(2), 246\u2013254.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"215_CR5","doi-asserted-by":"crossref","first-page":"529","DOI":"10.1080\/0953728021000014954","volume":"13","author":"Y. H. Lee","year":"2002","unstructured":"Lee, Y. H., & Kim, T. (2002). Manufacturing cycle time reduction using balance control in the semiconductor fabrication line. Production Planning & Control, 13, 529\u2013540.","journal-title":"Production Planning & Control"},{"issue":"5","key":"215_CR6","doi-asserted-by":"crossref","first-page":"798","DOI":"10.1287\/opre.37.5.798","volume":"37","author":"C. L. Monma","year":"1989","unstructured":"Monma, C. L., & Potts, C. N. (1989). On the complexity of scheduling with batch setup times. Operations Research, 37(5), 798\u2013804.","journal-title":"Operations Research"},{"issue":"4","key":"215_CR7","doi-asserted-by":"crossref","first-page":"392","DOI":"10.1109\/TSM.2005.858505","volume":"18","author":"A. J. Pasadyn","year":"2005","unstructured":"Pasadyn, A. J., & Edgar, T. F. (2005). Observability and state estimation for multiple product control in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 18(4), 392\u2013604.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1","key":"215_CR8","doi-asserted-by":"crossref","first-page":"301","DOI":"10.1116\/1.1539068","volume":"21","author":"S. J. Qin","year":"2003","unstructured":"Qin, S. J., Scheid, G. W., & Riley, T.J. (2003). Adaptive run-to-run control and monitoring for a rapid thermal processor. Journal of Vacuum Science & Technology B, 21(1), 301\u2013310.","journal-title":"Journal of Vacuum Science & Technology B"},{"key":"215_CR9","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/j.jprocont.2005.06.002","volume":"16","author":"S. J. Qin","year":"2006","unstructured":"Qin, S. J., Cherry, G., Good, R. P., Wang, J., & Harrison, C. A. (2006). Semiconductor manufacturing process control and monitoring: A fab-wide framework. Journal of Process Control, 16, 179\u2013191.","journal-title":"Journal of Process Control"},{"issue":"3","key":"215_CR10","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.cie.2006.04.002","volume":"50","author":"D. Y. Sha","year":"2006","unstructured":"Sha, D. Y., Hsu, S. Y., Che, Z. H., & Chen, C. H. (2006). A dispatching rule for photolithography scheduling with an on-line rework strategy. Computers and Industrial Engineering, 50(3), 233\u2013247.","journal-title":"Computers and Industrial Engineering"},{"issue":"6","key":"215_CR11","doi-asserted-by":"crossref","first-page":"2018","DOI":"10.1016\/j.cor.2006.10.003","volume":"35","author":"R. Uzsoy","year":"2008","unstructured":"Uzsoy, R., & Vel\u00e1squez, J. D. (2008). Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times. Computers and Operations Research, 35(6), 2018\u20132033.","journal-title":"Computers and Operations Research"},{"issue":"4","key":"215_CR12","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1287\/opre.43.4.692","volume":"43","author":"S. Webster","year":"1995","unstructured":"Webster, S., & Baker, K. R. (1995). Scheduling groups of jobs on a single machine. Operations Research, 43(4), 692\u2013703.","journal-title":"Operations Research"},{"key":"215_CR13","unstructured":"Xpress-Mosel user guide. Englewood Cliffs: Dash Optimization Ltd. (2004)."},{"issue":"2","key":"215_CR14","doi-asserted-by":"crossref","first-page":"143","DOI":"10.1080\/002077299292498","volume":"30","author":"W. Yang","year":"1999","unstructured":"Yang, W., & Liao, C. (1999). Survey of scheduling research involving setup times. International Journal of Systems Science, 30(2), 143\u2013155.","journal-title":"International Journal of Systems Science"},{"key":"215_CR15","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1007\/s10951-006-8776-2","volume":"9","author":"J. J. Yuan","year":"2006","unstructured":"Yuan, J. J., Liu, Z. H., Ng, C. T., & Cheng, T. C. E. (2006). Single machine batch scheduling problem with family setup times and release dates to minimize makespan. Journal of Scheduling, 9, 499\u2013513.","journal-title":"Journal of Scheduling"},{"key":"215_CR16","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1016\/0166-218X(94)00139-5","volume":"66","author":"S. Zdrzalka","year":"1996","unstructured":"Zdrzalka, S. (1996). A sequencing problem with family setup times. Discrete Applied Mathematics, 66, 161\u2013183.","journal-title":"Discrete Applied Mathematics"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-010-0215-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-010-0215-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-010-0215-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T05:39:45Z","timestamp":1559453985000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-010-0215-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,12,29]]},"references-count":16,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2012,4]]}},"alternative-id":["215"],"URL":"https:\/\/doi.org\/10.1007\/s10951-010-0215-8","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2010,12,29]]}}}