{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,16]],"date-time":"2026-05-16T16:08:59Z","timestamp":1778947739128,"version":"3.51.4"},"reference-count":120,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2011,1,7]],"date-time":"2011-01-07T00:00:00Z","timestamp":1294358400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1007\/s10951-010-0222-9","type":"journal-article","created":{"date-parts":[[2011,1,6]],"date-time":"2011-01-06T22:57:11Z","timestamp":1294354631000},"page":"583-599","source":"Crossref","is-referenced-by-count":371,"title":["A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations"],"prefix":"10.1007","volume":"14","author":[{"given":"Lars","family":"M\u00f6nch","sequence":"first","affiliation":[]},{"given":"John W.","family":"Fowler","sequence":"additional","affiliation":[]},{"given":"St\u00e9phane","family":"Dauz\u00e8re-P\u00e9r\u00e8s","sequence":"additional","affiliation":[]},{"given":"Scott J.","family":"Mason","sequence":"additional","affiliation":[]},{"given":"Oliver","family":"Rose","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,1,7]]},"reference":[{"key":"222_CR1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","volume":"34","author":"J. Adams","year":"1988","unstructured":"Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391\u2013401.","journal-title":"Management Science"},{"issue":"1","key":"222_CR2","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1109\/TSM.2005.863217","volume":"19","author":"G. K. Agrawal","year":"2006","unstructured":"Agrawal, G. K., & Heragu, S. S. (2006). A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Transactions on Semiconductor Manufacturing, 19(1), 112\u2013120.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"222_CR3","first-page":"374","volume-title":"IEEE\/CPMT international electronics manufacturing technology symposium","author":"E. Akcali","year":"2000","unstructured":"Akcali, E., & Uzsoy, R. (2000). A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography. In IEEE\/CPMT international electronics manufacturing technology symposium (pp. 374\u2013381)."},{"issue":"1","key":"222_CR4","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1109\/66.909654","volume":"14","author":"E. Akcali","year":"2001","unstructured":"Akcali, E., Nemoto, K., & Uzsoy, R. (2001). Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 14(1), 48\u201356.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"222_CR5","volume-title":"Proceedings of VIII metaheuristic international conference (MIC)","author":"C. Almeder","year":"2009","unstructured":"Almeder, C., & M\u00f6nch, L. (2009). Variable neighbourhood search for parallel batch machine scheduling. In Proceedings of VIII metaheuristic international conference (MIC)."},{"key":"222_CR6","unstructured":"Applied Materials (2010). Applied real-time dispatcher. Available at: http:\/\/www.appliedmaterials.com\/products\/rt_dispatch_2.html last accessed on 15 August 2010."},{"key":"222_CR7","volume-title":"Wafer fabrication: factory performance and analysis","author":"L. Atherton","year":"1995","unstructured":"Atherton, L., & Atherton, R. W. (1995). Wafer fabrication: factory performance and analysis. Boston: Kluwer Academic."},{"issue":"8","key":"222_CR8","doi-asserted-by":"crossref","first-page":"1621","DOI":"10.1080\/00207540310001636994","volume":"42","author":"H. Balasubramanian","year":"2004","unstructured":"Balasubramanian, H., M\u00f6nch, L., Fowler, J. W., & Pfund, M. (2004). Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness. International Journal of Production Research, 42(8), 1621\u20131638.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"222_CR9","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1080\/00207540412331282024","volume":"43","author":"A. Barua","year":"2005","unstructured":"Barua, A., Narasimhan, R., Upasani, A. A., & Uzsoy, R. (2005). Implementing global factory schedules in the face of stochastic disruptions. International Journal of Production Research, 43(4), 94\u2013109.","journal-title":"International Journal of Production Research"},{"issue":"2","key":"222_CR10","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1002\/1520-6750(198804)35:2<177::AID-NAV3220350203>3.0.CO;2-V","volume":"35","author":"L. Bianco","year":"1988","unstructured":"Bianco, L., Ricciardelli, S., Rinaldi, G., & Sassano, A. (1988). Scheduling tasks with sequence-dependent processing times. Naval Research Logistics, 35(2), 177\u2013184.","journal-title":"Naval Research Logistics"},{"issue":"3","key":"222_CR11","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1287\/opre.36.3.377","volume":"36","author":"G. R. Bitran","year":"1988","unstructured":"Bitran, G. R., & Tirupati, D. (1988). Development and implementation of a scheduling system for a wafer fabrication facility. Operations Research, 36(3), 377\u2013395.","journal-title":"Operations Research"},{"key":"222_CR12","first-page":"148","volume-title":"Advanced semiconductor manufacturing conference","author":"R. Bixby","year":"2006","unstructured":"Bixby, R., Burda, R., & Miller, D. (2006). Short-interval detailed production scheduling in 300-mm semiconductor manufacturing using mixed integer and constraint programming. In Advanced semiconductor manufacturing conference (pp. 148\u2013154)."},{"key":"222_CR13","volume-title":"Complex scheduling","author":"P. Brucker","year":"2006","unstructured":"Brucker, P., & Knust, S. (2006). Complex scheduling. Berlin: Springer."},{"key":"222_CR14","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1002\/(SICI)1099-1425(199806)1:1<31::AID-JOS4>3.0.CO;2-R","volume":"1","author":"P. Brucker","year":"1998","unstructured":"Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M. Y., Potts, C. N., Tautenhahn, T., & van\u00a0de Velde, S. (1998). Scheduling a batching machine. Journal of Scheduling, 1, 31\u201354.","journal-title":"Journal of Scheduling"},{"key":"222_CR15","doi-asserted-by":"crossref","first-page":"1768","DOI":"10.1109\/WSC.2007.4419801","volume-title":"Proceedings of the 2007 winter simulation conference","author":"M. Bureau","year":"2007","unstructured":"Bureau, M., Dauzere-Peres, S., Yugma, C., Vermarien, L., & Maria, J.-B. (2007). Simulation results and formalism for global\u2013local scheduling in semiconductor manufacturing. In Proceedings of the 2007 winter simulation conference (pp. 1768\u20131773)."},{"key":"222_CR16","doi-asserted-by":"crossref","unstructured":"Cai, Y., Kutanoglu, E., Hasenbein, J., & Quin, J. (2011, to appear). Scheduling with advanced process control constraints. Journal of Scheduling.","DOI":"10.1007\/s10951-010-0215-8"},{"issue":"3","key":"222_CR17","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1080\/09537280601035836","volume":"18","author":"E. Cakici","year":"2007","unstructured":"Cakici, E., & Mason, S. J. (2007). Parallel machine scheduling subject to auxiliary resource constraints. Production Planning and Control, 18(3), 217\u2013225.","journal-title":"Production Planning and Control"},{"issue":"1\u20132","key":"222_CR18","first-page":"119","volume":"3","author":"S. M. Chandra","year":"2008","unstructured":"Chandra, S. M., Mathirajan, M., Gopinath, R., & Sivakumar, A. I. (2008). Taboo search methods for scheduling a burn-in oven with non-identical job sizes and secondary resource constraints. International Journal of Operational Research, 3(1\u20132), 119\u2013139.","journal-title":"International Journal of Operational Research"},{"key":"222_CR19","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1007\/s00291-006-0062-3","volume":"29","author":"C.-F. Chien","year":"2007","unstructured":"Chien, C.-F., & Chen, C.-H. (2007). A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups. OR Spectrum, 29, 391\u2013419.","journal-title":"OR Spectrum"},{"key":"222_CR20","first-page":"28","volume-title":"Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM)","author":"S.-Y. Choi","year":"2005","unstructured":"Choi, S.-Y., Kim, Y.-D., & Joo, B.-J. (2005). Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility. In Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM) (pp. 28\u201333)."},{"key":"222_CR21","first-page":"69","volume-title":"Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM)","author":"Y.-I. Choung","year":"2001","unstructured":"Choung, Y.-I., Jun, K.-S., Han, D.-S., Jang, Y.-C., Lee, T.-E., & Leachman, R. C. (2001). Design of a scheduling system for diffusion processes. In Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM) (pp.\u00a069\u201373)."},{"issue":"7","key":"222_CR22","doi-asserted-by":"crossref","first-page":"1087","DOI":"10.1016\/S0305-0548(02)00059-X","volume":"30","author":"J. K. Cochran","year":"2003","unstructured":"Cochran, J. K., Horng, S.-M., & Fowler, J. W. (2003). A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers and Operations Research, 30(7), 1087\u20131102.","journal-title":"Computers and Operations Research"},{"key":"222_CR23","doi-asserted-by":"crossref","unstructured":"Damodaran, P., V\u00e9lez-Gallego, M.-C., & Maya, J. (2009, to appear). A GRASP approach for makespan minimization on parallel batch processing machines. Journal of Intelligent Manufacturing.","DOI":"10.1007\/s10845-009-0272-z"},{"issue":"4","key":"222_CR24","doi-asserted-by":"crossref","first-page":"622","DOI":"10.1109\/TSM.2005.858502","volume":"18","author":"S. L. M. Diaz de","year":"2005","unstructured":"de Diaz, S. L. M., Fowler, J. W., Pfund, M. E., Mackulak, G. T., & Hickie, M. (2005). Evaluating the impacts of reticle requirements in semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 18(4), 622\u2013632.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"1\u20132","key":"222_CR25","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/S0360-8352(97)00088-0","volume":"33","author":"E. Demirkol","year":"1997","unstructured":"Demirkol, E., & Uzsoy, R. (1997). Performance of decomposition methods for complex workshops under multiple criteria. Computers and Industrial Engineering, 33(1\u20132), 261\u2013264.","journal-title":"Computers and Industrial Engineering"},{"key":"222_CR26","doi-asserted-by":"crossref","first-page":"155","DOI":"10.1002\/(SICI)1099-1425(200005\/06)3:3<155::AID-JOS39>3.0.CO;2-E","volume":"3","author":"E. Demirkol","year":"2000","unstructured":"Demirkol, E., & Uzsoy, R. (2000). Decomposition methods for re-entrant flow shops with sequence dependent setup times. Journal of Scheduling, 3, 155\u2013177.","journal-title":"Journal of Scheduling"},{"key":"222_CR27","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1023\/A:1009627429878","volume":"3","author":"E. Demirkol","year":"1997","unstructured":"Demirkol, E., Mehta, S., & Uzsoy, R. (1997). A computational study of shifting bottleneck procedures for shop scheduling problems. Journal of Heuristics, 3, 111\u2013137.","journal-title":"Journal of Heuristics"},{"issue":"1","key":"222_CR28","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1016\/S0377-2217(97)00019-2","volume":"109","author":"E. Demirkol","year":"1998","unstructured":"Demirkol, E., Mehta, S., & Uzsoy, R. (1998). Benchmarks for shop scheduling problems. European Journal of Operational Research, 109(1), 137\u2013141.","journal-title":"European Journal of Operational Research"},{"key":"222_CR29","first-page":"581","volume-title":"Proceedings of the 4th multidisciplinary international conference on scheduling: theory and applications (MISTA 2009)","author":"B. Detienne","year":"2009","unstructured":"Detienne, B., Dauz\u00e8re-P\u00e9r\u00e8s, S., & Yugma, C. (2009). Scheduling inspection operations subject to a fixed production schedule. In Proceedings of the 4th multidisciplinary international conference on scheduling: theory and applications (MISTA 2009) (pp. 581\u2013593)."},{"key":"222_CR30","volume-title":"Proceedings of the IEEE international conference on industrial engineering and engineering management","author":"R. Driessel","year":"2008","unstructured":"Driessel, R., & M\u00f6nch, L. (2008). An integrated scheduling and automated material handling approach for complex manufacturing systems. In Proceedings of the IEEE international conference on industrial engineering and engineering management."},{"key":"222_CR31","first-page":"81","volume-title":"Proceedings of the conference on automation science and engineering (CASE)","author":"R. Driessel","year":"2010","unstructured":"Driessel, R., H\u00f6nig, U., M\u00f6nch, L., & Schiffmann, W. (2010). A\u00a0parallel shifting bottleneck heuristic for scheduling complex job shops: architecture and performance assessment. In Proceedings of the conference on automation science and engineering (CASE) (pp.\u00a081\u201386). Toronto: IEEE."},{"key":"222_CR32","first-page":"875","volume-title":"Proceedings of the 1999 winter simulation conference","author":"M. D\u00fcmmler","year":"1999","unstructured":"D\u00fcmmler, M. (1999). Using simulation and genetic algorithms to improve cluster tool performance. In Proceedings of the 1999 winter simulation conference (pp. 875\u2013879)."},{"issue":"8","key":"222_CR33","doi-asserted-by":"crossref","first-page":"2599","DOI":"10.1016\/j.cor.2006.12.019","volume":"35","author":"I. Essafi","year":"2008","unstructured":"Essafi, I., Mati, Y., & Dauz\u00e8re-P\u00e9r\u00e8s, S. (2008). A genetic local search algorithm for minimizing total weighted tardiness in the job shop scheduling problem. Computers and Operations Research, 35(8), 2599\u20132616.","journal-title":"Computers and Operations Research"},{"issue":"4","key":"222_CR34","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1109\/TEPM.2006.887355","volume":"29","author":"V. Erramilli","year":"2006","unstructured":"Erramilli, V., & Mason, S. J. (2006). Multiple orders per job compatible batch scheduling. IEEE Transactions on Electronics Packaging Manufacturing, 29(4), 285\u2013296.","journal-title":"IEEE Transactions on Electronics Packaging Manufacturing"},{"key":"222_CR35","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1007\/s10479-007-0286-x","volume":"159","author":"V. Erramilli","year":"2008","unstructured":"Erramilli, V., & Mason, S. J. (2008). Multiple orders per job batch scheduling with incompatible jobs. Annals of Operations Research, 159, 245\u2013260.","journal-title":"Annals of Operations Research"},{"key":"222_CR36","doi-asserted-by":"crossref","first-page":"2277","DOI":"10.1109\/WSC.2008.4736331","volume-title":"Proceedings of the 2008 winter simulation conference","author":"K. Fordyce","year":"2008","unstructured":"Fordyce, K., Bixby, R., & Burda, R. (2008). Technology that upsets the social order\u2014a\u00a0paradigm shift in assigning lots to tools in a wafer fabricator\u2014the transition from rules to optimization. In Proceedings of the 2008 winter simulation conference (pp. 2277\u20132285)."},{"issue":"2\/9","key":"222_CR37","first-page":"156","volume":"1","author":"J. W. Fowler","year":"2000","unstructured":"Fowler, J. W., Horng, S., & Cochran, J. K. (2000). A hybridized genetic algorithm to solve parallel machine scheduling problems with sequence dependent setups. International Journal of Manufacturing Technology and Management, 1(2\/9), 156\u2013172.","journal-title":"International Journal of Manufacturing Technology and Management"},{"issue":"3","key":"222_CR38","doi-asserted-by":"crossref","first-page":"675","DOI":"10.1080\/00207540600792382","volume":"45","author":"B. P. Gan","year":"2007","unstructured":"Gan, B. P., Liow, M., Gupta, A. K., Lendermann, P., Turner, S. J., & Wang, X. G. (2007). Analysis of a borderless fab using interoperating AutoSched AP models. International Journal of Production Research, 45(3), 675\u2013697.","journal-title":"International Journal of Production Research"},{"key":"222_CR39","doi-asserted-by":"crossref","first-page":"1431","DOI":"10.1080\/00207540600993360","volume":"46","author":"C. D. Geiger","year":"2008","unstructured":"Geiger, C. D., & Uzsoy, R. (2008). Learning effective sequencing rules for batch processor scheduling. International Journal of Production Research, 46, 1431\u20131454.","journal-title":"International Journal of Production Research"},{"key":"222_CR40","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","volume":"5","author":"R. L. Graham","year":"1979","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kann, A.\u00a0H.\u00a0G. (1979). Optimization and approximation in deterministic sequencing and scheduling: a\u00a0survey. Annals of Discrete Mathematics, 5, 287\u2013326.","journal-title":"Annals of Discrete Mathematics"},{"key":"222_CR41","first-page":"13","volume-title":"Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM)","author":"A. K. Gupta","year":"2005","unstructured":"Gupta, A. K., & Sivakumar, A. I. (2005). On-time delivery Pareto controllability for batch processing in semiconductor manufacturing. In Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM) (pp. 13\u201330)."},{"key":"222_CR42","doi-asserted-by":"crossref","first-page":"1163","DOI":"10.1007\/s00170-004-2296-z","volume":"27","author":"A. K. Gupta","year":"2006","unstructured":"Gupta, A. K., & Sivakumar, A. I. (2006). Job shop scheduling techniques in semiconductor manufacturing. International Journal of Advanced Manufacturing Technology, 27, 1163\u20131169.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"222_CR43","first-page":"581","volume-title":"Intelligent scheduling","author":"K. C. Hadavi","year":"1994","unstructured":"Hadavi, K. C. (1994). ReDS: a\u00a0real time production scheduling system from conception to practice. In M. Zweben & M. S. Fox (Eds.), Intelligent scheduling (pp. 581\u2013604). San Fransisco: Morgan Kaufmann."},{"issue":"1","key":"222_CR44","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1007\/s10479-007-0281-2","volume":"159","author":"J. Jampani","year":"2008","unstructured":"Jampani, J., & Mason, S. J. (2008). Column generation heuristics for multiple machine, multiple orders per job scheduling problems. Annals of Operations Research, 159(1), 261\u2013273.","journal-title":"Annals of Operations Research"},{"key":"222_CR45","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1016\/j.cie.2009.09.004","volume":"58","author":"J. Jampani","year":"2010","unstructured":"Jampani, J., & Mason, S. J. (2010). Column generation heuristic for complex job shop multiple orders per job scheduling. Computers and Industrial Engineering, 58, 108\u2013118.","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"222_CR46","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1504\/IJMHEUR.2010.034204","volume":"1","author":"J. Jampani","year":"2010","unstructured":"Jampani, J., Pohl, E. A., Mason, S., & M\u00f6nch, L. (2010). Integrated heuristics for scheduling multiple order jobs in a complex job shop. International Journal of Metaheuristics, 1(2), 156\u2013180.","journal-title":"International Journal of Metaheuristics"},{"issue":"10","key":"222_CR47","doi-asserted-by":"crossref","first-page":"2565","DOI":"10.1080\/00207540701725042","volume":"47","author":"J. Jia","year":"2009","unstructured":"Jia, J., & Mason, S. J. (2009). Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. International Journal of Production Research, 47(10), 2565\u20132585.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"222_CR48","doi-asserted-by":"crossref","first-page":"600","DOI":"10.1109\/TSM.2008.2005368","volume":"21","author":"J. Jimenez","year":"2008","unstructured":"Jimenez, J., Mackulak, G. T., & Fowler, J. W. (2008). Levels of capacity and material handling system modeling for factory integration decision making in semiconductor wafer fabs. IEEE Transactions on Semiconductor Manufacturing, 21(4), 600\u2013613.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"222_CR49","doi-asserted-by":"crossref","first-page":"2059","DOI":"10.1109\/WSC.2008.4736302","volume-title":"Proceedings of the 2008 winter simulation conference","author":"C. Johnz\u00e9n","year":"2008","unstructured":"Johnz\u00e9n, C., Dauz\u00e8re-P\u00e9r\u00e8s, S., Derreumaux, A., Vialletelle, P., & Yugma, Y. (2008). Impact of qualification management on scheduling in semiconductor manufacturing. In Proceedings of the 2008 winter simulation conference (pp. 2059\u20132066)."},{"key":"222_CR50","unstructured":"Johnz\u00e9n, C. (2009). Modeling and optimizing flexible capacity allocation in semiconductor manufacturing. PhD thesis, Ecole Nationale Sup\u00e9rieure des Mines de Saint-Etienne, France."},{"issue":"1","key":"222_CR51","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1080\/09537287.2010.490022","volume":"22","author":"C. Johnz\u00e9n","year":"2011","unstructured":"Johnz\u00e9n, C., Dauz\u00e8re-P\u00e9r\u00e8s, S., & Vialletelle, P. (2011). Flexibility measures for qualification management in wafer fabs. Production Planning and Control, 22(1), 81\u201390.","journal-title":"Production Planning and Control"},{"key":"222_CR52","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1016\/j.ejor.2003.10.011","volume":"162","author":"F. Jolai","year":"2005","unstructured":"Jolai, F. (2005). Minimizing number of tardy jobs on a batch processing machine with incompatible job families. European Journal of Operational Research, 162, 184\u2013190.","journal-title":"European Journal of Operational Research"},{"key":"222_CR53","first-page":"517","volume-title":"Intelligent scheduling","author":"K. G. Kempf","year":"1994","unstructured":"Kempf, K. G. (1994). Intelligently scheduling semiconductor wafer fabrication. In M. Zweben & M. Fox (Eds.), Intelligent scheduling (pp. 517\u2013544). San Fransisco: Morgan Kaufmann."},{"issue":"1","key":"222_CR54","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/S0278-6125(98)80008-3","volume":"17","author":"K. Kempf","year":"1998","unstructured":"Kempf, K., Uzsoy, R., & Wang, C. (1998). Scheduling a single batch processing machine with secondary resource constraints. Journal of Manufacturing Systems, 17(1), 37\u201351.","journal-title":"Journal of Manufacturing Systems"},{"key":"222_CR55","first-page":"167","volume":"34","author":"S. Kim","year":"2002","unstructured":"Kim, S., Yea, S.-H., & Kim, B. (2002). Shift scheduling for steppers in the semiconductor wafer fabrication process. IIE Transactions, 34, 167\u2013177.","journal-title":"IIE Transactions"},{"key":"222_CR56","first-page":"1686","volume-title":"Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM)","author":"A. Klemmt","year":"2009","unstructured":"Klemmt, A., Weigert, G., Almeder, C., & M\u00f6nch, L. (2009). A comparison of MIP-based decomposition techniques and VNS approaches for batch scheduling problems. In Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM) (pp. 1686\u20131694)."},{"key":"222_CR57","doi-asserted-by":"crossref","unstructured":"Klemmt, A., Weigert, G., & Werner, S. (2011, to appear) MIP approaches for batch scheduling in semiconductor manufacturing. European Journal of Industrial Engineering.","DOI":"10.1504\/EJIE.2011.041621"},{"key":"222_CR58","first-page":"231","volume-title":"Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM)","author":"S. Krihnashwamy","year":"2005","unstructured":"Krihnashwamy, S., & Nettles, S. (2005). Scheduling challenges in 300m manufacturing. In Proceedings of the international conference on modeling and analysis of semiconductor manufacturing (MASM) (pp. 231\u2013241)."},{"issue":"1","key":"222_CR59","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1080\/00207540600786665","volume":"46","author":"M. E. Kurz","year":"2008","unstructured":"Kurz, M. E., & Mason, S. J. (2008). Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times. International Journal of Production Research, 46(1), 131\u2013151.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"222_CR60","doi-asserted-by":"crossref","first-page":"63","DOI":"10.1016\/j.ejor.2006.07.023","volume":"128","author":"J. D. Laub","year":"2007","unstructured":"Laub, J. D., Fowler, J. W., & Keha, A. B. (2007). Minimizing makespan with multiple-orders-per-job in a two-machine flow-shop. European Journal of Operational Research, 128(1), 63\u201379.","journal-title":"European Journal of Operational Research"},{"key":"222_CR61","first-page":"2179","volume-title":"Proceedings of the 2008 winter simulation conference","author":"T.-E. Lee","year":"2008","unstructured":"Lee, T.-E. (2008). A review of scheduling theory and methods for semiconductor manufacturing cluster tools. In Proceedings of the 2008 winter simulation conference (pp. 2179\u20132135)."},{"key":"222_CR62","first-page":"219","volume-title":"Proceedings ANTS 2008","author":"L. Li","year":"2008","unstructured":"Li, L., Qiao, F., & Wu, Q. (2008). ACO-based scheduling of parallel batch processing machines with incompatible job families to minimize total weighted tardiness. In Proceedings ANTS 2008 (pp.\u00a0219\u2013228)."},{"issue":"9\u201310","key":"222_CR63","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1007\/s00170-008-1904-8","volume":"44","author":"L. Li","year":"2009","unstructured":"Li, L., Qiao, F., & Wu, Q. (2009). ACO-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints. International Journal of Advanced Manufacturing Technology, 44(9\u201310), 985\u2013994.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"10","key":"222_CR64","doi-asserted-by":"crossref","first-page":"3016","DOI":"10.1016\/j.cor.2005.11.011","volume":"34","author":"S. Malve","year":"2007","unstructured":"Malve, S., & Uzsoy, R. (2007). A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computers and Operations Research, 34(10), 3016\u20133028.","journal-title":"Computers and Operations Research"},{"key":"222_CR65","unstructured":"MASM (2009). Semiconductor manufacturing testbed: data sets. Arizona State University, http:\/\/www.eas.asu.edu\/~masmlab\/ftp.htm ."},{"issue":"3","key":"222_CR66","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1002\/jos.102","volume":"5","author":"S. J. Mason","year":"2002","unstructured":"Mason, S. J., Fowler, J. W., & Carlyle, W. M. (2002). A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5(3), 247\u2013262.","journal-title":"Journal of Scheduling"},{"issue":"3","key":"222_CR67","doi-asserted-by":"crossref","first-page":"613","DOI":"10.1081\/00207540310001614132","volume":"42","author":"S. J. Mason","year":"2004","unstructured":"Mason, S. J., Jin, S., & Wessels, M. C. (2004). Rescheduling strategies for minimizing total weighted tardiness in complex job shops. International Journal of Production Research, 42(3), 613\u2013628.","journal-title":"International Journal of Production Research"},{"issue":"10","key":"222_CR68","doi-asserted-by":"crossref","first-page":"1943","DOI":"10.1080\/00207540412331331399","volume":"43","author":"S. J. Mason","year":"2005","unstructured":"Mason, S. J., Fowler, J. W., Carlyle, W. M., & Montgomery, D. C. (2005). Heuristics for minimizing total weighted tardiness in complex job shops. International Journal of Production Research, 43(10), 1943\u20131963.","journal-title":"International Journal of Production Research"},{"key":"222_CR69","unstructured":"Mason, S. J., Kurz, M. E., Pohl, L. M., Fowler, J. W., & Pfund, M. E. (2007). Random keys implementation of NSGA-II for semiconductor manufacturing scheduling. International Journal of Information Technology and Intelligent Computing, 2(3)."},{"key":"222_CR70","doi-asserted-by":"crossref","first-page":"990","DOI":"10.1007\/s00170-005-2585-1","volume":"29","author":"M. Mathirajan","year":"2006","unstructured":"Mathirajan, M., & Sivakumar, A. I. (2006). Literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor. International Journal of Advanced Manufacturing Technology, 29, 990\u20131001.","journal-title":"International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"222_CR71","first-page":"117","volume":"2","author":"M. Mathirajan","year":"2004","unstructured":"Mathirajan, M., Sivakumar, A. I., & Kalaivani, P. (2004). An efficient simulated annealing algorithm for scheduling burn-in oven with non-identical job sizes. International Journal of Applied Management and Technology, 2(2), 117\u2013138.","journal-title":"International Journal of Applied Management and Technology"},{"key":"222_CR72","first-page":"165","volume":"30","author":"S. V. Mehta","year":"1998","unstructured":"Mehta, S. V., & Uzsoy, R. (1998). Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions, 30, 165\u2013178.","journal-title":"IIE Transactions"},{"issue":"6","key":"222_CR73","doi-asserted-by":"crossref","first-page":"648","DOI":"10.1080\/09537280600900774","volume":"17","author":"J. R. Montoya-Torres","year":"2006","unstructured":"Montoya-Torres, J. R. (2006). A\u00a0literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Production Planning and Control, 17(6), 648\u2013663.","journal-title":"Production Planning and Control"},{"issue":"6","key":"222_CR74","doi-asserted-by":"crossref","first-page":"470","DOI":"10.1007\/BF03250964","volume":"46","author":"L. M\u00f6nch","year":"2004","unstructured":"M\u00f6nch, L. (2004). Scheduling-Framework f\u00fcr Jobs auf parallelen Maschinen in komplexen Produktionssystemen. WIRTSCHAFTSINFORMATIK, 46(6), 470\u2013480.","journal-title":"WIRTSCHAFTSINFORMATIK"},{"key":"222_CR75","first-page":"106","volume-title":"Proceedings of the 4th multi-disciplinary international scheduling conference (MISTA)","author":"L. M\u00f6nch","year":"2009","unstructured":"M\u00f6nch, L., & Almeder, C. (2009). Ant colony optimization for scheduling jobs with incompatible families on parallel batch machines. In Proceedings of the 4th multi-disciplinary international scheduling conference (MISTA) (pp. 106\u2013114), Dublin, Ireland."},{"key":"222_CR76","doi-asserted-by":"crossref","first-page":"673","DOI":"10.1016\/j.cie.2005.06.004","volume":"49","author":"L. M\u00f6nch","year":"2005","unstructured":"M\u00f6nch, L., & Driessel, R. (2005). A distributed shifting bottleneck heuristic for complex job shops. Computers and Industrial Engineering, 49, 673\u2013680.","journal-title":"Computers and Industrial Engineering"},{"key":"222_CR77","doi-asserted-by":"crossref","first-page":"2731","DOI":"10.1016\/j.cor.2004.04.001","volume":"32","author":"L. M\u00f6nch","year":"2005","unstructured":"M\u00f6nch, L., Balasubramanian, H., Fowler, J. W., & Pfund, M. E. (2005). Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Computers and Operations Research, 32, 2731\u20132750.","journal-title":"Computers and Operations Research"},{"issue":"2","key":"222_CR78","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1007\/s00291-005-0013-4","volume":"28","author":"L. M\u00f6nch","year":"2006","unstructured":"M\u00f6nch, L., Unbehaun, R., & Choung, Y. I. (2006a). Minimizing earliness and tardiness on a single burn-in oven with a common due date and a maximum available tardiness constraint. OR Spectrum, 28(2), 177\u2013198.","journal-title":"OR Spectrum"},{"issue":"3","key":"222_CR79","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1016\/j.engappai.2005.10.001","volume":"19","author":"L. M\u00f6nch","year":"2006","unstructured":"M\u00f6nch, L., Zimmermann, J., & Otto, P. (2006b). Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. Journal of Engineering Applications of Artificial Intelligence, 19(3), 235\u2013245.","journal-title":"Journal of Engineering Applications of Artificial Intelligence"},{"issue":"7","key":"222_CR80","doi-asserted-by":"crossref","first-page":"701","DOI":"10.1080\/09537280600901269","volume":"17","author":"L. M\u00f6nch","year":"2006","unstructured":"M\u00f6nch, L., Stehli, M., Zimmermann, J., & Habenicht, I. (2006c). The FABMAS multi-agent-system prototype for production control of waferfabs: design, implementation, and performance assessment. Production Planning and Control, 17(7), 701\u2013716.","journal-title":"Production Planning and Control"},{"issue":"3","key":"222_CR81","doi-asserted-by":"crossref","first-page":"2100","DOI":"10.1016\/j.ejor.2005.12.020","volume":"177","author":"L. M\u00f6nch","year":"2007","unstructured":"M\u00f6nch, L., Schabacker, R., Pabst, D., & Fowler, J. W. (2007). Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. European Journal of Operational Research, 177(3), 2100\u20132118.","journal-title":"European Journal of Operational Research"},{"key":"222_CR82","volume-title":"Proceedings of the 16th European simulation symposium","author":"H. Niedermayer","year":"2004","unstructured":"Niedermayer, H., & Rose, O. (2004a). Solution approaches for the cluster tool scheduling problem in semiconductor manufacturing. In Proceedings of the 16th European simulation symposium."},{"key":"222_CR83","volume-title":"Proceedings of the industrial engineering research conference","author":"H. Niedermayer","year":"2004","unstructured":"Niedermayer, H., & Rose, O. (2004b). Approximation of the cycle time of cluster tools in semiconductor manufacturing. In Proceedings of the industrial engineering research conference."},{"key":"222_CR84","doi-asserted-by":"crossref","first-page":"2203","DOI":"10.1109\/WSC.2005.1574507","volume-title":"Proceedings of the 2005 winter simulation conference","author":"S. Oechsner","year":"2005","unstructured":"Oechsner, S., & Rose, O. (2005). Scheduling cluster tools using filtered beam search and recipe comparison. In Proceedings of the 2005 winter simulation conference (pp. 2203\u20132210)."},{"key":"222_CR85","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-6329-7","volume-title":"Decomposition methods for complex factory scheduling problems","author":"I. M. Ovacik","year":"1997","unstructured":"Ovacik, I. M., & Uzsoy, R. (1997). Decomposition methods for complex factory scheduling problems. Massachusetts: Kluwer Academic."},{"key":"222_CR86","doi-asserted-by":"crossref","first-page":"3173","DOI":"10.1080\/00207549508904867","volume":"33","author":"I. M. Ovacik","year":"1995","unstructured":"Ovacik, I. M., & Uzsoy, R. (1995). Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent setup times. International Journal of Production Research, 33, 3173\u20133292.","journal-title":"International Journal of Production Research"},{"key":"222_CR87","first-page":"856","volume-title":"Proceedings of the 1999 winter simulation conference","author":"S. Park","year":"1999","unstructured":"Park, S., Fowler, J. W., Carlyle, M., & Hickie, M. (1999). Assessment of potential gains in productivity due to proactive reticle management. In Proceedings of the 1999 winter simulation conference (pp. 856\u2013864)."},{"key":"222_CR88","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1007\/0-387-33117-4_9","volume-title":"Handbook of production scheduling","author":"M. Pfund","year":"2006","unstructured":"Pfund, M., Mason, S., & Fowler, J. W. (2006). Dispatching and scheduling in semiconductor manufacturing: state of the art and survey of needs. In J. Herrmann (Ed.), Handbook of production scheduling (pp. 213\u2013241). Heidelberg: Springer."},{"issue":"1","key":"222_CR89","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1007\/s10951-007-0049-1","volume":"11","author":"M. E. Pfund","year":"2008","unstructured":"Pfund, M. E., Balasubramanian, H., Fowler, J. W., Mason, S. J., & Rose, O. (2008). A multi-criteria approach for scheduling semiconductor wafer fabrication facilities. Journal of Scheduling, 11(1), 29\u201347.","journal-title":"Journal of Scheduling"},{"key":"222_CR90","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1016\/S0377-2217(99)00153-8","volume":"120","author":"C. N. Potts","year":"2000","unstructured":"Potts, C. N., & Kovalyov, M. Y. (2000). Scheduling with batching: a\u00a0review. European Journal of Operational Research, 120, 228\u2013249.","journal-title":"European Journal of Operational Research"},{"issue":"2\u20133","key":"222_CR91","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1504\/IJMTM.2007.011848","volume":"10","author":"R.G. Qiu","year":"2007","unstructured":"Qiu, R.G. (2007). A service-oriented integration framework for semiconductor manufacturing systems. International Journal Manufacturing Technology and Management, 10(2\u20133), 177\u2013191.","journal-title":"International Journal Manufacturing Technology and Management"},{"issue":"4","key":"222_CR92","doi-asserted-by":"crossref","first-page":"633","DOI":"10.1109\/TSM.2005.858503","volume":"18","author":"P. Qu","year":"2005","unstructured":"Qu, P., & Mason, S. J. (2005). Metaheuristic scheduling of 300 mm jobs containing multiple orders. IEEE Transactions on Semiconductor Manufacturing, 18(4), 633\u2013643.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"222_CR93","first-page":"264","volume-title":"Proceedings international conference on modeling and analysis of semiconductor manufacturing (MASM)","author":"P. Qu","year":"2002","unstructured":"Qu, P., Mason, S. J., & Kutanoglu, E. (2002). Scheduling jobs containing multiple orders. In Proceedings international conference on modeling and analysis of semiconductor manufacturing (MASM) (pp. 264\u2013269)."},{"key":"222_CR94","volume-title":"Proceedings of the industrial engineering research conference","author":"P. Qu","year":"2004","unstructured":"Qu, P., Steinmiller, B., & Mason, S. J. (2004). Incorporating automated material handling systems into a disjunctive graph. In Proceedings of the industrial engineering research conference, Houston."},{"key":"222_CR95","series-title":"LNCS","first-page":"209","volume-title":"Proceedings of the EvoCop 2006","author":"D. Reichelt","year":"2006","unstructured":"Reichelt, D., & M\u00f6nch, L. (2006). Multiobjective scheduling of jobs with incompatible families on parallel batch machines. In LNCS: Vol. 3906. Proceedings of the EvoCop 2006 (pp. 209\u2013211)."},{"issue":"7","key":"222_CR96","doi-asserted-by":"crossref","first-page":"1849","DOI":"10.1080\/00207549508904785","volume":"33","author":"J. K. Robinson","year":"1995","unstructured":"Robinson, J. K., Fowler, J. W., & Bard, J. F. (1995). The use of upstream and downstream information in scheduling semiconductor batch operations. International Journal of Production Research, 33(7), 1849\u20131869.","journal-title":"International Journal of Production Research"},{"issue":"1","key":"222_CR97","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1080\/09537287.2010.490014","volume":"22","author":"S. C. Sarin","year":"2011","unstructured":"Sarin, S. C., Varadarajan, A., & Wang, L. (2011). A\u00a0survey of dispatching rules for operational control in wafer fabrication. Production Planning and Control, 22(1), 4\u201324.","journal-title":"Production Planning and Control"},{"issue":"3","key":"222_CR98","doi-asserted-by":"crossref","first-page":"273","DOI":"10.1109\/66.857935","volume":"13","author":"W. Scholl","year":"2000","unstructured":"Scholl, W., & Domaschke, J. (2000). Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations. IEEE Transactions on Semiconductor Manufacturing, 13(3), 273\u2013277.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"4","key":"222_CR99","doi-asserted-by":"crossref","first-page":"569","DOI":"10.1109\/TASE.2007.906341","volume":"4","author":"Y. Song","year":"2007","unstructured":"Song, Y., Zhang, M. T., Yi, J., Zhang, L., & Zheng, L. (2007). Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization. IEEE Transactions on Automation Science and Engineering, 4(4), 569\u2013578.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"222_CR100","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1007\/s10951-006-0325-5","volume":"10","author":"K. Souriraja","year":"2007","unstructured":"Souriraja, K., & Uzsoy, R. (2007). Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. Journal of Scheduling, 10, 41\u201365.","journal-title":"Journal of Scheduling"},{"key":"222_CR101","doi-asserted-by":"crossref","first-page":"507","DOI":"10.1109\/COASE.2006.326933","volume-title":"Proceedings of the 2006 international conference on automation science and engineering","author":"N. R. Srinivasa Raghavan","year":"2006","unstructured":"Srinivasa Raghavan, N. R., & Venkataramana, M. (2006). Scheduling parallel batch processors with incompatible job families using ant colony optimization. In Proceedings of the 2006 international conference on automation science and engineering (pp.\u00a0507\u2013512)."},{"key":"222_CR102","volume-title":"Semiconductor devices: physics and technology","author":"S. M. Sze","year":"2001","unstructured":"Sze, S. M. (2001). Semiconductor devices: physics and technology (2nd ed.). New York: Wiley.","edition":"2"},{"issue":"7","key":"222_CR103","doi-asserted-by":"crossref","first-page":"728","DOI":"10.1080\/09537280600901467","volume":"17","author":"S. Tangudu","year":"2006","unstructured":"Tangudu, S., & Kurz, M. E. (2006). A branch-and-bound algorithm to minimize total weighted tardiness on a parallel-batch processing machine with ready times and incompatible job families. Production Planning and Control, 17(7), 728\u2013741.","journal-title":"Production Planning and Control"},{"issue":"3","key":"222_CR104","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1109\/66.857934","volume":"13","author":"H. Toba","year":"2000","unstructured":"Toba, H. (2000). Segment-based approach for real-time reactive rescheduling for automatic manufacturing control. IEEE Transactions on Semiconductor Manufacturing, 13(3), 264\u2013272.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"2","key":"222_CR105","doi-asserted-by":"crossref","first-page":"216","DOI":"10.1109\/TSM.2006.873510","volume":"19","author":"A. A. Upasani","year":"2006","unstructured":"Upasani, A. A., Uzsoy, R., & Sourirajan, K. (2006). A\u00a0problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Transactions on Semiconductor Manufacturing, 19(2), 216\u2013225.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"21","key":"222_CR106","doi-asserted-by":"crossref","first-page":"5883","DOI":"10.1080\/00207540601156215","volume":"46","author":"A. A. Upasani","year":"2008","unstructured":"Upasani, A. A., & Uzsoy, R. (2008). Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a\u00a0simulation study. International Journal of Production Research, 46(21), 5883\u20135905.","journal-title":"International Journal of Production Research"},{"issue":"4","key":"222_CR107","doi-asserted-by":"crossref","first-page":"270","DOI":"10.1109\/66.97809","volume":"4","author":"R. Uzsoy","year":"1991","unstructured":"Uzsoy, R., Martin-Vega, L. A., Lee, C. Y., & Leonard, P. A. (1991). Production scheduling algorithms for a semiconductor test facility. IEEE Transactions on Semiconductor Manufacturing, 4(4), 270\u2013280.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"222_CR108","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/07408179208964233","volume":"24","author":"R. Uzsoy","year":"1992","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. (1992). A\u00a0review of production planning and scheduling models in the semiconductor industry, part\u00a0I: system characteristics, performance evaluation, and production planning. IIE Transactions, 24, 47\u201360.","journal-title":"IIE Transactions"},{"key":"222_CR109","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/07408179408966627","volume":"26","author":"R. Uzsoy","year":"1994","unstructured":"Uzsoy, R., Lee, C. Y., & Martin-Vega, L. (1994). A\u00a0review of production planning and scheduling models in the semiconductor industry, part\u00a0II: shop floor control. IIE Transactions, 26, 44\u201355.","journal-title":"IIE Transactions"},{"key":"222_CR110","doi-asserted-by":"crossref","first-page":"1271","DOI":"10.1080\/002075400188843","volume":"38","author":"R. Uzsoy","year":"2000","unstructured":"Uzsoy, R., & Wang, C.-S. (2000). Performance of decomposition procedures for job-shop scheduling problems with bottleneck machines. International Journal of Production Research, 38, 1271\u20131286.","journal-title":"International Journal of Production Research"},{"key":"222_CR111","doi-asserted-by":"crossref","first-page":"1621","DOI":"10.1016\/S0305-0548(01)00031-4","volume":"29","author":"C. S. Wang","year":"2002","unstructured":"Wang, C. S., & Uzsoy, R. (2002). A\u00a0genetic algorithm to minimize maximum lateness on a batch processing machine. Computers and Operations Research, 29, 1621\u20131640.","journal-title":"Computers and Operations Research"},{"issue":"8","key":"222_CR112","doi-asserted-by":"crossref","first-page":"2165","DOI":"10.1080\/00207540902744784","volume":"7","author":"G. Weigert","year":"2010","unstructured":"Weigert, G., Klemmt, A., & Horn, S. (2010). Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor back-end facility. International Journal of Production Research, 7(8), 2165\u20132184.","journal-title":"International Journal of Production Research"},{"key":"222_CR113","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/66.4384","volume":"1","author":"L. Wein","year":"1988","unstructured":"Wein, L. (1988). Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 1, 115\u2013130.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"issue":"4","key":"222_CR114","doi-asserted-by":"crossref","first-page":"285","DOI":"10.1002\/nav.20144","volume":"53","author":"T. G. Yeung","year":"2006","unstructured":"Yeung, T. G., & Mason, S. J. (2006). Using real options analysis to value reoptimization options in the shifting bottleneck heuristic. Naval Research Logistics, 53(4), 285\u2013297.","journal-title":"Naval Research Logistics"},{"key":"222_CR115","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1023\/A:1008904604531","volume":"10","author":"S. J. Yim","year":"1999","unstructured":"Yim, S. J., & Lee, D. Y. (1999). Scheduling cluster tools in wafer fabrication using candidate list and simulated annealing. Journal of Intelligent Manufacturing, 10, 531\u2013540.","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"222_CR116","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1109\/TSM.2007.914388","volume":"21","author":"H. J. Yoon","year":"2008","unstructured":"Yoon, H. J., & Shen, W. (2008). A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints. IEEE Transactions on Semiconductor Manufacturing, 21(1), 83\u201391.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"222_CR117","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1109\/ASMC.2008.4529063","volume-title":"Advanced semiconductor manufacturing conference 2008 (ASMC 2008)","author":"C. Yugma","year":"2008","unstructured":"Yugma, C., Dauzere-Peres, S., Derreumaux, A., & Sibille, O. (2008). A\u00a0batch optimization software for diffusion area scheduling in semiconductor manufacturing. In Advanced semiconductor manufacturing conference 2008 (ASMC 2008) (pp. 327\u2013332)."},{"key":"222_CR118","doi-asserted-by":"crossref","unstructured":"Yurtsever, T., Kutanoglu, E., & Johns, J. (2009, to appear). Heuristic based scheduling system for diffusion in semiconductor manufacturing. In: Proceedings of the 2009 winter simulation conference.","DOI":"10.1109\/WSC.2009.5429171"},{"key":"222_CR119","doi-asserted-by":"crossref","first-page":"336","DOI":"10.1016\/j.ejor.2004.03.027","volume":"167","author":"J. Zoghby","year":"2005","unstructured":"Zoghby, J., Barnes, J. W., & Hasenbein, J. J. (2005). Modeling the reentrant job shop scheduling problem with set-ups for metaheuristic searches. European Journal of Operational Research, 167, 336\u2013348.","journal-title":"European Journal of Operational Research"},{"key":"222_CR120","volume-title":"Intelligent scheduling","author":"M. Zweben","year":"1994","unstructured":"Zweben, M., & Fox, M. S. (1994). Intelligent scheduling. San Francisco: Morgan Kaufman."}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-010-0222-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-010-0222-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-010-0222-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,11,17]],"date-time":"2021-11-17T01:10:17Z","timestamp":1637111417000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-010-0222-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,1,7]]},"references-count":120,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2011,12]]}},"alternative-id":["222"],"URL":"https:\/\/doi.org\/10.1007\/s10951-010-0222-9","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,1,7]]}}}