{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,9]],"date-time":"2026-04-09T04:15:53Z","timestamp":1775708153375,"version":"3.50.1"},"reference-count":13,"publisher":"Springer Science and Business Media LLC","issue":"5","license":[{"start":{"date-parts":[[2011,8,6]],"date-time":"2011-08-06T00:00:00Z","timestamp":1312588800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1007\/s10951-011-0248-7","type":"journal-article","created":{"date-parts":[[2011,8,5]],"date-time":"2011-08-05T17:07:49Z","timestamp":1312564069000},"page":"565-578","source":"Crossref","is-referenced-by-count":37,"title":["Scheduling flexible maintenance activities subject to job-dependent machine deterioration"],"prefix":"10.1007","volume":"15","author":[{"given":"Stefan","family":"Bock","sequence":"first","affiliation":[]},{"given":"Dirk","family":"Briskorn","sequence":"additional","affiliation":[]},{"given":"Andrei","family":"Horbach","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2011,8,6]]},"reference":[{"key":"248_CR1","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-540-24804-0","volume-title":"Scheduling algorithms","author":"P. Brucker","year":"2004","unstructured":"Brucker, P. (2004). Scheduling algorithms. Berlin: Springer."},{"key":"248_CR2","doi-asserted-by":"crossref","first-page":"90","DOI":"10.1016\/j.ejor.2007.06.029","volume":"190","author":"J.-S. Chen","year":"2008","unstructured":"Chen, J.-S. (2008). Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan. European Journal of Operational Research, 190, 90\u2013102.","journal-title":"European Journal of Operational Research"},{"key":"248_CR3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"T. Cheng","year":"2004","unstructured":"Cheng, T., Ding, Q., & Lin, B. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152, 1\u201313.","journal-title":"European Journal of Operational Research"},{"key":"248_CR4","first-page":"236","volume":"5","author":"R. L. Graham","year":"1979","unstructured":"Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimisation and approximation in deterministic sequencing and scheduling: a\u00a0survey. Annals of Discrete Mathematics, 5, 236\u2013287.","journal-title":"Annals of Discrete Mathematics"},{"key":"248_CR5","doi-asserted-by":"crossref","first-page":"1041","DOI":"10.1057\/jors.2009.30","volume":"61","author":"A. Janiak","year":"2010","unstructured":"Janiak, A., & Rudek, R. (2010). Scheduling jobs under an aging effect. Journal of the Operational Research Society, 61, 1041\u20131048.","journal-title":"Journal of the Operational Research Society"},{"key":"248_CR6","first-page":"22-1","volume-title":"Handbook of scheduling: algorithms, models and performance analysis","author":"C.-Y. Lee","year":"2004","unstructured":"Lee, C.-Y. (2004). Machine scheduling with availability constraints. In J. Y.-T. Leung (Ed.), Handbook of scheduling: algorithms, models and performance analysis (pp. 22-1\u201322-13)."},{"issue":"1","key":"248_CR7","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1287\/mnsc.15.1.102","volume":"15","author":"J. M. Moore","year":"1968","unstructured":"Moore, J. M. (1968). An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Science, 15(1), 102\u2013109.","journal-title":"Management Science"},{"key":"248_CR8","doi-asserted-by":"crossref","first-page":"2541","DOI":"10.1016\/j.cor.2008.10.007","volume":"36","author":"G. Mosheiov","year":"2009","unstructured":"Mosheiov, G., & Sarig, A. (2009). Scheduling a maintenance activity and due-window assignment on a single machine. Computers & Operations Research, 36, 2541\u20132545.","journal-title":"Computers & Operations Research"},{"key":"248_CR9","series-title":"Springer series in operations research and financial engineering","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4419-0910-7","volume-title":"Planning and scheduling in manufacturing and services","author":"M. Pinedo","year":"2009","unstructured":"Pinedo, M. (2009). Springer series in operations research and financial engineering. Planning and scheduling in manufacturing and services (2nd ed.). Berlin: Springer.","edition":"2"},{"key":"248_CR10","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1016\/j.ijpe.2009.10.018","volume":"124","author":"K. Sun","year":"2010","unstructured":"Sun, K., & Li, H. (2010). Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines. International Journal of Production Economics, 124, 151\u2013158.","journal-title":"International Journal of Production Economics"},{"key":"248_CR11","doi-asserted-by":"crossref","first-page":"443","DOI":"10.1007\/s10951-010-0182-0","volume":"13","author":"D. Xu","year":"2010","unstructured":"Xu, D., Yin, Y., & Li, H. (2010). Scheduling jobs under increasing linear machine maintenance time. Journal of Scheduling, 13, 443\u2013449.","journal-title":"Journal of Scheduling"},{"key":"248_CR12","doi-asserted-by":"crossref","first-page":"528","DOI":"10.1016\/j.omega.2010.01.003","volume":"38","author":"S.-J. Yang","year":"2010","unstructured":"Yang, S.-J., & Yang, D.-L. (2010). Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities. Omega, 38, 528\u2013533.","journal-title":"Omega"},{"key":"248_CR13","doi-asserted-by":"crossref","first-page":"837","DOI":"10.1016\/j.apm.2009.07.002","volume":"34","author":"C.-L. Zhao","year":"2010","unstructured":"Zhao, C.-L., & Tang, H.-Y. (2010). Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan. Applied Mathematical Modelling, 34, 837\u2013841.","journal-title":"Applied Mathematical Modelling"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-011-0248-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-011-0248-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-011-0248-7","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:46Z","timestamp":1559468386000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-011-0248-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,8,6]]},"references-count":13,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2012,10]]}},"alternative-id":["248"],"URL":"https:\/\/doi.org\/10.1007\/s10951-011-0248-7","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,8,6]]}}}