{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:14:34Z","timestamp":1759666474358},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2011,11,12]],"date-time":"2011-11-12T00:00:00Z","timestamp":1321056000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2012,8]]},"DOI":"10.1007\/s10951-011-0257-6","type":"journal-article","created":{"date-parts":[[2011,11,11]],"date-time":"2011-11-11T15:49:01Z","timestamp":1321026541000},"page":"457-471","source":"Crossref","is-referenced-by-count":3,"title":["Maximizing the configuration robustness for parallel multi-purpose machines under setup cost constraints"],"prefix":"10.1007","volume":"15","author":[{"given":"Alexis","family":"Aubry","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mireille","family":"Jacomino","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andr\u00e9","family":"Rossi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marie-Laure","family":"Espinouse","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2011,11,12]]},"reference":[{"key":"257_CR1","doi-asserted-by":"crossref","first-page":"219","DOI":"10.1016\/S0305-0483(98)00042-5","volume":"27","author":"A. Allahverdi","year":"1999","unstructured":"Allahverdi, A., Gupta, J., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. OMEGA\u2014The International Journal of Management Science, 27, 219\u2013239.","journal-title":"OMEGA\u2014The International Journal of Management Science"},{"issue":"3","key":"257_CR2","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1016\/j.ejor.2006.06.060","volume":"187","author":"A. Allahverdi","year":"2008","unstructured":"Allahverdi, A., Cheng, T., & Kovalyov, M. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985\u20131032.","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"257_CR3","doi-asserted-by":"crossref","first-page":"1115","DOI":"10.1016\/j.ejor.2006.05.050","volume":"187","author":"A. Aubry","year":"2008","unstructured":"Aubry, A., Rossi, A., Espinouse, M. L., & Jacomino, M. (2008). Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint. European Journal of Operational Research, 187(3), 1115\u20131125.","journal-title":"European Journal of Operational Research"},{"key":"257_CR4","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1007\/PL00011380","volume":"88","author":"A. Ben-Tal","year":"2000","unstructured":"Ben-Tal, A., & Nemirovski, A. (2000). Robust solutions of linear programming problems contaminated with uncertain data. Mathematical Programming, 88, 411\u2013424.","journal-title":"Mathematical Programming"},{"issue":"1","key":"257_CR5","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1287\/opre.1030.0065","volume":"54","author":"D. Bertsimas","year":"2004","unstructured":"Bertsimas, D., & Sim, M. (2004). The price of robustness. Operations Research, 54(1), 35\u201353.","journal-title":"Operations Research"},{"key":"257_CR6","doi-asserted-by":"crossref","DOI":"10.1002\/9780470611432","volume-title":"Flexibility and robustness in scheduling","author":"J. C. Billaut","year":"2008","unstructured":"Billaut, J. C., Moukrim, A., & Sanlaville, E. (2008). Flexibility and robustness in scheduling. London: ISTE Ltd."},{"key":"257_CR7","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1023\/A:1018950911030","volume":"70","author":"P. Brucker","year":"1997","unstructured":"Brucker, P., Jurisch, B., & Kr\u00e4mer, A. (1997). Complexity of scheduling problems with multi-purpose machines. Annals of Operational Research, 70, 57\u201373.","journal-title":"Annals of Operational Research"},{"issue":"3","key":"257_CR8","doi-asserted-by":"crossref","first-page":"151","DOI":"10.1007\/s10951-007-0009-9","volume":"10","author":"E. Demeulemeester","year":"2007","unstructured":"Demeulemeester, E., & Herroelen, W. (2007). Introduction to the special issue: project scheduling under uncertainty. Journal of Scheduling, 10(3), 151\u2013152.","journal-title":"Journal of Scheduling"},{"key":"257_CR9","volume-title":"25th mini-Euro conference: uncertainty and robustness in planning and decision making (URPDM2010)","author":"E. Gurevsky","year":"2010","unstructured":"Gurevsky, E., Guschinskaya, O., & Dolgui, A. (2010). Assembly line balancing problems under uncertainties. In 25th mini-Euro conference: uncertainty and robustness in planning and decision making (URPDM2010), Portugal."},{"key":"257_CR10","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1023\/B:JOSH.0000013055.31639.f6","volume":"7","author":"N. Hall","year":"2004","unstructured":"Hall, N., & Posner, M. (2004). Sensitivity analysis for scheduling problems. Journal of Scheduling, 7, 49\u201383.","journal-title":"Journal of Scheduling"},{"key":"257_CR11","volume-title":"Advanced semiconductor manufacturing conference, ASMC2007, IEEE\/SEMI","author":"C. Johnzen","year":"2007","unstructured":"Johnzen, C., Dauzere-Peres, S., Vialetelle, P., & Yugma, C. (2007). Importance of qualification management for wafer fabs. In Advanced semiconductor manufacturing conference, ASMC2007, IEEE\/SEMI."},{"key":"257_CR12","volume-title":"Advanced semiconductor manufacturing conference, ASMC2009, IEEE\/SEMI","author":"C. Johnzen","year":"2009","unstructured":"Johnzen, C., Dauz\u00e8re-P\u00e9r\u00e8s, S., Vialetelle, P., & Yugma, C. (2009). Optimizing flexibility and equipment utilization through qualification management. In Advanced semiconductor manufacturing conference, ASMC2009, IEEE\/SEMI."},{"key":"257_CR13","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4757-2620-6","volume-title":"Robust discrete optimization and its applications","author":"P. Kouvelis","year":"1997","unstructured":"Kouvelis, P., & Yu, G. (1997). Robust discrete optimization and its applications. Dordrecht: Kluwer Academic."},{"key":"257_CR14","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/j.ijpe.2008.09.003","volume":"116","author":"J. T. Leung","year":"2009","unstructured":"Leung, J. T., & Li, C. L. (2009). Scheduling with processing set restrictions: a survey. International Journal of Production Economics, 116, 251\u2013262.","journal-title":"International Journal of Production Economics"},{"key":"257_CR15","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1109\/TSM.2005.858472","volume":"18","author":"T. Miwa","year":"2005","unstructured":"Miwa, T., Nishihara, N., & Yamamoto, K. (2005). Automated stepper load balance allocation system. IEEE Transactions on Semiconductor Manufacturing, 18, 510\u2013516.","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"257_CR16","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1007\/s10288-005-0066-x","volume":"3","author":"R. Montemanni","year":"2005","unstructured":"Montemanni, R., & Gambardella, L. (2005). The robust shortest path problem with interval data via benders decomposition. 4OR, 3, 315\u2013328.","journal-title":"4OR"},{"key":"257_CR17","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/S0020-0190(99)00108-8","volume":"71","author":"L. Nourine","year":"1999","unstructured":"Nourine, L., & Raynaud, O. (1999). A fast algorithm for building lattices. Information Processing Letters, 71, 199\u2013204.","journal-title":"Information Processing Letters"},{"key":"257_CR18","unstructured":"Rossi, A. (2003). Ordonnancement en milieu incertain, mise en \u0153uvre d\u2019une d\u00e9marche robuste. Ph.D. thesis, Institut National Polytechnique de Grenoble, France."},{"issue":"4","key":"257_CR19","doi-asserted-by":"crossref","first-page":"1013","DOI":"10.1080\/00207540802473997","volume":"48","author":"A. Rossi","year":"2010","unstructured":"Rossi, A. (2010). A robustness measure of the configuration of multi-purpose machines. International Journal of Production Research, 48(4), 1013\u20131033.","journal-title":"International Journal of Production Research"},{"key":"257_CR20","doi-asserted-by":"crossref","first-page":"373","DOI":"10.3166\/jesa.38.373-395","volume":"34","author":"A. Rossi","year":"2004","unstructured":"Rossi, A., Jacomino, M., & Espinouse, M. L. (2004). \u00c9tude de\u00a0robustesse: configuration d\u2019un parc de machines partiellement multifonctions. Journal Europ\u00e9en des Syst\u00e8mes Automatis\u00e9s, 34, 373\u2013395.","journal-title":"Journal Europ\u00e9en des Syst\u00e8mes Automatis\u00e9s"},{"issue":"3","key":"257_CR21","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/j.ejor.2008.12.036","volume":"200","author":"B. Roy","year":"2010","unstructured":"Roy, B. (2010). Robustness in operational research and decision aiding: a multi-faceted issue. European Journal of Operational Research, 200(3), 629\u2013638. doi: 10.1016\/j.ejor.2008.12.036 .","journal-title":"European Journal of Operational Research"},{"key":"257_CR22","doi-asserted-by":"crossref","first-page":"72","DOI":"10.1007\/978-1-4757-2876-7_4","volume-title":"Industrial applications of combinatorial optimization","author":"Y. Sotskov","year":"1998","unstructured":"Sotskov, Y., Tanaev, V., & Werner, F. (1998a). Stability radius of an optimal schedule: a survey and recent developments. In Yu, G. (Ed.) Industrial applications of combinatorial optimization (pp. 72\u2013108). Dordrecht: Kluwer Academic."},{"key":"257_CR23","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1023\/A:1018960030420","volume":"83","author":"Y. Sotskov","year":"1998","unstructured":"Sotskov, Y., Wagelmans, A., & Werner, F. (1998b). On the calculation of the stability radius of an optimal or an approximate schedule. Annals of Operations Research, 83, 213\u2013252.","journal-title":"Annals of Operations Research"},{"key":"257_CR24","doi-asserted-by":"crossref","first-page":"2034","DOI":"10.1016\/j.cor.2006.10.002","volume":"35","author":"F. Taniguchi","year":"2008","unstructured":"Taniguchi, F., Yamada, T., & Kataoka, S. (2008). Heuristic and exact algorithms for the max-min optimization of the multi-scenario knapsack problem. Computers and Operations Research, 35, 2034\u20132048.","journal-title":"Computers and Operations Research"},{"key":"257_CR25","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1002\/(SICI)1099-1360(199905)8:3<181::AID-MCDA242>3.0.CO;2-P","volume":"8","author":"P. Vincke","year":"1999","unstructured":"Vincke, P. (1999). Robust solutions and methods in decision-aid. Journal of Multi-Criteria Decision Analysis, 8, 181\u2013187.","journal-title":"Journal of Multi-Criteria Decision Analysis"},{"key":"257_CR26","first-page":"47","volume-title":"Semiconductor fabtech","author":"T. Williams","year":"1999","unstructured":"Williams, T. (1999). Recipe management: a matter of efficiency. In Semiconductor fabtech (pp. 47\u201351)."},{"key":"257_CR27","doi-asserted-by":"crossref","first-page":"570","DOI":"10.1016\/S0377-2217(03)00373-4","volume":"158","author":"P. Zieli\u0144ski","year":"2004","unstructured":"Zieli\u0144ski, P. (2004). The computational complexity of the relative robust shortest path problem with interval data. European Journal of Operational Research, 158, 570\u2013576.","journal-title":"European Journal of Operational Research"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-011-0257-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-011-0257-6\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-011-0257-6","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T09:39:46Z","timestamp":1559468386000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-011-0257-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,11,12]]},"references-count":27,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2012,8]]}},"alternative-id":["257"],"URL":"https:\/\/doi.org\/10.1007\/s10951-011-0257-6","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2011,11,12]]}}}