{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,22]],"date-time":"2026-01-22T01:36:25Z","timestamp":1769045785537,"version":"3.49.0"},"reference-count":27,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2012,12,7]],"date-time":"2012-12-07T00:00:00Z","timestamp":1354838400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2013,2]]},"DOI":"10.1007\/s10951-012-0304-y","type":"journal-article","created":{"date-parts":[[2012,12,6]],"date-time":"2012-12-06T16:38:42Z","timestamp":1354811922000},"page":"29-45","source":"Crossref","is-referenced-by-count":9,"title":["Scheduling satellite launch missions: an MILP approach"],"prefix":"10.1007","volume":"16","author":[{"given":"Paolo","family":"Brandimarte","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,12,7]]},"reference":[{"key":"304_CR1","doi-asserted-by":"crossref","first-page":"86","DOI":"10.1016\/j.ejor.2003.08.027","volume":"161","author":"H Aytug","year":"2005","unstructured":"Aytug, H., Lawley, M., McKay, K., Mohan, S., & Uzsoy, R. (2005). Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research, 161, 86\u2013110.","journal-title":"European Journal of Operational Research"},{"key":"304_CR2","doi-asserted-by":"crossref","unstructured":"Baker, K. R., & Trietsch, D. (2007). Safe scheduling. INFORMS Tutorials in OR, pp. 79\u2013101.","DOI":"10.1287\/educ.1073.0031"},{"key":"304_CR3","doi-asserted-by":"crossref","first-page":"245","DOI":"10.1002\/(SICI)1099-1425(199911\/12)2:6<245::AID-JOS28>3.0.CO;2-5","volume":"2","author":"P Baptiste","year":"1999","unstructured":"Baptiste, P. (1999). Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine when processing times are equal. Journal of Scheduling, 2, 245\u2013252.","journal-title":"Journal of Scheduling"},{"key":"304_CR4","doi-asserted-by":"crossref","first-page":"1023","DOI":"10.1016\/j.mcm.2005.12.004","volume":"43","author":"L Barbulescu","year":"2006","unstructured":"Barbulescu, L., Howe, A., & Whitley, D. (2006). AFSCN scheduling: How the problem and solution have evolved. Mathematical and Computer Modelling, 43, 1023\u20131037.","journal-title":"Mathematical and Computer Modelling"},{"key":"304_CR5","doi-asserted-by":"crossref","first-page":"750","DOI":"10.1016\/j.ejor.2005.12.026","volume":"177","author":"N Bianchessi","year":"2007","unstructured":"Bianchessi, N., Cordeau, J.-F., Desrosiers, J., Laporte, G., & Raymond, V. (2007). A heuristic for the multi-satellite, multi-orbit and multi-user management of earth observation satellites. European Journal of Operational Research, 177, 750\u2013762.","journal-title":"European Journal of Operational Research"},{"key":"304_CR6","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/S0377-2217(98)00029-0","volume":"114","author":"P Brandimarte","year":"1999","unstructured":"Brandimarte, P. (1999). Exploiting process plan flexibility in production scheduling: A multi-objective approach. European Journal of Operational Research, 114, 59\u201371.","journal-title":"European Journal of Operational Research"},{"key":"304_CR7","doi-asserted-by":"crossref","first-page":"2997","DOI":"10.1080\/00207540500435116","volume":"44","author":"P Brandimarte","year":"2006","unstructured":"Brandimarte, P. (2006). Multi-item capacitated lot-sizing with demand uncertainty. International Journal of Production Research, 44, 2997\u20133022.","journal-title":"International Journal of Production Research"},{"key":"304_CR8","doi-asserted-by":"crossref","first-page":"1697","DOI":"10.1080\/002075499190969","volume":"37","author":"P Brandimarte","year":"1999","unstructured":"Brandimarte, P., & Maiocco, M. (1999). Job shop scheduling with a non-regular objective: A comparison of neighborhood structures based on a sequencing\/timing decomposition. International Journal of Production Research, 37, 1697\u20131725.","journal-title":"International Journal of Production Research"},{"key":"304_CR9","unstructured":"Brandimarte, P., & Villa, A. (1995). Advanced models for manufacturing systems management. Boca Raton, FL: CRC Press."},{"key":"304_CR10","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1287\/msom.4.1.25.287","volume":"49","author":"S Chand","year":"2002","unstructured":"Chand, S., Hsu, V. N., & Sethi, S. (2002). Forecast, solution, and rolling horizons in operations management problems: A classified bibliography. Manufacturing & Service Operations Management, 49, 25\u201343.","journal-title":"Manufacturing & Service Operations Management"},{"key":"304_CR11","doi-asserted-by":"crossref","unstructured":"Fisher, M., & Jaikumar, R. (1978). An algorithm for the space-shuttle scheduling problem. Operations Research, 26, 166\u2013182.","DOI":"10.1287\/opre.26.1.166"},{"key":"304_CR12","doi-asserted-by":"crossref","unstructured":"Fisher, M., Ramdas, K., & Zheng, Y.-S. (2001). Ending inventory valuation in multiperiod production scheduling. Management Science, 45, 679\u2013692.","DOI":"10.1287\/mnsc.47.5.679.10485"},{"key":"304_CR13","doi-asserted-by":"crossref","first-page":"533","DOI":"10.1016\/S0377-2217(01)00188-6","volume":"139","author":"V Gabrel","year":"2002","unstructured":"Gabrel, V., & Vanderpooten, D. (2002). Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite. European Journal of Operational Research, 139, 533\u2013542.","journal-title":"European Journal of Operational Research"},{"key":"304_CR14","doi-asserted-by":"crossref","first-page":"1164","DOI":"10.1287\/mnsc.43.8.1164","volume":"43","author":"B Gavish","year":"1997","unstructured":"Gavish, B., & Kalvenes, J. (1997). LEOS: Optimal satellite launch policies: The static case. Management Science, 43, 1164\u20131176.","journal-title":"Management Science"},{"key":"304_CR15","doi-asserted-by":"crossref","first-page":"386","DOI":"10.1111\/j.1937-5956.2004.tb00225.x","volume":"13","author":"B Gavish","year":"2004","unstructured":"Gavish, B., & Kalvenes, J. (2004). Dynamic policies for optimal LEO satellite launches. Production and Operations Management, 13, 386\u2013397.","journal-title":"Production and Operations Management"},{"key":"304_CR16","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4613-0303-9_33","volume-title":"Tabu search","author":"F Glover","year":"1998","unstructured":"Glover, F., & Laguna, M. (1998). Tabu search. New York: Springer."},{"key":"304_CR17","doi-asserted-by":"crossref","unstructured":"Grimme, C., Lepping, J., & Schwiegelshohn, U. (2012). Multi-criteria scheduling: An agent-based approach for expert knowledge integration. Journal of Scheduling, doi: 10.1007\/s10951-011-0256-7 .","DOI":"10.1007\/s10951-011-0256-7"},{"key":"304_CR18","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1287\/opre.26.1.121","volume":"26","author":"H Kise","year":"1978","unstructured":"Kise, H., Ibaraki, T., & Mine, H. (1978). A solvable case of the one-machine scheduling problem with ready and due times. Operations Research, 26, 121\u2013126.","journal-title":"Operations Research"},{"key":"304_CR19","volume-title":"Simulation modeling and analysis","author":"A Law","year":"1999","unstructured":"Law, A., & Kelton, W. (1999). Simulation modeling and analysis (3rd ed.). New York: McGraw-Hill.","edition":"3"},{"key":"304_CR20","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1287\/mnsc.15.1.102","volume":"15","author":"J Moore","year":"1968","unstructured":"Moore, J. (1968). Sequencing $$n$$ jobs on one machine to minimize the number of tardy jobs. Management Science, 15, 102\u2013109.","journal-title":"Management Science"},{"key":"304_CR21","doi-asserted-by":"crossref","first-page":"747","DOI":"10.1016\/j.ejor.2004.10.026","volume":"172","author":"L Morgan","year":"2006","unstructured":"Morgan, L., Morton, A., & Daniels, R. (2006). Simultaneously determining the mix of space launch vehicles and the assignment of satellites to rockets. European Journal of Operational Research, 172, 747\u2013760.","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"304_CR22","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1109\/37.120450","volume":"12","author":"N Muscettola","year":"1992","unstructured":"Muscettola, N., Smith, S., Cesta, A., & D\u2019Aloisi, D. (1992). Coordinating space telescope operations in an integrated planning and scheduling architecture. IEEE Control Systems Magazine, 12(1), 28\u201337.","journal-title":"IEEE Control Systems Magazine"},{"key":"304_CR23","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/S0377-2217(97)00408-6","volume":"112","author":"J Nowakovski","year":"1999","unstructured":"Nowakovski, J., Schw\u00e4rzler, W., & Triesch, E. (1999). Using the generalized assignment problem in scheduling the ROSAT space telescope. European Journal of Operational Research, 112, 531\u2013541.","journal-title":"European Journal of Operational Research"},{"key":"304_CR24","volume-title":"Multicriteria scheduling: Theory, models and algorithms","author":"V T\u2019Kindt","year":"2006","unstructured":"T\u2019Kindt, V., & Billaut, J.-C. (2006). Multicriteria scheduling: Theory, models and algorithms (2nd ed.). Heidelberg: Springer.","edition":"2"},{"issue":"5","key":"304_CR25","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1287\/inte.33.5.36.19250","volume":"33","author":"R Tyagi","year":"2003","unstructured":"Tyagi, R., & Bollapragada, S. (2003). SES Americom maximizes satellite revenues by optimally configuring transponders. Interfaces, 33(5), 36\u2013443.","journal-title":"Interfaces"},{"key":"304_CR26","volume-title":"Integer Programming","author":"L Wolsey","year":"1998","unstructured":"Wolsey, L. (1998). Integer Programming. New York: Wiley."},{"key":"304_CR27","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1007\/s10951-006-0326-4","volume":"10","author":"D Yamashita","year":"2007","unstructured":"Yamashita, D., Armentano, V., & Laguna, M. (2007). Robust optimization models for project scheduling with resource availability cost. Journal of Scheduling, 10, 67\u201376.","journal-title":"Journal of Scheduling"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-012-0304-y.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-012-0304-y\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-012-0304-y","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,6]],"date-time":"2019-07-06T19:25:58Z","timestamp":1562441158000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-012-0304-y"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,12,7]]},"references-count":27,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2013,2]]}},"alternative-id":["304"],"URL":"https:\/\/doi.org\/10.1007\/s10951-012-0304-y","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,12,7]]}}}