{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,5]],"date-time":"2025-10-05T12:09:44Z","timestamp":1759666184877},"reference-count":32,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2012,12,27]],"date-time":"2012-12-27T00:00:00Z","timestamp":1356566400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2013,6]]},"DOI":"10.1007\/s10951-012-0306-9","type":"journal-article","created":{"date-parts":[[2012,12,26]],"date-time":"2012-12-26T14:51:36Z","timestamp":1356533496000},"page":"331-336","source":"Crossref","is-referenced-by-count":16,"title":["Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns"],"prefix":"10.1007","volume":"16","author":[{"given":"Yebin","family":"Zhang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xianyi","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xian","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2012,12,27]]},"reference":[{"key":"306_CR1","doi-asserted-by":"crossref","first-page":"573","DOI":"10.1016\/j.ergon.2011.05.001","volume":"41","author":"MJ Anzanello","year":"2011","unstructured":"Anzanello, M. J., & Fogliatto, F. S. (2011). Learning curve models and applications: Literature review and research directions. International Journal of Industrial Ergonomics, 41, 573\u2013583.","journal-title":"International Journal of Industrial Ergonomics"},{"key":"306_CR2","doi-asserted-by":"crossref","first-page":"661","DOI":"10.1002\/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO;2-3","volume":"37","author":"J Birge","year":"1990","unstructured":"Birge, J., Frenk, J. B. G., Mittenthal, J., & Rinnooy Kan, A. H. G. (1990). Single-machine scheduling subject to stochastic breakdowns. Naval Research Logistics, 37, 661\u2013677.","journal-title":"Naval Research Logistics"},{"key":"306_CR3","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0377-2217(98)00246-X","volume":"115","author":"D Biskup","year":"1999","unstructured":"Biskup, D. (1999). Single-machine scheduling with learning considerations. European Journal of Operational Research, 115, 173\u2013178.","journal-title":"European Journal of Operational Research"},{"key":"306_CR4","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1016\/j.ejor.2007.05.040","volume":"188","author":"D Biskup","year":"2008","unstructured":"Biskup, D. (2008). A state-of-the-art review on scheduling with learning effects. European Journal of Operational Research, 188, 315\u2013329.","journal-title":"European Journal of Operational Research"},{"key":"306_CR5","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1017\/S0269964803174037","volume":"17","author":"X Cai","year":"2003","unstructured":"Cai, X., Sun, X., & Zhou, X. (2003). Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime. Probability in the Engineering and Informational Sciences, 17, 467\u2013485.","journal-title":"Probability in the Engineering and Informational Sciences"},{"key":"306_CR6","doi-asserted-by":"crossref","first-page":"800","DOI":"10.1002\/nav.20024","volume":"51","author":"X Cai","year":"2004","unstructured":"Cai, X., Sun, X., & Zhou, X. (2004). Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria. Naval Research Logistics, 51, 800\u2013817.","journal-title":"Naval Research Logistics"},{"issue":"4","key":"306_CR7","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1007\/s10951-007-0026-8","volume":"10","author":"X Cai","year":"2007","unstructured":"Cai, X., Wang, L., & Zhou, Xian. (2007). Single-machine scheduling to stochastically minimize maximum lateness. Journal of Scheduling, 10(4), 293\u2013301.","journal-title":"Journal of Scheduling"},{"key":"306_CR8","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1109\/TASE.2005.844119","volume":"2","author":"X Cai","year":"2005","unstructured":"Cai, X., Wu, X., & Zhou, X. (2005). Dynamically optimal policies for stochastic scheduling subject to preemptive-repeat machine breakdowns. IEEE Transactions on Automation Science and Engineering, 2, 158\u2013172.","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"306_CR9","doi-asserted-by":"crossref","first-page":"1236","DOI":"10.1287\/opre.1080.0660","volume":"57","author":"X Cai","year":"2009","unstructured":"Cai, X., Wu, X., & Zhou, X. (2009). Stochastic scheduling subject to preemptive-repeat breakdowns with incomplete information. Operations Research, 57, 1236\u20131249.","journal-title":"Operations Research"},{"issue":"2","key":"306_CR10","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1007\/s10951-009-0132-x","volume":"14","author":"X Cai","year":"2011","unstructured":"Cai, X., Wu, X., & Zhou, X. (2011). Scheduling deteriorating jobs on a single machine subject to breakdowns. Journal of Scheduling, 14(2), 173\u2013186.","journal-title":"Journal of Scheduling"},{"key":"306_CR11","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1287\/opre.47.3.422","volume":"47","author":"X Cai","year":"1999","unstructured":"Cai, X., & Zhou, X. (1999). Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost. Operations Research, 47, 422\u2013437.","journal-title":"Operations Research"},{"key":"306_CR12","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1023\/A:1019220826984","volume":"98","author":"X Cai","year":"2000","unstructured":"Cai, X., & Zhou, X. (2000). Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine. Annals of Operations Research, 98, 313\u2013331.","journal-title":"Annals of Operations Research"},{"issue":"3","key":"306_CR13","doi-asserted-by":"crossref","first-page":"658","DOI":"10.1287\/moor.18.3.658","volume":"18","author":"C Chang","year":"1993","unstructured":"Chang, C., & Yao, D. (1993). Rearrangement, majorization and stochastic scheduling. Mathmatics of Operations Research, 18(3), 658\u2013684.","journal-title":"Mathmatics of Operations Research"},{"key":"306_CR14","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(02)00909-8","volume":"152","author":"TCE Cheng","year":"2004","unstructured":"Cheng, T. C. E., Ding, Q., & Lin, B. M. T. (2004). A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152, 1\u201313.","journal-title":"European Journal of Operational Research"},{"key":"306_CR15","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1002\/nav.3800310207","volume":"31","author":"KD Glazebrook","year":"1984","unstructured":"Glazebrook, K. D. (1984). Scheduling stochastic jobs on a single machine subject to breakdowns. Naval Research Logistics Quarterly, 31, 251\u2013264.","journal-title":"Naval Research Logistics Quarterly"},{"key":"306_CR16","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1017\/S026996480000190X","volume":"5","author":"KD Glazebrook","year":"1991","unstructured":"Glazebrook, K. D. (1991). On nonpreemptive policies for stochastic single-machine scheduling with breakdowns. Probability in the Engineering and Informational Sciences, 5, 77\u201387.","journal-title":"Probability in the Engineering and Informational Sciences"},{"key":"306_CR17","doi-asserted-by":"crossref","unstructured":"Glazebrook, K. D., Assell, P. S., Dunn, R. T., & Lumley, R. R. (2004). On the optimal service to impatient tasks. Journal of Applied Probability, 41, 51\u201372.","DOI":"10.1239\/jap\/1077134667"},{"key":"306_CR18","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ejor.2006.01.030","volume":"178","author":"C Koulamas","year":"2007","unstructured":"Koulamas, C., & Kyparisis, G. J. (2007). Single-machine and two-machine flowshop scheduling with general learning functions. European Journal of Operational Research, 178, 402\u2013407.","journal-title":"European Journal of Operational Research"},{"key":"306_CR19","doi-asserted-by":"crossref","first-page":"1184","DOI":"10.1016\/j.ejor.2005.03.020","volume":"174","author":"WH Kuo","year":"2006","unstructured":"Kuo, W. H., & Yang, D. L. (2006). Minimizing the total completion time in a single machine scheduling problem with a time-dependent learning effect. European Journal of Operational Research, 174, 1184\u20131190.","journal-title":"European Journal of Operational Research"},{"key":"306_CR20","doi-asserted-by":"crossref","first-page":"5515","DOI":"10.1016\/j.ins.2011.07.051","volume":"181","author":"WC Lee","year":"2011","unstructured":"Lee, W. C. (2011). Scheduling with general position-based learning curves. Information Science, 181, 5515\u20135522.","journal-title":"Information Science"},{"key":"306_CR21","doi-asserted-by":"crossref","unstructured":"Mosheiov, G. (2001). Scheduling problems with a learning effect. European Journal of Operational Research, 52, 687\u2013693.","DOI":"10.1016\/S0377-2217(00)00175-2"},{"key":"306_CR22","unstructured":"Pinedo, M. (2008). Scheduling: Theory, algorithms, and systems (3rd ed.). Englewood Cliffs: Prentice Hall."},{"key":"306_CR23","volume-title":"Stochastic orders and their applications","author":"R Righter","year":"1994","unstructured":"Righter, R. (1994). Scheduling. In M. Shaked & J. G. Shanthikumar (Eds.), Stochastic orders and their applications. Boston: Academic Press."},{"key":"306_CR24","doi-asserted-by":"crossref","unstructured":"Shaked, M., & Shanthikumar, J. G. (2007). Stochastic orders. New York: Springer Science+Business Media LLC.","DOI":"10.1007\/978-0-387-34675-5"},{"key":"306_CR25","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/j.ejor.2006.01.017","volume":"178","author":"X Wang","year":"2007","unstructured":"Wang, X., & Cheng, T. C. E. (2007). Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan. European Journal of Operational Research, 178, 57\u201370.","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"306_CR26","doi-asserted-by":"crossref","first-page":"327","DOI":"10.1016\/j.omega.2004.10.006","volume":"34","author":"J Wang","year":"2006","unstructured":"Wang, J., & Xia, Z. (2006). Flow shop scheduling with deteriorating jobs under dominating machines. Omega, 34(4), 327\u2013336.","journal-title":"Omega"},{"key":"306_CR27","doi-asserted-by":"crossref","first-page":"1280","DOI":"10.1016\/j.amc.2010.02.020","volume":"216","author":"JB Wang","year":"2010","unstructured":"Wang, J. B., Wang, D., & Zhang, G. D. (2010). Single-machine scheduling with learning functions. Applied Mathematics and Computation, 216, 1280\u2013126.","journal-title":"Applied Mathematics and Computation"},{"key":"306_CR28","doi-asserted-by":"crossref","first-page":"1553","DOI":"10.1016\/j.cie.2008.10.002","volume":"56","author":"CC Wu","year":"2009","unstructured":"Wu, C. C., & Lee, W. C. (2009). Single-machine and flowshop scheduling with a general learning effect model. Computers and Industrial Engineering, 56, 1553\u20131558.","journal-title":"Computers and Industrial Engineering"},{"key":"306_CR29","doi-asserted-by":"crossref","first-page":"790","DOI":"10.1016\/j.cie.2011.01.016","volume":"60","author":"CC Wu","year":"2011","unstructured":"Wu, C. C., Yin, Y. Q., & Cheng, S. R. (2011). Some single-machine scheduling problems with a truncation learning effect. Computers and Industrial Engineering, 60, 790\u2013795.","journal-title":"Computers and Industrial Engineering"},{"issue":"1","key":"306_CR30","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/j.ejor.2007.06.015","volume":"190","author":"X Wu","year":"2008","unstructured":"Wu, X., & Zhou, X. (2008). Stochastic scheduling to minimize expected maximum lateness. European Journal of Operational Research, 190(1), 103\u2013115.","journal-title":"European Journal of Operational Research"},{"key":"306_CR31","doi-asserted-by":"crossref","first-page":"2209","DOI":"10.1016\/j.ins.2011.01.018","volume":"181","author":"YQ Yin","year":"2011","unstructured":"Yin, Y. Q., Xu, D. H., & Huang, X. K. (2011). Notes on \u201cSome single-machine scheduling problems with general position-dependent and time-dependent learning effects\u201d. Information Science, 181, 2209\u20132217.","journal-title":"Information Science"},{"key":"306_CR32","doi-asserted-by":"crossref","first-page":"2416","DOI":"10.1016\/j.ins.2009.02.015","volume":"179","author":"YQ Yin","year":"2009","unstructured":"Yin, Y. Q., Xu, D. H., Sun, K. B., & Li, H. G. (2009). Some scheduling problems with general position-dependent and time-dependent learning effects. Information Science, 179, 2416\u20132425.","journal-title":"Information Science"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-012-0306-9.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-012-0306-9\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-012-0306-9","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,7]],"date-time":"2019-07-07T11:59:36Z","timestamp":1562500776000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-012-0306-9"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,12,27]]},"references-count":32,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,6]]}},"alternative-id":["306"],"URL":"https:\/\/doi.org\/10.1007\/s10951-012-0306-9","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,12,27]]}}}