{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,10]],"date-time":"2026-01-10T22:47:33Z","timestamp":1768085253979,"version":"3.49.0"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"6","license":[{"start":{"date-parts":[[2013,1,18]],"date-time":"2013-01-18T00:00:00Z","timestamp":1358467200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["J Sched"],"published-print":{"date-parts":[[2013,12]]},"DOI":"10.1007\/s10951-012-0310-0","type":"journal-article","created":{"date-parts":[[2013,1,16]],"date-time":"2013-01-16T22:29:27Z","timestamp":1358375367000},"page":"605-628","source":"Crossref","is-referenced-by-count":18,"title":["A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system"],"prefix":"10.1007","volume":"16","author":[{"given":"Richard","family":"Lusby","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Laurent Flindt","family":"Muller","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bj\u00f8rn","family":"Petersen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"297","published-online":{"date-parts":[[2013,1,18]]},"reference":[{"key":"310_CR1","doi-asserted-by":"crossref","unstructured":"Almakhlafi, A., & Knowles, J. (2012). Benchmarks for maintenance scheduling problems in power generation. In World congress on computational intelligence, June (pp. 10\u201315).","DOI":"10.1109\/CEC.2012.6252988"},{"key":"310_CR2","doi-asserted-by":"crossref","first-page":"238","DOI":"10.1007\/BF01386316","volume":"4","author":"JF Benders","year":"1962","unstructured":"Benders, J. F. (1962). Partitioning procedures for solving mixed variables programming problems. Numerische Mathematik, 4, 238\u2013252.","journal-title":"Numerische Mathematik"},{"key":"310_CR3","doi-asserted-by":"crossref","unstructured":"Cabero, J., Ventosa, M. J., Cerisola, S., & Ba\u00edllo, \u00c1. (2010). Modeling risk management in oligopolistic electricity markets: A Benders decomposition approach. IEEE Transactions on Power Systems, 25(1), 263\u2013271.","DOI":"10.1109\/TPWRS.2009.2036788"},{"key":"310_CR4","doi-asserted-by":"crossref","first-page":"759","DOI":"10.1016\/j.ejor.2006.11.018","volume":"184","author":"SP Canto","year":"2008","unstructured":"Canto, S. P. (2008). Application of Benders decomposition to power plant preventive maintenance scheduling. European Journal of Operational Research, 184, 759\u2013777.","journal-title":"European Journal of Operational Research"},{"key":"310_CR5","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1007\/s11081-011-9146-2","volume":"12","author":"SP Canto","year":"2011","unstructured":"Canto, S. P. (2011). Using 0\/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling. Optimization Engineering, 12, 333\u2013347.","journal-title":"Optimization Engineering"},{"key":"310_CR6","unstructured":"Contreras, I., Cordeau, J.-F., & Laporte, G. (2010). Benders decomposition for large scale uncapacitated hub location. Technical Report CIRRELT-2010-26, Interuniversity Research Centre on Enterprise Networks, Logistics, and Transportation."},{"key":"310_CR7","doi-asserted-by":"crossref","first-page":"771","DOI":"10.1016\/j.epsr.2006.06.012","volume":"77","author":"KP Dahal","year":"2007","unstructured":"Dahal, K. P., & Chakpitak, N. (2007). Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches. Electric Power Systems Research, 77, 771\u2013779.","journal-title":"Electric Power Systems Research"},{"key":"310_CR8","unstructured":"Darlay, J., Esperet, L., Kieffer, Y., Naves, G., & Weber, V. (2010). A functional programming approach for an energy planning problem. In EURO XXIV LISBON 24th European conference on operational research (p. 280)."},{"key":"310_CR9","doi-asserted-by":"crossref","unstructured":"Dopazo, J. F., & Merrill, H. M. (1975). Optimal generator maintenance scheduling using integer programming. IEEE Transactions on Power Apparatus and Systems, 94(5), 1537\u20131545.","DOI":"10.1109\/T-PAS.1975.31996"},{"key":"310_CR10","doi-asserted-by":"crossref","first-page":"673","DOI":"10.1016\/S0377-2217(02)00805-6","volume":"154","author":"EK Doyle","year":"2004","unstructured":"Doyle, E. K. (2004). On the application of stochastic models in nuclear power plant maintenance. European Journal of Operational Research, 154, 673\u2013690.","journal-title":"European Journal of Operational Research"},{"key":"310_CR11","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/S0378-7796(99)00079-6","volume":"54","author":"I El-Amin","year":"2000","unstructured":"El-Amin, I., Duffuaa, S., & Abbas, M. (2000). A tabu search algorithm for maintenance scheduling of generating units. Electric Power Systems Research, 54, 91\u201399.","journal-title":"Electric Power Systems Research"},{"key":"310_CR12","doi-asserted-by":"crossref","first-page":"35","DOI":"10.1016\/S0378-7796(02)00215-8","volume":"65","author":"MY El-Sharkh","year":"2003","unstructured":"El-Sharkh, M. Y., & El-Keib, A. A. (2003). An evolutionary programming-based solution methodology for power generation and transmission maintenance scheduling. Electric Power Systems Research, 65, 35\u201340.","journal-title":"Electric Power Systems Research"},{"key":"310_CR13","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1016\/j.ejor.2009.03.013","volume":"201","author":"O Guyon","year":"2010","unstructured":"Guyon, O., Lemaire, P., Pinson, E., & Rivreau, D. (2010). Cut generation for an integrated employee timetabling and production scheduling problem. European Journal of Operational Research, 201, 557\u2013567.","journal-title":"European Journal of Operational Research"},{"key":"310_CR14","unstructured":"Kjeldsen, N., Godskesen, S., Larsen, R., & Jensen, T. S. (2010). Constraint programming and local search for a large-scale energy management problem with varied constraints. In EURO XXIV LISBON 24th European conference on operational research (p. 219)."},{"key":"310_CR15","doi-asserted-by":"crossref","unstructured":"Kralj, B., & Rajakovi\u0107, N. (1994). Multiobjective programming in power system optimization: New approach to generator maintenance scheduling. Electrical Power and Energy Systems, 16(4), 211\u2013220.","DOI":"10.1016\/0142-0615(94)90012-4"},{"issue":"2","key":"310_CR16","doi-asserted-by":"crossref","first-page":"1079","DOI":"10.1109\/TPWRS.2005.846063","volume":"20","author":"Z Li","year":"2005","unstructured":"Li, Z., & Shahidehpour, M. (2005). Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets. IEEE Transactions on Power Systems, 20(2), 1079\u20131088.","journal-title":"IEEE Transactions on Power Systems"},{"key":"310_CR17","doi-asserted-by":"crossref","first-page":"1451","DOI":"10.1016\/j.cor.2003.11.013","volume":"32","author":"A Mercier","year":"2005","unstructured":"Mercier, A., Cordeau, J.-F., & Soumis, F. (2005). A computational study of Benders decomposition for the integrated aircraft routing and crew scheduling problem. Computers and Operations Research, 32, 1451\u20131476.","journal-title":"Computers and Operations Research"},{"key":"310_CR18","doi-asserted-by":"crossref","unstructured":"Mohanta, D. K., Sadhu, P. K., & Chakrabarti, R. (2007). Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA\/SA-based hybrid techniques: A comparison of results. Reliability Engineering and System Safety, 92(2), 187\u2013199.","DOI":"10.1016\/j.ress.2005.11.062"},{"key":"310_CR19","doi-asserted-by":"crossref","unstructured":"Morozowski, M., Fonseca, L., Oliveira, G., Melo, A., & Mello, J.C.O. (1995). Transmission constrained maintenance scheduling of generating units: A stochastic programming approach. IEEE Transactions on Power Systems, 10(2), 695\u2013701.","DOI":"10.1109\/59.387905"},{"key":"310_CR20","doi-asserted-by":"crossref","first-page":"519","DOI":"10.1002\/nav.20419","volume":"57","author":"J Naoum-Sawaya","year":"2010","unstructured":"Naoum-Sawaya, J., & Elhedhli, S. (2010). A nested Benders decomposition approach for telecommunication network planning. Naval Research Logistics, 57, 519\u2013539.","journal-title":"Naval Research Logistics"},{"issue":"9","key":"310_CR21","doi-asserted-by":"crossref","first-page":"1667","DOI":"10.1016\/j.apenergy.2009.01.022","volume":"86","author":"T Niknam","year":"2009","unstructured":"Niknam, T., Khodaei, A., & Fallahi, F. (2009). A new decomposition approach for the thermal unit commitment problem. Applied Energy, 86(9), 1667\u20131674.","journal-title":"Applied Energy"},{"key":"310_CR22","unstructured":"Porcheron, M., Gorge, A., Juan, O., Simovic, T., & Dereu, G. (2009). Challenge ROADEF\/EURO 2010: A large-scale energy management problem with varied constraints. http:\/\/challenge.roadef.org\/2010\/files\/sujetEDFv22.pdf ."},{"key":"310_CR23","doi-asserted-by":"crossref","unstructured":"Reihani, E., Sarikhani, A., Davodi, M., & Davodi, M. (2012). Reliability based generator maintenance scheduling using hybrid evolutionary approach. Electric Power and Energy Systems, 42(1), 434\u2013439.","DOI":"10.1016\/j.ijepes.2012.04.018"},{"key":"310_CR24","unstructured":"ROADEF Challenge. (2010). http:\/\/challenge.roadef.org\/2010\/ ."},{"key":"310_CR25","doi-asserted-by":"crossref","unstructured":"Santos, T. N., & Diniz, A. L. (2009). Feasibility and optimality cuts for the multi-stage Benders decomposition approach: Application to the network constrained hydrothermal scheduling. In Power and Energy Society general meeting, 2009. PES \u201909. IEEE.","DOI":"10.1109\/PES.2009.5275442"},{"key":"310_CR26","doi-asserted-by":"crossref","unstructured":"Saraiva, J. T., Pereira, M. L., Mendes, V. T., & Sousa, J. C. (2011). A simulated annealing based approach to solve the generator maintenance scheduling problem. Electric Power Systems Research, 81, 1283\u20131291.","DOI":"10.1016\/j.epsr.2011.01.013"},{"key":"310_CR27","doi-asserted-by":"crossref","unstructured":"Da Silva, E. L. (2000). Generation maintenance scheduling considering transmission constraints. Transactions on Power Systems, 15(2), 838\u2013843.","DOI":"10.1109\/59.867182"},{"key":"310_CR28","unstructured":"Soumis, F., Desaulniers, G., Gendreau, M., Rousseau, L.-M., Lessard, F., & Raymond, V. (2010). A mathematical-programming based solution approach for the EDF energy management problem. In EURO XXIV LISBON 24th European conference on operational research (p. 261)."},{"key":"310_CR29","unstructured":"Steiner, R., Pirkwieser, S., & Prandtstetter, M. (2010). An ACO\/VNS hybrid approach for a large-scale energy management problem. In EURO XXIV LISBON 24th European conference on operational research (p. 202)."},{"key":"310_CR30","unstructured":"Tokola, H., Ahlroth, L., & Schumacher, A. (2010). A local search algorithm with a repair procedure for the ROADEF 2010 challenge. In EURO XXIV LISBON 24th European conference on operational research."},{"key":"310_CR31","unstructured":"Wolfler-Calvo, R., L\u00e9tocart, L., Alfandri, L., Rozenkop, A., Chemla, D., & Turri, G. (2010). A column generation approach for scheduling nuclear power plants refueling. In EURO XXIV LISBON 24th European conference on operational research (p. 280)."},{"key":"310_CR32","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1007\/s12667-010-0015-4","volume":"1","author":"L Wu","year":"2010","unstructured":"Wu, L., & Shahidehpour, M. (2010). Accelerating the Benders decomposition for network-constrained unit commitment problems. Energy Systems, 1, 339\u2013376.","journal-title":"Energy Systems"},{"key":"310_CR33","doi-asserted-by":"crossref","unstructured":"Yare, Y., & Venayagamoorthy, G. K. (2010). Optimal maintenance scheduling of generators using multiple swarms\u2014MDPSO framework. Engineering Applications of Artificial Intelligence, 23, 895\u2013910.","DOI":"10.1016\/j.engappai.2010.05.006"},{"key":"310_CR34","doi-asserted-by":"crossref","unstructured":"Yare, Y., Venayagamoorthy, G. K., & Aliyu, U. O. (2008). Optimal generator maintenance scheduling using a modified discrete PSO. IET Proceedings on Generation, Transmission and Distribution, 2(6), 834\u2013846.","DOI":"10.1049\/iet-gtd:20080030"},{"issue":"2","key":"310_CR35","first-page":"476","volume":"94","author":"HH Zurn","year":"1975","unstructured":"Zurn, H. H., & Quintana, V. H. (1975). Generator maintenance scheduling via successive approximations dynamic programming. IEEE Transactions on Power Apparatus and Systems, 94(2), 476\u2013783.","journal-title":"IEEE Transactions on Power Apparatus and Systems"}],"container-title":["Journal of Scheduling"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-012-0310-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10951-012-0310-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10951-012-0310-0","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,7,8]],"date-time":"2019-07-08T07:25:50Z","timestamp":1562570750000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10951-012-0310-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,1,18]]},"references-count":35,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2013,12]]}},"alternative-id":["310"],"URL":"https:\/\/doi.org\/10.1007\/s10951-012-0310-0","relation":{},"ISSN":["1094-6136","1099-1425"],"issn-type":[{"value":"1094-6136","type":"print"},{"value":"1099-1425","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,1,18]]}}}